Activity History for:

FACID: 87081, VISTA LANDFILL, LLC (BUTTREY/KEENE RD SOUTH)

Note: ETA links to Enforcement Tracking Activity

Date Done Activity Type Activity Comments   (mouse over for more text) ETA Link
 3/18/2009  Site Inspection   Leachate Storage Tank The Facility Has Sent Approximately 50,000 Gallons Of Leachate For Disposal Via Tanker Trucks. The Facility Is In The Process Of Installing The Necessary Equipment To Connect To The City Sewer. The Flange For The Piping That  
 6/26/2009  Site Inspection   The Facility Is In Good Order. The Size Of The Working Face Is Appropriate. The Leachate Line That Connects The Leachate Storage Tank To The Sewer Line Has Been Installed And Is Operational.  
 9/24/2009  Site Inspection   Item No. 1.7 Water Quality Report Is Reviewed As A Separate Function And Is Not Deemed Part Of This Inspection Report. Began Accepting Waste Nov 2008. Wtpf Not Operational As Of The Time Of This Inspection.  
 10/23/2009  Waste Quantity Report    
 12/15/2009  Site Inspection   Item No. 1.7: The Water Quality Report Is Reviewed As A Separate Function And Is Not Deemed Part Of This Inspection Report. Residential Well: The Residential Drinking Well Located Approximately 320 Feet From The Edge Of Cell 4 Is In The Process  
 12/17/2009  Gas Monitoring Report    
 1/12/2010  Site Inspection   This Visit Was The Final Walkthrough Inspection For The Certification Of Construction Completion For Cell 2 Liner System. The Permittee, Engineer Of Record, And The City Of Apopka Representative Were Also Present During The Visit. The Cell 2 Liner  
 2/5/2010  Waste Quantity Report    
 2/16/2010  Site Inspection   Item No. 1.7: The Water Quality Report Is Reviewed As A Separate Function And Is Not Deemed Part Of This Inspection Report. Working Face: The Current Working Face Is In Cell 2 And Was In Good Order At The Time Of This Inspection. No Unacceptabl  
 3/18/2010  Gas Monitoring Report    
 3/29/2010  Submittal Received By Department    
 5/4/2010  Site Inspection   Item No. 1.7: The Water Quality Report Is Reviewed As A Separate Function And Is Not Deemed Part Of This Inspection Report. Working Face: The Working Face Was In Good Order At The Time Of This Inspection. Perimeter: No Blown Litter Was Not  
 6/9/2010  Gas Monitoring Report    
 7/22/2010  Site Inspection   Item No. 1.7: The Water Quailty Report Is Reviewed As A Separate Function And Is Not Deemed Part Of This Inspection Report. Working Face: The Working Face At The Time Of This Inspection Was In Good Order But Larger Than Usual. Site Representati  
 7/23/2010  Submittal Received By Department    
 8/31/2010  Gas Monitoring Report    
 10/21/2010  Site Inspection   Intem No. 1.7: The Water Quality Report Is Viewed As A Separate Function And Is Not Deemed Part Of This Inspection Report. Working Face: The Working Face Was In Good Order At The Time Of This Inspection. The Size Of The Working Face Was Larger  
 10/22/2010  Waste Quantity Report    
 12/1/2010  Gas Monitoring Report    
 1/18/2011  Waste Quantity Report    
 4/8/2011  Gas Monitoring Report    
 4/19/2011  Submittal Received By Department    
 5/25/2011  Site Inspection   Renewal Class Iii Permit Application Received On 2/17/11 - The Application (Permit # 48-0165969-018) Is Under Review. Debbie Perez Is Now The New Interim Manager. Item# 1.7 The Water Quality Report Is Reviewed As A Separate Function And Is Not D  
 5/27/2011  Gas Monitoring Report    
 6/30/2011  Financial Assurance Documents    
 10/11/2011  Site Inspection   The Compost Facility Is Now In Operation. Pre-Consumer Vegetative Waste Is Processed With Yard Waste (Mulch) For The Production Of Compost.  
