FL DEP Banner
Activity and Violation History

Florida Department of Environmental Protection

Solid Waste Facility Compliance History



Activity History for:

FACID: 70963, LIBERTY TIRE RECYCLING, LLC

Note: ETA links to Enforcement Tracking Activity

Date Done Activity Type Activity Comments   (mouse over for more text) ETA Link
 2/2/1990  Waste Tire Site Inspection.    
 4/10/1992  Waste Tire Site Inspection.   Waste Tire Site Inspection  
 6/11/1992  Case Referred To Ogc   Injunction Filed In Circuit Court In Slc | Stipulation And Consent For Injunction Entered 01-14-94  
 1/8/1993  Waste Tire Site Inspection.   Waste Tire Site Inspection  
 1/8/1993  Waste Tire Site Inspection.   Waste Tire Site Inspection  
 7/15/1993  Waste Tire Site Inspection.   Waste Tire Site Inspection, Client Attorney Privelged  
 7/28/1993  Waste Tire Site Inspection.   Waste Tire Site Inpsection, Client Attorney Privelged  
 10/15/1993  Waste Tire Site Inspection.   Waste Tire Site Inspection, Client Attorney Priveleged  
 11/2/1993  Waste Tire Site Inspection.   Waste Tire Site Insepction, Client Attorney Priveleged  
 12/13/1993  Civil Penalty Authorization Memo   Submitted To Larry Morgan. Pending Secretary Approval.  
 1/14/1994  Permit Condition Or Consent Order/Response Due   Lower Height Of Shred Piles To 15' Or Less Then Clear Fire Lanes Fl-5, Fl-6, Fl-7  
 1/14/1994  Permit Condition Or Consent Order/Response Due   Design And Construct 24' Roadway Around Perimeter Of Site & Central Access Road East-West. Bearing Ratio Of 40 By Independent Lab & Certified By P>E> | Submitted Design For Roadway On South Of East West Central Roadway. Noncompliance  
 1/14/1994  Permit Condition Or Consent Order/Response Due   Within 30 Days Apply For A Mssw Permit For The 8 And 24 Acre Parcels | Applied On 09-Feb-94, However The Check Was For A Gp Instead Of An Individual Permit. Balance Of Money Received On 15-Feb-94  
 1/14/1994  Permit Condition Or Consent Order/Response Due   Prepare A Fire Plan Acceptable To The St. Lucie Ft. Pierce Fd | Slcfpcd Refuses To Respond To The Adequacy Of The Fire Plan.  
 1/14/1994  Permit Condition Or Consent Order/Response Due   Remove Whole Tires And Shreds From Fpl Easement  
 1/14/1994  Permit Condition Or Consent Order/Response Due   Within 15 Days Of Receipt Of All Permits Ftr Shall Proceed To Completion Within 90 Days A Site Fire Protection Systems Installed, A Method To Integrate Slcfp Motorized Fire Pumps Into Water Delivery System. System Must Be Designed, Developed And Imp  
 1/14/1994  Permit Condition Or Consent Order/Response Due   Monthly Reports Within 10 Days Of The End Of Each Month Shall Be Provided Showing The Progess With The Order On The Volume And Weight Of Tires Onsite And Offsite, Description Of Removal/Reconfiguration, Fire Fighting Resources And Financial Responsib  
 1/14/1994  Permit Condition Or Consent Order/Response Due   Submit Record Drawings By P.E. Of Portions Of Roadway System Existing On Date Of Order That Are Built To Spec'S & What Portions Of Road To Be Constructed To Meet Spec'S. | Record Drawings Submitted As Part Of Mssw Application To Greg Coffelt Ofdep  
 1/14/1994  Permit Condition Or Consent Order/Response Due   Provide 2 Motor Vehicles That Carry 700 Gallons Of Water At 300 Gpm With Afff. At Least 60 Gallons Of Foam Product Or A Chemical Extinguishing Agent Must Be On Board One Of The Vehicles, Provide 2- 1 1/2" Hoseat 150' Long And 250' Of 1" On Reel, Sel  
 1/14/1994  Permit Condition Or Consent Order/Response Due   Ftr Shall Remove And Dispose Of All Waste Tires For Which Storage Is Not Authorized By A Dep Permit  
