 10/18/2002  Permit Condition Or Consent Order/Response Due   Permits Issued For Thr Construction And Operation Of A Class I Landfill.  
 1/30/2003  Renewal Application Due    
 12/4/2003  Letter   Notification Of Sampling On Week Of December 10  
 12/29/2003  Financial Assurance Documents   Sent From Tallahassee On Dec. 24  
 1/26/2004  Landfill Inspection (Class 1)   Facility Accepted 1st Load Of Waste  
 4/19/2004  Landfill Inspection (Class 1)   Need To Submit Quarterly Reports  
 4/20/2004  Waste Quantity Report   1st Quarter 2004 (Jan.-Mar.)  
 4/29/2004  Gas Monitoring Report   Letter Requesting Exemption From Gas Monitoring  
 7/6/2004  Gas Monitoring Report   None Submitted Ok'D By Jim Bradner  
 7/6/2004  Waste Quantity Report   2nd Quarter 2004 (April-June)  
 7/14/2004  Letter   Notification Of Groundwater Sampling On July 19, 2004  
 7/16/2004  Letter   Notification Of Deficeient Financial  
 7/30/2004  Financial Assurance Documents   Financial Ok | 1,306,988 And 2,452,071 Financial And Ltc  
 11/4/2004  Permit Condition Or Consent Order/Response Due   Notifaction Of Volume At 1,700 Tons Per Day  
 11/10/2004  Groundwater Monitoring Report   Sampled July 2004  
 12/7/2004  Landfill Inspection (Class 1)    
 1/31/2005  Permit Condition Or Consent Order/Response Due   Modifying Operations Plan To Include Leachate Recirculation Under Certain Conditions  
 3/1/2005  Permit Condition Or Consent Order/Response Due   Annual Operating Report  
 3/23/2005  Landfill Inspection (Class 1)    
 3/25/2005  Groundwater Monitoring Report   January 2005 Sampling Event  
 4/18/2005  Waste Quantity Report   First Quarter 2005  
 5/26/2005  Financial Assurance Documents   Incompliance  
 6/10/2005  Landfill Inspection (Class 1)    
 6/30/2005  Permit Condition Or Consent Order/Response Due   Notification Of Samplng On July 25 For Two Weeks  
 7/6/2005  Submittal Received By Department   Validator Resubmittal Of July 2004 And January 2005 Sampling Events (Corrected)  
 9/28/2005  Landfill Inspection (Class 1)    
 10/5/2005  Waste Quantity Report   Third Quarter 2005  
 11/21/2005  Groundwater Monitoring Report   August 2005 Sampling Event  
 12/9/2005  Landfill Inspection (Class 1)    
 1/11/2006  Waste Quantity Report   4th Quarter 2005  
 2/24/2006  Financial Assurance Documents    
 3/29/2006  Landfill Inspection (Class 1)    
 4/13/2006  Waste Quantity Report   1st Quarter 2006  
 5/11/2006  Groundwater Monitoring Report   Feb. 2006 Sample Date  
 5/18/2006  Landfill Inspection (Class 1)    
 6/27/2006  Financial Assurance Documents   Incompliance  
 6/30/2006  Letter   Sampling Will Occur July 17, 2006  
 7/3/2006  Letter   Accepted Financial Complinace  
 7/7/2006  Waste Quantity Report   2nd Quarter 2006  
 7/20/2006  Landfill Inspection (Class 1)    
 10/2/2006  Groundwater Monitoring Report   Gwmr  
 10/2/2006  Groundwater Monitoring Report   July 2006 Sampling Event  
 10/2/2006  Groundwater Monitoring Report   July 2006 Sampling Event  
 10/13/2006  Waste Quantity Report   Wqr For 3rd Quater 2006  
 10/30/2006  Submittal Received By Department   Facility Responded To 9/21/06 Non-Compliance Letter.  
 12/21/2006  Landfill Inspection (Class 1)    
 1/29/2007  Submittal Received By Department   Semi-Annual Gw Notification  
 3/20/2007  Landfill Inspection (Class 1)    
 4/4/2007  Waste Quantity Report   1st Quarter '07  
 4/17/2007  Submittal Received By Department   4/17/07 Received Notification Of Standards Exceedance (Ammonia, Benzene, Vinyl Chloride) For Feb-Mar 2007 Sampling.  