 12/29/2011  Groundwater Monitoring Report    
 12/29/2011  Submittal Received By Department    
 12/29/2011  Submittal Received By Department    
 1/4/2012  Gas Monitoring Report    
 1/11/2012  Waste Quantity Report    
 1/24/2012  Site Inspection   Class Iii Permit Issue Date: 11/09/11 Permit No. So48-0165969-018 Waste Tire Permit Expiration Date:9/16/2014 Permit No. Wt48-0165969-016 Materials Recovery Facility Expiration Date: 05/05/2015 Permit No. So48-0165969-017 At The Time Of The I  
 2/22/2012  Gas Monitoring Report    
 3/22/2012  Cost Estimates    
 5/2/2012  Site Inspection   Class Iii Permit Issue Date: 11/09/11 Permit No. So48-0165969-018 Waste Tire Permit Expiration Date:9/16/2014 Permit No. Wt48-0165969-016 Materials Recovery Facility Expiration Date: 05/05/2015 Permit No. So48-0165969-017 At The Time Of The I  
 5/4/2012  Gas Monitoring Report    
 8/2/2012  Site Inspection   Class Iii Permit Issue Date: 11/09/11 Permit No. So48-0165969-018 Waste Tire Permit Expiration Date:9/16/2014 Permit No. Wt48-0165969-016 Materials Recovery Facility Expiration Date: 05/05/2015 Permit No. So48-0165969-017 At The Time Of The I  
 9/5/2012  Gas Monitoring Report    
 9/24/2012  Site Inspection   Cell 3 Construction 9/24/12: Cell 3 Liner Installation Activities Were Observed. Approximately 3/4 Of The Geomembrane Was Installed At The Time Of This Inspection On 9/24/12. The Sump Area Was Being Prepped For Installation. Cqa Activities Were B  
 10/16/2012  Site Inspection   Class Iii Permit Issue Date: 11/09/11 Permit No. So48-0165969-018 Waste Tire Permit Expiration Date:9/16/2014 Permit No. Wt48-0165969-016 Materials Recovery Facility Expiration Date: 05/05/2015 Permit No. So48-0165969-017 At The Time Of The I  
 11/30/2012  Site Inspection   Cell 3 Construction Certification: The Certification Of Construction Completion Report For Cell 3 Was Received On November 19, 2012. This Inspection Reviewed The Construction Completion For Cell 3. Previous Inspections On September 24 And 27 Were  
 12/18/2012  Gas Monitoring Report    
 1/8/2013  Waste Quantity Report    
 2/19/2013  Site Inspection   Class Iii Permit Issue Date: 11/09/11 Permit No. So48-0165969-018 Waste Tire Permit Expiration Date:9/16/2014 Permit No. Wt48-0165969-016 Materials Recovery Facility Expiration Date: 05/05/2015 Permit No. So48-0165969-017 At The Time Of The I  
 3/22/2013  Gas Monitoring Report    
 4/4/2013  Submittal Received By Department    
 4/25/2013  Waste Quantity Report    
 4/26/2013  Site Inspection   On 4/26/13 A Construction Certification Inspection Was Conducted For The Installation Of The Next Phase Of The Landfill Gas Collection System (Lgcs). This Phase Consisted Of The Installation Of 5 New Gas Wells, A Condensate Sump, And An Expansion Of  
 5/6/2013  Submittal Received By Department   Mr. Lubozynski / Mr. Davoll, Please Consider This An Official Notification Of The Damage That Has Occurred At The Vista Landfill Due To The Recent Inclement Weather. The Facility Received 3.67 Of Rain In The Last Two Days, Which Has Cause The Int  
 6/3/2013  Gas Monitoring Report    
 6/26/2013  Site Inspection   Mr. Rainey Arrived At The Facility At 10:10 Am To Witness Groundwater Sampling For The 3rd Quarter Groundwater Sampling Event. Quarterly Sampling Is Required By The Facility'S Monitoring Plan Implementation Schedule (Mpis) That Was Last Updated 2/4/  
 7/11/2013  Waste Quantity Report    
 7/12/2013  Groundwater Monitoring Report    