 1/14/1994  Permit Condition Or Consent Order/Response Due   Pre-Application Meeting For Mssw Permit | A Pre-Application Meeting Held With Greg Coffelt-Dep And Joe Friscia Of Ftr  
 1/14/1994  Permit Condition Or Consent Order/Response Due   Compile A Resource List Of At Least 5 Front End Loaders, 5- "10 Wheel Dump Trucks", 5 Bulldozers Within 4 Hours Of Notification To Supplier | List Supplied Doesn'T State If Contractors Can Provide Equipment In 4 Hours  
 1/14/1994  Permit Condition Or Consent Order/Response Due   Clear Tires And Shreds From A 50' Perimeter Around The Site To Allow Required Equipment Access For Installation Of Perimeter Roadway  
 1/14/1994  Permit Condition Or Consent Order/Response Due   After Jul 14, Ftr Shall Deposit $4,000 Per Month Or 5% Of The Monthly Tipping Fee Revenues Generated At The Psl Site Into The Trust Fund Until Either All Whole And Processed Tires Are Removed From The Site Or Ftr Meets The Financial Responsibility Re  
 1/14/1994  Permit Condition Or Consent Order/Response Due   Ftr Shall Submit A Wtpf Application, Or Variance, Or Alternative Procedure Or A Plan For Removing All Whole And Processed Tires  
 1/14/1994  Permit Condition Or Consent Order/Response Due   Designate Waste Tire Storage Area As "None Smoking Area", Spark Arrestors On All Internal Combustion Equipment | Signs Posted At Entrance Road  
 1/14/1994  Permit Condition Or Consent Order/Response Due   Apply For Water Resource Permit Under Chapter 17-312 If Any Road Construction Or Waste Tires Are In Jurisdictional Wetlands | Applied For Permit To Psl Office - Jackie Kelly Is Processor.  
 1/14/1994  Permit Condition Or Consent Order/Response Due   Clear Fire Lanes 1 And 2 And Remove T-12 And T-14 And 3 As Shown On Exhibit A Of Order  
 1/14/1994  Permit Condition Or Consent Order/Response Due   Clear Fire Lane 4  
 1/14/1994  Permit Condition Or Consent Order/Response Due   Within 180 Days, Reconfigure Whole And Shredded Waste Tires Into A Series Of Piles <50' Wide, 15' High And 10,000 Square Feet With 50' Fire Lanes  
 1/14/1994  Permit Condition Or Consent Order/Response Due   Create Financial Trust Fund And Deposit $50,000 Cash Or Surety, Extend The Letter Of Credit Of $15,000 Beyond 1994 | Forwarded To Tlh To Francis Keith Via Janet Bowman  
 1/14/1994  Permit Condition Or Consent Order/Response Due   Remove And Reconfigure All Whole Tires And Shreds With Fire Lanes Onsite  
 1/14/1994  Permit Condition Or Consent Order/Response Due   Training Program Of Fire Equipment, Motor Vehicles, Fire Pumps, Hose Lines And Other Equipment | Training Provided By Indian River Community College Fire District Instructors  
 1/14/1994  Permit Condition Or Consent Order/Response Due   Provide A Class D Security Guards At Site, Provide Control Gate At Southern Access Road, Provide Perimeter Lighting Along Range Line Road At 5 Foot Candles And Provide An Enclosed Operations Area For Security Guards With Fixed And Portable Phones | S  
 2/28/1994  Non-Compliance Letter Issued   Letter Hand Delivered To Ftr On Violation Of Sa | Response From Ftr Is Inadequate And Another Letter Will Be Sent  
 2/28/1994  Waste Tire Site Inspection.   Site In Non Compliance With Settlement Agreement  
 3/16/1994  Non-Compliance Letter Issued   Noncompliance With 10a, 10b, 10c7, 10d1, 10e  
 3/23/1994  Waste Tire Site Inspection.   Reinspected Site Again, Non-Compliance With Items 10c5, 10c8, 10d1, 10d2  
 4/4/1994  Non-Compliance Letter Issued   Lack Of Fire Plan Approved By Slcfpfcd 10c8, Lack Of Clear Zones In Ne And South Borders 10d1, Fl2 & 3 Not To Grade, Shreds In Roadway  
 4/8/1994  Waste Tire Site Inspection.   Received Items In 10c5, Fl 1 & 4 Complete  
 4/29/1994  Waste Tire Site Inspection.    