 4/24/2007  Financial Record Review   Fa Submittal By Facility  
 5/1/2007  Financial Record Review   Financial Assurance Renewal Correction  
 5/25/2007  Submittal Received By Department   Facility Responded To Department'S 5/18/7 Non-Compliance Letter Addressing All Issues.  
 5/31/2007  Financial Assurance Documents   Facility Submitted Financial Assurance Docs.  
 6/12/2007  Groundwater Monitoring Report   6/12 Received Semi-Annual Monitoring Report (Sampled In Feb 2007). | 7/25 Reviewed The Report.  
 6/12/2007  Monitoring Data Results Reviewed   6/12 Received Electronic Data (Sampled In Feb 2007). | 7/25 Evaluated The Data Using Validator.  
 6/20/2007  Landfill Inspection (Class 1)    
 7/25/2007  Monitoring Only Plan   7/25 Sent Out Revised Mpis Dated 07-24-2007.  
 7/25/2007  Department Comments Sent   7/25 Sent Out Comment From Review Of Semi-Annual Monitoring Report (Sampled In Feb 2007). | 8/7/07 Response To Dep Comment.  
 8/14/2007  Construction/Demolition Debris Disposal Site Inspection.   Limits Of Waste Markers To Be Put In Place.  
 12/5/2007  Landfill Inspection (Class 1)    
 12/17/2007  Waste Quantity Report   2nd Quarter 2007  
 12/17/2007  Waste Quantity Report   Wqr 3rd Quarter 2007  
 1/2/2008  Waste Quantity Report   Wqr 4th Quarter 2007  
 1/2/2008  Waste Quantity Report   Wqr For 4th Quarte 2007  
 1/23/2008  Groundwater Report   In-Expansion Mws Initial Sampling Results And Well Completion Reports  
 1/24/2008  Groundwater Monitoring Report   1/24 Received Initial Monitoring Report (Sampled In Sep 2007) For Newly Installed Wells.  
 1/24/2008  Monitoring Data Results Reviewed   1/24 Received Electronic Data (Initial Sampled In Sep 2007)  
 2/7/2008  Landfill Inspection (Class 1)   Reporting Issues Related To Leachate Quantities, Precipitation Records, Maintaining Most Current Version Of Operation Plan At Site, And Installation Of Gas Monitoring Devices At Site Were Discussed. | Letter Sent Out On 03/13/2008. Response To Comme  
 2/11/2008  Department Comments Sent   2/11 Sent Out Reveiw Comment On Initial Monitoring Report Dated 1/23/08.  
 3/13/2008  Monitoring Data Results Reviewed   3/13 Received Electronic Data (Sampled Nov 2007).  
 3/13/2008  Groundwater Monitoring Report   3/13 Received Semi-Annual Report (Gw, Sw And Leachate) Sampled Nov 2007.  
 3/26/2008  Department Comments Sent   3/26/08 Sent Out Review Of Electronic Data. | 3/28/08 Received A Complete Electronic Data.  
 4/8/2008  Renewal Application Due    
 4/8/2008  Landfill Inspection (Class 1)   Routine Class I And Liner Installation For Cell 6 Was Performed On 04/08/2008 | Revised Appendix B (Specific Conditions 14, 50, And 53) Was Sent To Mr. Kaiser Via Email On 04/09/2008.  
 4/10/2008  Financial Assurance Documents   Financial Assurance Documents Approved By Tallah. On 4/10/08. | Next Cost Estimates Are Due On 3/1/09  
 4/17/2008  Waste Quantity Report   2008 1st Qtr Waste Quantity Report Including Leachate And Precipitation Data  
 6/10/2008  Submittal Received By Department   This Document Was Inserted Separately Into Occulus On 06/10/08.  
 6/10/2008  Gas Monitoring Report   This Document Was Already Inserted Into Oculus On 05/21/08.  
 6/17/2008  Submittal Received By Department   Inserted Into Oculus On April 17, 2008.  
 6/30/2008  Submittal Received By Department    
 7/14/2008  Waste Quantity Report   Inserted Into Oculus On 01/12/2008.  
 7/14/2008  Submittal Received By Department    
 7/17/2008  Waste Quantity Report   Inserted Into Oculus On 07/17/2008. Report Includes Waste Quantities, Leachate, And Precipitation Data.  