 7/25/2013  Site Inspection   This Site Visit Was Conducted To Inspect The Construction Of The Next Phase Of The Active Gas Collection System. Due To An Increase In Odors Emitting From The Cell 3 Disposal Area, The Timing Of The Installation Of The Next Gas Collection Constructi  
 8/1/2013  Gas Monitoring Report    
 10/14/2013  Waste Quantity Report    
 11/7/2013  Gas Monitoring Report    
 11/19/2013  Site Inspection   Permit #So48-0165969-022 (Modification Of So48-0165969-018); Expiration Date: 4/19/2016. Item 1:6 - The Water Quality Report Is Reviewed As A Separate Function And Is Not Deemed A Part Of This Inspection. Compost Facility The Facility Consists O  
 1/16/2014  Waste Quantity Report    
 2/7/2014  Gas Monitoring Report    
 3/21/2014  Submittal Received By Department    
 4/3/2014  Groundwater Monitoring Report    
 4/3/2014  Cost Estimates    
 4/3/2014  Groundwater Monitoring Report    
 4/16/2014  Waste Quantity Report    
 4/25/2014  Site Inspection   Item 1:6 - The Groundwater Report Is Reviewed As A Separate Function, And Is Not Deemed Part Of This Inspection Report. Waste Tire Processing: Tires Are Stored In Containers. The Facility Was Disposing Of Waste In Cell 3 During The Inspection.  
 4/28/2014  Submittal Received By Department    
 5/15/2014  Gas Monitoring Report    
 7/21/2014  Waste Quantity Report    
 8/29/2014  Site Inspection   Item 1:6 - The Groundwater Report Is Reviewed As A Separate Function, And Is Not Deemed Part Of This Inspection Report. Leachate From Class Iii Landfill Is Trucked To The Apopka Wwtf.  
 10/1/2014  Groundwater Monitoring Report    
 10/1/2014  Gas Monitoring Report    
 10/28/2014  Gas Monitoring Report    
 1/8/2015  Letter    
 1/8/2015  Submittal Received By Department    
 1/23/2015  Letter    
 1/23/2015  Gas Monitoring Report    
 4/20/2015  Gas Monitoring Report    
 4/20/2015  Submittal Received By Department    
 4/22/2015  Site Inspection   This Site Visit Was Conducted To Inspect The Construction Of The Landfill Gas Collection System Expansion In Cell 3 Disposal Area. This Construction Event Started On April 20, 2015 And Completed On April 27, 2015. The Construction Activities Were I  
 5/12/2015  Groundwater Monitoring Report    
 5/20/2015  Site Inspection   Wacs No. 87081 Permit No. 0165969-023-Wt-016 No Shredding Of Tires Is Conducted Onsite. All Tires Are Removed From The Site. Tires Are Stored In Containers Outside.  
 5/20/2015  Site Inspection   Section 1 - File Review Item 1.6 - Unknown - The Ground Water Report Is Reviewed As A Separate Function And Is Not Deemed Part Of This Inspection. Danny Galarza - Operator Leslie Holmes And Eric Proctor - Spotters Currently Placing Waste In C  
 6/4/2015  Submittal Received By Department    
 6/9/2015  Letter    
 7/6/2015  Waste Quantity Report    
 7/22/2015  Gas Monitoring Report    
 7/30/2015  Submittal Received By Department    
 8/4/2015  Site Inspection   On July 10, 2015, Seth Nunes, P.E. Of Carlson Environmental Consultants, Pc Submitted "Vista Landfill - Cell 4 Certificate Of Construction Completion. Cell 4 Has A Total Area Of 7.5 Acres And Tied Into The Adjacent Cell 3 That Is Located To The West  
 8/21/2015  Submittal Received By Department    
 10/16/2015  Gas Monitoring Report    
 12/31/2015  Submittal Received By Department    
 12/31/2015  Submittal Received By Department    
 1/20/2016  Waste Quantity Report    
 1/26/2016  Gas Monitoring Report    
 3/18/2016  Submittal Received By Department    
 4/8/2016  Waste Quantity Report    
 6/1/2016  Site Inspection   The Waste Tires Were Properly Stored In 7 Roll Off Containers. There Was Adequate Space For Additional Tires That Would Still Be Less Than The Permitted Capacity.  