 6/6/1994  Waste Tire Processing Facility Inspection.   Noncompliance With Items 10c2b, 10c8 10d1, 10d2  
 8/4/1994  Waste Tire Site Inspection.   Noncompliance With Items 10b, 10c2b, 10c8, 10d1, 10d2, 10d5, 10d6  
 9/26/1994  Waste Tire Site Inspection.   Non-Compliance For Lack Of Fire Lanes 2, 3, 4, 5, 6, 7. Less Than 50 Feet Between All But One Tire Shred Pile, Height Of S-4 And S-8 Greater Than 25 Feet, Shred Piles S-4 And S-8 Along With A Couple Of Feet Of Tire Shreds Are In The Fpl Easement. T  
 5/12/1995  Waste Tire Site Inspection.   Quarterly Inspection  
 9/1/1995  Permit Condition Or Consent Order/Response Due   Removal Of > 1000 Tons Of Waste Tires Each Month For Sept, Oct And Nov 95 More Than Received  
 9/13/1995  Permit Condition Or Consent Order/Response Due   $3000 Penalty Is Due  
 9/13/1995  Permit Condition Or Consent Order/Response Due   $3,000 Civil Penalty Due  
 9/13/1995  Permit Condition Or Consent Order/Response Due   Mssw Ceritified Complete- Extended Till 31-Jul-99  
 9/13/1995  Permit Condition Or Consent Order/Response Due   Dep Notify In Writing Ftr Of Compliance With Cfj For 9-95 Through 11-95  
 9/13/1995  Permit Condition Or Consent Order/Response Due   $3000 Penalty Is Due | Check Number 105675  
 9/13/1995  Permit Condition Or Consent Order/Response Due   $3000 Penalty Is Due | Check Number 104642  
 9/13/1995  Permit Condition Or Consent Order/Response Due   $3000 Penalty Is Due | Recieved Payment On 10-Mar-98  
 9/13/1995  Permit Condition Or Consent Order/Response Due   $3000 Civil Penalty  
 9/13/1995  Permit Condition Or Consent Order/Response Due   $3000 Penalty Is Due | Check Number 106229 Received  
 9/13/1995  Permit Condition Or Consent Order/Response Due   Remove All Waste Tires For Which Stroage Is Not Authorized By A Permit | Ftr Has Not Complied. Compliance Is Slow, 17703 Tons Remain. Ddm - Mr. Deaguilar Advised. Ddm Allowed Ftr To Proceed As Long As Progress Is Being Made.  
 9/13/1995  Permit Condition Or Consent Order/Response Due   If Ftr Doesn'T Remove At Least 80% Of Base Removal Amount Of Tires From Sep 95-Nov 95, Then Ftr Submit Plan To Dep Remove All Tires From Site By Dec 31, 1995  
 9/13/1995  Consent Order Executed   Consent Final Judgement Executed  
 9/13/1995  Permit Condition Or Consent Order/Response Due   $3000 Penalty Is Due | Ck Number 107648  
 9/13/1995  Permit Condition Or Consent Order/Response Due   $3000 Penalty Is Due | Paid And Received 14-Mar-97  
 9/13/1995  Permit Condition Or Consent Order/Response Due   $3000 Penalty Is Due  
 9/13/1995  Permit Condition Or Consent Order/Response Due   $3000 Penalty Is Due | Ck. 106589  
 9/13/1995  Permit Condition Or Consent Order/Response Due   Civil Penalty Totals $65,740.21, To Be Paid In 20 Quarterly Installments. First Installment Is $5,740.21 Then $3,000.00 Each  
 9/13/1995  Permit Condition Or Consent Order/Response Due   $3000 Penalty Is Due  
 9/13/1995  Permit Condition Or Consent Order/Response Due   $3000 Penalty Is Due | Payment Received 11-Dec-97, Check Number 102526  
 9/13/1995  Permit Condition Or Consent Order/Response Due   $3000 Penalty Is Due  
 9/13/1995  Permit Condition Or Consent Order/Response Due   $3000 Penalty Is Due  
 9/13/1995  Permit Condition Or Consent Order/Response Due   $3000 Penalty Is Due | Penalty Received  
 9/13/1995  Permit Condition Or Consent Order/Response Due   $3000 Penalty Is Due  
 9/14/1995  Judicial Consent Decree   93-895-Ca  
 10/12/1995  Waste Tire Site Inspection.   Quarterly Inspection  
 12/1/1995  Permit Condition Or Consent Order/Response Due   Remove > 1500 Tons Of Waste Tires Each Calendar Month More Than Received For Dec 95, Jan 96-July 96. | Ftr Didn'T Meet This As Of July 1, 1996. Ddm - Mr. Deaguilar Advised. Ddm Approved To Continue As Long As Some Progress Is Being Made To Complian  
 12/6/1995  Waste Tire Site Inspection.   Quartelry Inspection With Conditions Of Cfj  
 2/6/1996  Waste Tire Site Inspection.   Consent Final Judgement For Facility. Lurix Inspected, Bringing Facility Into Compliance Per Cfj.  