 7/25/2008  Site Inspection   1) During Inspection It Was Noted That There Are No Traffic Signs/Barriers In Place At The Working Face To Maintain Smooth Flow Of Truck Traffic At The Working Face. The Spotter Was Assisting With The Traffic Flow. In Order To Ensure Safety At The  
 7/28/2008  Submittal Received By Department   Inserted Into Oculus On 07/28/2008  
 10/10/2008  Gas Monitoring Report   3rd Qtr Gas Monitoring Performed On 09/30/2008. Gp-7, And Gp-9 Thru Gp-19 And Gp-21 Reported Exceedences. Per Jed The Exceedences Are Based On Natural Occuring Methane At The Site Per Fingerprint Analysis Results.  
 10/10/2008  Monitoring Data Results    
 10/10/2008  Groundwater Monitoring Report    
 10/21/2008  Waste Quantity Report   Inserted Into Oculus On 10/18/2008  
 10/27/2008  Department Comments    
 10/28/2008  Submittal Received By Department    
 11/5/2008  Department Comments   Letter Sent On 11/05/05 Based On The Review Of Aug 07,2008 And August 11, 2008 Landfill Gas Exceedences Reports. In Oculus On 11/05/08.  
 12/11/2008  Financial Assurance Documents   Fdep Tally Office Approved Financial Assurance For 2008, Closing Amount $6,594,943.23 And Long Term Care Amount Of $6,554,024.20.  
 1/16/2009  Site Inspection   General Comments: 1) The Random Inspection Logs Reviewed Did Not Had Time Of The Inspection. Ensure All Future Logs Are Filled Completely. This Issue Was Discussed With Site Representative. 2) Litter Was Observed During The Inspection In And  
 1/29/2009  Waste Quantity Report   2008 4th Qtr Wqr Received On 01/20/2009 Via Email. Entered Into Wacs And Oculus On 01/29/2009.  
 4/2/2009  Submittal Received By Department   1) Inserted Into Oculus On 04/02/2009. 2) Awaiting Report From The Facility  
 4/24/2009  Gas Monitoring Report   Inserted Into Oculus On 04/20/2009. Includes 2 Sampling Events One On March 18, 2009 And Second One On April 17, 2009. No Hits Reported For 04/17/2009 Sampling, Gp-12, And Gp-14 Reported >100% Lel During The March 18, 2009 Sampling Event.  
 4/29/2009  Site Inspection   1) Item 1.7: The Results Of The Review Of Groundwater Sampling And Analysis Data Is Communicated Separately By The Department To The Facility Owner. 2) The Construction Activities Associated With The Partial Closure Of The Phase I Cells Was Also  
 5/6/2009  Waste Quantity Report   Inserted Into Oculus And Wacs On 05/06/2009. Includes Leachate And Rainfall Data.  
 5/15/2009  Financial Assurance Documents   Approved By Frank Hornbrook On 05/11/09 For Cell 1-6. Closing Costs 6,759,816.81 And Ltc 6,717,874.81.  
 6/30/2009  Department Comments    
 7/1/2009  Groundwater Monitoring Report    
 7/1/2009  Monitoring Data Results    
 9/1/2009  Site Inspection   Item No. 1.7: Water Quality Report Is Reviewed As A Separate Function And Is Not Deemed Part Of This Inspection Report. Leachate Holding Ponds Are Lined And Covered. At The Time Of The Inspection, A Significant Amount Of Gas Build-Up Was Under T  
 12/21/2009  Site Inspection   Item No. 1.7: The Water Quality Report Is Reviewed As A Separate Function And Is Not Deemed Part Of This Inspection Report. Leachate Ponds: Three Of Four Leachate Ponds Are Covered. The Uncovered Pond Is Using Aeration As A Pretreatment Method  
 1/20/2010  Waste Quantity Report    
 1/28/2010  Gas Monitoring Report    
 2/24/2010  Financial Assurance Documents    
 3/2/2010  Financial Assurance Documents    
 3/30/2010  Site Inspection   Item No. 1.7: The Water Quality Report Is Reviewed As A Separate Function And Is Not Deemed Part Of This Inspection Report. Working Face: The Site Received 5" Of Rain And The Working Face Was Very Saturated. Mulch And Dirt Were Being Applied An  
 4/22/2010  Gas Monitoring Report    
 6/14/2010  Meeting    
 6/22/2010  Site Inspection   Item No. 1.7: The Water Quality Report Is Reviewed As A Separate Function And Is Not Deemed Part Of This Inspection Report. Working Face: The Working Face Was Of Proper Size And In Good Condition At The Time Of This Inspection. Whole Tires Were  