 6/1/2016  Site Inspection   Section 1.0 - File Review Item No. 1.6 - Unknown - The Ground Water Report Is Reviewed As A Separate Function And Is Not Deemed Part Of This Inspection Daniel Galarza - Operator Leslie Holmes And Michael Johnson - Spotters Currently Placing W  
 6/21/2016  Letter    
 6/28/2016  Submittal Received By Department    
 7/8/2016  Gas Monitoring Report    
 7/11/2016  Waste Quantity Report    
 7/26/2016  Gas Monitoring Report    
 9/13/2016  Waste Quantity Report    
 12/8/2016  Site Inspection   Class Iii Landfill Permit 0165969-029-So-Mm Was Issued 7/7/2016 And Expires 6/1/2036. Waste Tire Processing Facility Permit 0165969-023-Wt-06 Was Issued 8/12/2014 And Expires 9/16/2019. Section 1.0-File Review Item 1.2 - Annual Waste Report Was Rec  
 1/9/2017  Letter    
 1/18/2017  Waste Quantity Report    
 1/24/2017  Submittal Received By Department    
 1/24/2017  Gas Monitoring Report    
 3/9/2017  Cost Estimates    
 3/31/2017  Submittal Received By Department    
 9/18/2017  Site Inspection   On September 18, 2017, Stephen Amirault And Morgan Hampton Of Fdep, Accompanied By Sheree Grant, Of Waste Management, Inc. (Wmi), Conducted An Inspection To Confirm The Construction Completion Of Cell 5 At The Vista Class Iii Landfill (Wacs # 87081),  
 12/7/2017  Site Inspection   Class Iii Landfill Permit 0165969-030-So Was Issued 11/2/2017 And Expires 6/1/2036. Waste Tire Processing Facility Permit 0165969-023-Wt-06 Was Issued 8/12/2014 And Expires 9/16/2019. Section 1.0-File Review Item 1.2 - 2016 Annual Waste Report Was R  
 1/12/2018  Letter    
 7/23/2018  Site Inspection   On July 23, 2018, Stephen Amirault And Katie Wright Of Fdep, Accompanied By Sheree Grant, And Deb Perez Of Waste Management, Inc. (Wmi), Conducted An Inspection To Confirm The Construction Completion Of Landfill Gas System Expansion At The Vista Clas  
 4/30/2019  Site Inspection   Class Iii Landfill Permit 0165969-030-So Was Issued 11/2/2017 And Expires 6/1/2036. Waste Tire Processing Facility Permit 0165969-023-Wt-06 Was Issued 8/12/2014 And Expires 9/16/2019. Section 1.0-File Review Item 1.2 - 2017 Annual Waste Report Was  
 5/23/2019  Letter    

Violation History

Vio# Area Regulation Opened
By
Date
Determined
Completed ETA Act Act Date Regulation Text Excerpt   (mouse over for more text)
AOC    62-701.300(2)(b)  Rush_K  9/28/2009  12/22/2009    4000000000053 9/28/2009   Within 500 feet of an existing or approved potable water well unless storage or disposal takes place at a facility for which a complete permit application was filed or which was originally permitted before the potable water well was in existence. Thi
AOC    62-701.500(7)(i), 62-701.500(11)(f)  Rush_K  2/17/2010  5/11/2010    7716 2/17/2010   A litter policing operation shall be employed to keep litter from leaving the working area of the landfill. Litter outside the working area shall be picked up within 24 hours. Some litter may be exposed through the initial cover if it is in traffic a