 2/16/1996  Letter   Lurix - Referenced Inspection Compliance/Non-Compliance Items From 2-5-96 Inspection  
 3/18/1996  Waste Tire Processing Facility Inspection.   Lurix Inspected Pursuant To Consent Final Judgement  
 6/12/1996  Waste Tire Site Inspection.   Lurix Inspection Per Court Order. Mssw System Under Construction, Ftr Hasn'T Met Waste Tire Reduction Goals For Feb, March, Apr 1996.  
 6/13/1996  Letter   Lurix To Ftr On 11-Jun-96 Inspection  
 8/9/1996  Waste Tire Processing Facility Report Due   Second Quarterly Report Received, 17,703 Tons Stockpiled Onsite  
 8/9/1996  Waste Tire Processing Facility Report Due   First Quarterly Report Report, 18,469 Tons Stockpiled Onsite  
 9/4/1996  Letter   Lurix Faxed Letter To Ftr- Failed To Submit $3,000.00 Penalty Again By Due Date Being 01-Sep-96, Failure To Submit Monthly Operating Report On Time For July 1996, Failure To Submit Weekly Tallies On Time For The Month Of Aug. 1996 Of Tires Received A  
 9/4/1996  Telephone Conversation   Lurix Called Quaterson Of Ftr And Sent Fax That Penalty Of $3,000.00 Was Due On 01-Sep-96 And Late Again, Weekly Tallies Not Received For Month Of Aug 96, Monthly Report For July 96 Not Received.  
 9/11/1996  Waste Tire Site Inspection.   Lurix Inspected - Lack Of Fire Lanes, Tires Shreds Still In Fpl Easement, Tire Piles Exceed Dimensions, Lack Of Mssw Which Was Due By 01-Mar-96, Greater Than 9700 Tons Of Waste Tires Onsite (18,700), Failure To Submit Weekly Tallies, Informed Supervi  
 9/26/1996  Telephone Conversation   Lurix Called Quarterson Again Of Ftr And Said That The Weekly Tallies For The Month Of Sept 96 That Were Due At The End Of Each Week Are Late Again. They Are On Hisw Desk Per His Secretary And She'Ll Tell Him Again.  
 12/6/1996  Permit Condition Or Consent Order/Response Due   $3,000 Penalty Received  
 12/17/1996  Waste Tire Site Inspection.   Helicopter Inspection By Lurix | Met With Ftr And Discussed Extensions Of Cfj Till 31-Jul-97  
 12/24/1996  Draft Consent Order Sent To Ogc   Memo To Ogc To Extend Date Of Cfj For Mssw Completion From 01-Mar-96 To 31-Jul-97  
 1/6/1997  Waste Tire Processing Facility Inspection.   Inspection By Lurix Per Court Order, Still Too Many Tires Onsite, Lack Of Fire Lanes, Contracts Established With Berman Road Landfill To Use 15,000 Cubic Yards Of Tdf In Leachate Collection System. Delivery Started On 12-26-96 And Is To Be Completed  
 3/5/1997  Telephone Conversation   Spoke With Dave Quarterson, I Told Him That They Were Late On Penalty Payment Due 01-Mar-97 For $3,000.00. He Said That They Are Strapped For Cash And Will Receive Large Check By 10th Of Month. He Will Sned A Letter And Make Payment By 15th Of Marh  
 3/31/1997  Financial Assurance Documents   $326,917.00  
 3/31/1997  Draft Consent Order Sent To Ogc   Ftr Can Provide Financial Assurance In Amount Of $326,917.00 Per Cce. Estimate Accepted And Sent To Sw/Tlh And Ogc. Recommended To Ogc To Delete Item 10f Of Cfj If Ftr Can Provide Proof Of Financial Assurance.  