 7/21/2010  Groundwater Monitoring Report    
 7/21/2010  Department Comments    
 7/21/2010  Monitoring Data Results    
 7/21/2010  Groundwater Monitoring Report    
 7/21/2010  Monitoring Data Results    
 8/24/2010  Site Inspection   Item No. 1.7: The Water Quality Report Is Reviewed As A Separate Function And Is Not Deemed Part Of This Inspection Report. Waste Tire Processing Facility Certification: 10' Posts Are In Place To Delineate The Whole Waste Tire Storage Area. The  
 10/20/2010  Site Inspection   The Objective Of This Site Inspection Was To Verify The Construction Completion Of The Cell 7 To Receive The Class I Solid Waste, And Also The Phase I - Sequence 3a Expansion Of Gas Collection And Control System. The Cell 7 (Footprint Of 12 Acres)  
 10/22/2010  Gas Monitoring Report    
 10/26/2010  Waste Quantity Report    
 11/16/2010  Site Inspection   Item No. 1.6: The Water Quality Report Is Reviewed As A Separate Function And Is Not Deemed Part Of This Inspection Report. Working Face: The Working Face Was In Good Order At The Time Of This Inspection. Perimeter: Landfill Slopes And Other  
 1/13/2011  Waste Quantity Report    
 1/18/2011  Waste Quantity Report    
 1/21/2011  Gas Monitoring Report    
 2/23/2011  Site Inspection   Item No. 1.7: The Water Quality Report Is Reviewed As A Separate Function And Is Not Deemed Part Of This Inspection Report. Working Face: The Working Face Was In Good Order At The Time Of This Inspection. The Working Face Was In Cells 5 And 6.  
 4/21/2011  Gas Monitoring Report    
 4/21/2011  Waste Quantity Report    
 7/15/2011  Gas Monitoring Report    
 7/15/2011  Waste Quantity Report    
 8/2/2011  Site Inspection   Item No. 1.7: The Water Quality Report Is Reviewed As A Separate Function And Is Not Deemed Part Of This Inspection Report. Working Face: Disposal Was At Roughly 230 Feet Ngvd In Cells 3/4. The Working Face Was In Good Order At The Time Of This  
 10/17/2011  Waste Quantity Report    
 10/24/2011  Gas Monitoring Report    
 11/8/2011  Site Inspection   Item No. 1.7: The Water Quality Report Is Reviewed As A Separate Function And Is Not Deemed Part Of This Inspection Report. Leachate Recirculation Was Not Be Done At The Time Of This Inspection. Currently Leachate Is Being Shipped Off-Site For D  
 1/19/2012  Gas Monitoring Report    
 3/16/2012  Groundwater Monitoring Report    
 3/22/2012  Site Inspection   Item No. 1.7: The Water Quality Report Is Reviewed As A Separate Function And Is Not Deemed Part Of This Inspection Report. Working Face: The Working Face Was In Cell 7 At The Time Of This Inspection. The Working Face Was Small And In Good Orde  
 4/16/2012  Waste Quantity Report    
 4/24/2012  Groundwater Monitoring Report    
 6/5/2012  Site Inspection   Item No. 1.7: The Water Quality Report Is Reviewed Separately And Is Not Deemed Part Of This Inspection Report. Working Face: The Working Face Was In Good Order At The Time Of This Inspection. Perimeter: No Erosion Or Seeps Were Noted At Th  
 7/16/2012  Gas Monitoring Report    
 7/16/2012  Waste Quantity Report    
 10/22/2012  Gas Monitoring Report    
 12/6/2012  Site Inspection   Item No. 1.7: The Water Quality Report Is Reviewed As A Separate Function And Is Not Deemed Part Of This Inspection Report. Leachate Pond Construction: The New Leachate Containment Pond Was Under Construction At The Time Of This Inspection. Th  
 1/8/2013  Cost Estimates    
 1/15/2013  Gas Monitoring Report    
 1/15/2013  Waste Quantity Report    
 4/16/2013  Site Inspection   Permit Issue Date: July 12, 2011 Permit No.:So49-0199726-022 Expires:July 3, 2017 Item No. 1.7: The Water Quality Report Is Reviewed Separately And Is Not Deemed Part Of This Inspection Report. Working Face: Waste Disposal Was Taking Place I  
 4/22/2013  Gas Monitoring Report    
 4/22/2013  Waste Quantity Report    
 7/11/2013  Waste Quantity Report    
 8/1/2013  Gas Monitoring Report    
 9/6/2013  Site Inspection   Cell 9 Construction Inspection: Cell 9 Was Under Construction At The Time Of This Inspection. The Leachate Corridor Gravel And The Primary Geomembrane Were Being Installed At The Time Of This Inspection. Construction Completion Is Estimated To B  
 9/13/2013  Site Inspection   Operation Permit So49-0199726-022. Other Permit(S): Title V Permit #0970079-009-Av. (Air Program) The Facility Construction Permit: Sc49-0199726-017 Was Modified On 4/08/2013 - Permit Modification No.: 0199726-023-Sc-Mm Is Due To Expire On 08/16  
 10/17/2013  Waste Quantity Report    
 10/25/2013  Gas Monitoring Report    
 1/30/2014  Waste Quantity Report    
 2/10/2014  Cost Estimates    
 4/3/2014  Site Inspection   Operation Permit So49-0199726-022. Other Permit(S): Title V Permit #0970079-009-Av. (Air Program) The Facility Construction Permit: Sc49-0199726-017 Was Modified On 4/08/2013 - Permit Modification No.: 0199726-023-Sc-Mm Is Due To Expire On 08/16/2  
 4/14/2014  Waste Quantity Report    
 4/15/2014  Gas Monitoring Report    
 5/6/2014  Site Inspection   This Inspection Was Conducted For The Installation Of The Bottom Liner System For Cell 10. At The Time Of This Inspection, Multiples Layers Were Being Installed In Sequence. Comanco Was The Liner Installer And Brantly Engineering Was Performing Cqa  
 5/14/2014  Groundwater Monitoring Report    
 6/27/2014  Site Inspection   This Inspection Was Conducted For The Facilities Biannual Air Program Title V Full Compliance Evaluation (Fce). During The Air Inspection, Erosion And Exposed Waste Was Noted On The East And West Side Slopes With Intermediate Cover (See Pictures).  
 7/15/2014  Gas Monitoring Report    
 9/12/2014  Submittal Received By Department    
 9/23/2014  Groundwater Monitoring Report    
 10/7/2014  Gas Monitoring Report    
 10/17/2014  Waste Quantity Report    
 1/22/2015  Waste Quantity Report    
 4/16/2015  Groundwater Monitoring Report    
 4/16/2015  Waste Quantity Report    
 4/16/2015  Gas Monitoring Report    
 5/22/2015  Site Inspection   Item No. 1.6 Marked Unknown: The Water Quality Report Is Reviewed As A Separate Function And Is Not Deemed Part Of This Inspection Report. The Facility Has An Sopf Registration, However The Facility Was Not Accepting Yard Trash At The Time Of Ins  
 7/2/2015  Written Compliance Assitance Offer    
 7/6/2015  Gas Monitoring Report    
 8/28/2015  Waste Quantity Report    
 9/29/2015  Cost Estimates    
 10/15/2015  Site Inspection   The Department Received An Odor Complaint On 10/8/15 Regarding Odors At J.E.D. Landfill. The Complainant Has Been In Contact With Bob Walls And John Hartings Periodically Over The Last Few Months Regarding Odors. During The Site Inspection, No Odo  
 10/19/2015  Waste Quantity Report    
 1/20/2016  Waste Quantity Report    
 2/15/2016  Gas Monitoring Report    
 2/15/2016  Gas Monitoring Report    
 2/15/2016  Gas Monitoring Report    
 2/24/2016  Meeting    
 2/24/2016  Site Inspection   This Is The First Inspection Of Construction Activities At Cell 13. Mr. Rainey And Mr. Lubozynski Observed The Compacted, Sub-Base Soil In Place Within The 11.5 Acre Cell. Mr. Kaiser Stated He Expected That Installation Of The Geomembrane Liner Ove  
 3/10/2016  Groundwater Monitoring Report    
 3/10/2016  Cost Estimates    
 3/10/2016  Groundwater Monitoring Report    
 3/22/2016  Site Inspection   Item 1.6 Marked Unknown: The Water Quality Report Is Reviewed As A Separate Function And Is Not Deemed Part Of This Inspection Report. The Facility Accepts Waste Tires For Collection, And The Tires Are Sent Out About Once A Month. The Facility Is  
 4/12/2016  Site Inspection   Stephen Amirault And Allen Rainey Accompanied Mike Kaiser On The DepartmentíS Second Walk-Through Inspection Of The Cell 13 Liner Construction Approved Under Permit Modification #0199726-028-Sc-Mm. The DepartmentíS Previous Inspection Of Cell 13 Con  