 4/16/1997  Waste Quantity Report   Received First Quarterly Reprot  
 5/27/1997  Telephone Conversation   Called And Faxed Note To Ftr That Next Penalty Of $3000.00 Is Due On Or Before 01-Jun-97  
 8/10/1997  Waste Quantity Report   Received Second Quarterly Wtpf Report Via Fascimile  
 8/14/1997  Waste Tire Site Inspection.   Inspection To Be Performed On 14-Aug-97. Lack Of Fire Lanes Around Piles. Mssw Almost Copmpleted, Financial Assurance Established, Bldg For Indoor Processing Completed.  
 8/14/1997  Permit Condition Or Consent Order/Response Due   Provided Financial Assurance For 20,000 Tons Of Waste Tires In Leiu Of Having 9,700 Waste Tires Onsite  
 9/5/1997  Letter   Letter Received From Ftri To Extend Mssw Completion Date Till 9-98. Forwarded To Erp - Inger Hansen For Review.  
 9/19/1997  Enforcement Project Initiated   See Enforcement 195114  
 9/19/1997  Waste Tire Processing Facility Inspection.   Lack Of Fire Lanes In North East In Tire Shreds And Along South Side Of Entrance Road West Of New Processing Building.  
 9/19/1997  Waste Tire Processing Facility Inspection.   Truck Tire Pile Larger Than Dimensions Of Rule West Of New Building  
 10/10/1997  Waste Tire Processing Facility Report Due   Third Quarterly Report Received  
 12/4/1997  Waste Tire Processing Facility Inspection.   Inspection By Lurix, Mssw Not Completed, Tire Pile Along South Side Of Entrance Road Is Larger Than Rule Dimensions, 50 Foot Buffer Around Fpl And South Side Of Pond Is Not Completed.  
 12/4/1997  Follow Up Inspection   Truck Pile Too Large West Of Building  
 1/27/1998  Waste Tire Processing Facility Report Due   Received Annual Report 10-97 Till 12-31-98, 18,720 Tons Left  
 3/28/1998  Follow Up Inspection   Truck Pile Too Large West Of New Building. New Truck Tire Equipment Onsite And Operating. @ 60 Days Before Pile Is In Compliance  
 3/28/1998  Waste Tire Processing Facility Inspection.    
 6/1/1998  Renewal Application Due   Permit Issued  
 8/21/1998  Follow Up Inspection    
 8/21/1998  Waste Tire Processing Facility Inspection.    
 10/8/1998  Waste Tire Processing Facility Report Due    
 1/5/1999  Follow Up Inspection    
 1/5/1999  Waste Tire Processing Facility Inspection.    
 1/25/1999  Waste Tire Processing Facility Report Due   Ending Inventory 18,539 Tons As Of 12-31-98  
 7/2/1999  Non-Compliance Letter Issued   Hand Delivered To Jack Wilson By Cdr  
 7/12/1999  Waste Tire Processing Facility Inspection.   New Waste Tire Piles West Of Building And North Of Power Lines, Lack Of Fire Lanes  
 7/12/1999  Follow Up Inspection   Lack Of Mssw, Will Create A New Sng For New Violations - New Waste Tire Piles North And South Of Power Lines | Sng #2 Is 227951  
 7/12/1999  Waste Tire Processing Facility Inspection.    