 4/14/2016  Waste Quantity Report    
 4/19/2016  Gas Monitoring Report    
 5/20/2016  Site Inspection   This Is The Third Inspection Of The Construction Activities At Cell 13. Operator Dave Collins Took Mr. Rainey To Cell 13 In A Pickup Truck. Mr. Rainey Observed The Following: 1. Much Of The Protective Soil Layer Was In Place Over The Primary Ge  
 7/25/2016  Gas Monitoring Report    
 12/12/2016  Groundwater Monitoring Report    
 1/18/2017  Groundwater Monitoring Report    
 1/18/2017  Groundwater Monitoring Report    
 2/8/2017  Gas Monitoring Report    
 2/8/2017  Gas Monitoring Report    
 3/17/2017  Cost Estimates    
 3/31/2017  Groundwater Monitoring Report    
 5/22/2017  Groundwater Monitoring Report    
 5/22/2017  Gas Monitoring Report    
 7/25/2017  Groundwater Monitoring Report    
 7/25/2017  Gas Monitoring Report    
 8/18/2017  Site Inspection   Permit 0199726-033-So-1 Issues 6/13/17 And Expires 6/13/27. The Facility Is Currently Accepting Waste In Cell 13; Waste Acceptance In This Cell Began In October Of 2016.The Facility Was Actively Accepting Waste With An Acceptable Number Of Spotters/O  
 10/3/2017  Groundwater Monitoring Report    
 10/12/2017  Gas Monitoring Report    
 1/10/2018  Gas Monitoring Report    
 5/10/2018  Site Inspection   Permit 0199726-033-So-01 Issued June 13, 2017 And Expires June 13, 2027. The Facility Operates A Class I Landfill: Cells 1-4 Began Accepting Waste In January 2004; Cells 5-7 Began Accepting Waste In March 2009; Cells 8-10 Began Accepting Waste In Ma  
 3/11/2019  Site Inspection   Current Landfill Operations Are Outlined In Permit 0199726-033-So-01, Issued 6/13/17 And Expires 6/13/27. Current Construction And Modification Efforts Are Outlined In Permit 0199726-031-Sc-01, Issued 6/15/2016 And Was Modified Per Permit 0199726-03  
 4/5/2019  Electronic Communication    
 5/6/2019  Site Inspection   A Follow-Up Inspection Was Conducted At The Landfill In Response To Concerns By Private Citizens In Osceola County Regarding The Acceptance And Disposal Of Coal Combustion Residuals (Ccr) At The Landfill. Waste Connections Of Osceola County Is Autho  

Violation History

Vio# Area Regulation Opened
By
Date
Determined
Completed ETA Act Act Date Regulation Text Excerpt   (mouse over for more text)
AOC    62-701.500(2)(j), 62-701.500(8)(b), 62-701.500(8)(h)  Janwadkar_S  7/28/2008  1/23/2009    1431 7/28/2008   Maintaining and cleaning the leachate collection system., The landfill operator is responsible for the operation of the leachate collection and removal system and for maintaining the system as designed for the design period. Leachate shall be collect
AOC    62-701.500(7)(j)  Janwadkar_S  7/28/2008  1/23/2009    1431 7/28/2008   Erosion control measures shall be employed to correct any erosion which exposes waste or causes malfunction of the storm water management system. Such measures shall be implemented within three days of occurrence. If the erosion cannot be corrected w
AOC    62-701.530(3)(a)  Janwadkar_S  7/28/2008  1/23/2009    1431 7/28/2008   Gas remediation plan. If the results of monitoring show that combustible gas concentrations exceed the lower explosive limits specified in subsection (1) of this section, the owner or operator shall:
AOC    62-701.500(4), 62-701.500(13)(c)  Rush_K  4/9/2010  6/25/2010    8281 4/9/2010   Waste records., Maintain an annual estimate of the remaining life and capacity in cubic yards of the existing, constructed landfill and remaining capacity and site life of other permitted areas not yet constructed. The annual estimate shall be based
AOC    62-701.500(7)(j)  Rush_K  4/9/2010  11/16/2010    8281 4/9/2010   Erosion control measures shall be employed to correct any erosion which exposes waste or causes malfunction of the storm water management system. Such measures shall be implemented within three days of occurrence. If the erosion cannot be corrected w
AOC    62-701.530(3)(a)  Rush_K  4/9/2010  8/3/2011    8281 4/9/2010   Gas remediation plan. If the results of monitoring show that combustible gas concentrations exceed the lower explosive limits specified in subsection (1) of this section, the owner or operator shall:
AOC    62-701.500(7)(j)  Rush_K  6/29/2010  11/16/2010    9164 6/29/2010   Erosion control measures shall be employed to correct any erosion which exposes waste or causes malfunction of the storm water management system. Such measures shall be implemented within three days of occurrence. If the erosion cannot be corrected w
AOC    62-701.530(3)(a)  Rush_K  6/29/2010  8/3/2011    9164 6/29/2010   Gas remediation plan. If the results of monitoring show that combustible gas concentrations exceed the lower explosive limits specified in subsection (1) of this section, the owner or operator shall:
AOC    62-701.500(7)(j)  Rush_K  8/27/2010  11/16/2010    10089 8/27/2010   Erosion control measures shall be employed to correct any erosion which exposes waste or causes malfunction of the storm water management system. Such measures shall be implemented within three days of occurrence. If the erosion cannot be corrected w
AOC    62-701.530(3)(a)  Rush_K  8/27/2010  5/3/2013    10089 8/27/2010   Gas remediation plan. If the results of monitoring show that combustible gas concentrations exceed the lower explosive limits specified in subsection (1) of this section, the owner or operator shall:
AOC    62-701.530(3)(a)  Rush_K  11/17/2010  8/3/2011    11258 11/17/2010   Gas remediation plan. If the results of monitoring show that combustible gas concentrations exceed the lower explosive limits specified in subsection (1) of this section, the owner or operator shall:
AOC    62-701.500(7)(j)  Rush_K  8/3/2011  11/16/2011    152332 8/3/2011   Erosion control measures shall be employed to correct any erosion which exposes waste or causes malfunction of the storm water management system. Such measures shall be implemented within three days of occurrence. If the erosion cannot be corrected w
AOC    62-701.500(7)(j)  Rush_K  11/16/2011  4/9/2012    153706 11/16/2011   Erosion control measures shall be employed to correct any erosion which exposes waste or causes malfunction of the storm water management system. Such measures shall be implemented within three days of occurrence. If the erosion cannot be corrected w
AOC    62-701.500(7)(j)  Rush_K  4/9/2012  6/6/2012    155671 4/9/2012   Erosion control measures shall be employed to correct any erosion which exposes waste or causes malfunction of the storm water management system. Such measures shall be implemented within three days of occurrence. If the erosion cannot be corrected w
AOC    62-701.500(7)(j)  Depradine_G  10/8/2013  4/23/2014    161679 10/8/2013   Erosion control measures shall be employed to correct any erosion which exposes waste or causes malfunction of the storm water management system. Such measures shall be implemented within three days of occurrence. If the erosion cannot be corrected w
AOC    62-701.500(7)(j)  Rush_K  7/3/2014  6/30/2015    164641 7/3/2014   Erosion control measures shall be employed to correct any erosion which exposes waste or causes malfunction of the storm water management system. Such measures shall be implemented within three days of occurrence. If the erosion cannot be corrected w
   62-701.500(7)(j)  Wright_Kj  6/30/2015  7/7/2015    167610 6/30/2015   Erosion control measures shall be employed to correct any erosion which exposes waste or causes malfunction of the storm water management system. Such measures shall be implemented within three days of occurrence. If the erosion cannot be corrected w
   62-701.500(7)(e)  Gowan_B  4/5/2019  5/13/2019    178840 4/5/2019   Initial cover shall be applied and maintained at landfills in order to minimize any adverse environmental, safety, or health effects such as those resulting from birds, unauthorized wastes, blowing litter, odors, vectors, or fires. The minimum freque