 7/12/1999  Enforcement Project Initiated   227951 Project Number  
 7/13/1999  Submittal Received By Department   Follow-Up Letter To Meeting On 7-12-99 For Mssw System Completion By 11-7-99  
 8/25/1999  Warning Letter Issued    
 9/8/1999  Waste Tire Processing Facility Report Due   2nd Quarterly Report Received  
 9/8/1999  Waste Tire Processing Facility Report Due   1st Quarterly Report  
 9/8/1999  Permit Condition Or Consent Order/Response Due   $3000 Payment Received, Ck #107121  
 9/11/1999  Waste Tire Processing Facility Report Due   Third Quarter 1999 Received  
 9/18/1999  Telephone Conversation   Ftr Called Requesting Enforcement Meeting  
 9/22/1999  Waste Tire Processing Facility Report Due   Received 1st Quarter  
 9/22/1999  Waste Tire Processing Facility Report Due   2nd Quarterly Report Received  
 9/24/1999  Follow Up Inspection   Waste Tire Pile West Of Bldg Being Reduced, No Action On Pile North Of The Storm Water Pond, No Aciton On Tires Within 25 Feet Of Wetland Designation, Storm Water Pipes Onsite.  
 9/24/1999  Follow Up Inspection   See Cfj  
 9/24/1999  Waste Tire Processing Facility Inspection.   No New Violations, Storm Water Pipes Onsite For Mssw Construction  
 11/5/1999  Financial Assurance Documents   Cce Outdated, Letter Hand Delivered This Date For Revised Estimates | Est. Reduced To $217949.00, Pending Compliance With 1-4-2000 Letter And 2-23-2000 Letter  
 11/5/1999  Follow Up Inspection   50% Of Waste Tires In Fpl Easement Removed, Mssw System Under Construction, Tire Pile West Of Processing Bldg Still Exceeds Rule  
 11/5/1999  Waste Tire Processing Facility Inspection.   See Sng'S 195114 & 227951  
 11/5/1999  Waste Tire Processing Facility Inspection.    
 11/5/1999  Waste Tire Processing Facility Inspection.   Need Updated Cce, Hand Delivered Letter  
 11/5/1999  Follow Up Inspection   50% Tires Removed From Fpl Easement, Tire Pile West Of Processing Bldg Still Exceeds Rule Size, Mssw System Started  
 11/12/1999  Enforcement Meeting   Civetti To Draft Co With Sw Conditions In It, Forwarded Sw Condtions To Civetti 11-17-99  
 12/7/1999  Letter   Faxed Letter Stating No Response To 11-5, 11-10 Letters - Response Is Overdue. Also $3,000 Penalty Payment Is Overdued From 12-1-99  
 12/20/1999  Financial Assurance Documents   Updated Cce Received | Approved 7-21-00 With Verified Inspection On 7-20-00  
 1/3/2000  Case Referred To Other Program Or Agency   Case Reassigned From Civetti To Lurix By M. Meeker This Date, Penalties Dropped By M. Meeker, Erp Application Fee Waived By M. Meeker If Ftr Certifies Mssw By 31-Jul-2000  
 1/4/2000  Letter   Second Monthly Report Due For Mssw Progress | Report Received, Forwarded Copy To Erp  
 1/4/2000  Letter   50' Perimeter Clearance Around Waste Tires, Clear 24' East-West Roadway, Reduce Pile West Of Processing Bldg To 200'X15'X50' | Cfo 10 B, 10d,2,3,5,6  
 1/4/2000  Letter   Fourth Monthly Report Due On Status Of Mssw  
 1/4/2000  Letter   Fifth Monthly Report Due On Status Of Mssw  
 1/4/2000  Letter   Last Monthly Report Due On Status Of Mssw System Or Unless Certified Prior To Thhis Date  
 1/4/2000  Letter   Third Monthly Report Due On Status Of Mssw | Report Received, Forwarded To Erp A Copy  
 1/4/2000  Letter   M. Meeker Extened Due Date Of Mssw For Completion, Fire Lanes And Piles Due By 31-Dec-2000  
 1/4/2000  Letter   See Sng 227951, M. Meeker Extended Due Dates For Mssw Completion  
 1/4/2000  Letter   Unauthorized Storage Of Waste Tires, Trailers And Concrete Rubble In Fpl Easement To Be Removed  
 1/4/2000  Letter   Monthly Certifed Reports On Mssw Due - Letter Not Sent Till 2-6-2000, First Month Waived | Response Sent  
 1/4/2000  Letter   M. Meeker Extened Due Dates Of Pile Configurations And Seperations Onsite  
 1/4/2000  Letter   See Sng 227951, M. Meeker Extended Due Dates For Pile Configuration, Fire Lanes And Storage Areas  
 1/4/2000  Letter   Mssw Must Be Certified Complete, See Letter For Details  
 1/12/2000  Waste Tire Processing Facility Report Due   4th Quarter 99  
 1/25/2000  Submittal Received By Department   Response Received To 2-6-2000 Dep Letter, This Is An Action Item. Frt Letter Concerns About Mssw/Erp.  
 2/23/2000  Letter   Response To 1-20-00 Letter From Ftr  
 2/23/2000  Letter   Ddm Letter For Extensin Of Time For Mssw, Fire Lanes, Pile Sizes Till 21-31-2000  
 3/13/2000  Permit Condition Or Consent Order/Response Due   Payment 18 Of 20 For $3000 | Check Number  
 4/3/2000  Follow Up Inspection   Wate Tire Pile Exceeds Dimension Behind New Processing Bldg., Fire Lanes Not Maintained  
 4/3/2000  Follow Up Inspection   Tire Pile Behind New Processing Bldg Exceeds Dimension, Fire Lanes Not Maintained  
 4/4/2000  Submittal Received By Department   Received Monthly Erp Staus Report For March 2000, Forwarded To Inger Hansen For Review And Comment  
 4/4/2000  Waste Tire Processing Facility Report Due   1st Quarter 2000 Received  
 5/10/2000  Submittal Received By Department   Received Monthly Erp Status Report For April 2000 Forwarded To Inger Hansen Of Erp On 11-May-2000  
 6/6/2000  Permit Condition Or Consent Order/Response Due   Payment 19 Of 20 For $3000 | Ck # 108772 For $3000 Received  
 6/7/2000  Submittal Received By Department   Received Monthly Report For May 2000 Per Janury 2000 Letter, Forwarded Copy To Inger Hansen On 6-7-00  
 6/7/2000  Submittal Received By Department   Received Monthly Erp Status For Month Of May 2000, Forwarded To Inger Hansen Of Erp For Review And Comment  
 7/5/2000  Submittal Received By Department   Received Monthly Enforcement Report For June 2000, Forwarded To Inger Hansen 7-5-00  
 7/20/2000  Follow Up Inspection   Mssw Not Completed, Large Waste Tire Pile West Of New Process Bldg Almost Removed. Less Than 10,000  
 7/20/2000  Follow Up Inspection    
 7/20/2000  Waste Tire Processing Facility Inspection.   Quarterly Report Second Quarter, Large Pile Behind New Process Bldg Down To Less Than 10,000 Pte - Was 250,000 Pte, Mssw System Not Complete  
 8/6/2000  Submittal Received By Department   Monthly Status Report On Mssw For July 2000  
 8/17/2000  Financial Record Review   Cce Approved For $328,917.  
 8/18/2000  Waste Quantity Report    
 8/18/2000  Waste Quantity Report    
 8/18/2000  Waste Quantity Report    
 9/6/2000  Submittal Received By Department   Received Monthly Status Report For Aug 2000 On Mssw  
 9/6/2000  Financial Assurance Documents   Tlh Sent Letter That Frontier Ins. Is No Longer Listed On Federal Register, Need Replacement Mechanism  
 9/7/2000  Permit Condition Or Consent Order/Response Due   20 Of 20 Payments For $3000, Penalty Completed For $65,740.21 | Ck Number 109370, Final Payment  
 10/9/2000  Submittal Received By Department   Received Monthly Status Report For Sept. 2000 On Mssw  
 10/16/2000  Waste Tire Processing Facility Inspection.    
 10/16/2000  Follow Up Inspection    
 10/16/2000  Follow Up Inspection    
 11/13/2000  Waste Tire Processing Facility Report Due    
 12/13/2000  Follow Up Inspection    
 12/13/2000  Follow Up Inspection    
 12/13/2000  Waste Tire Processing Facility Inspection.    
 12/28/2000  Compliance W/O Formal Enforcement Action    
 12/28/2000  Follow Up Inspection    
 12/28/2000  Waste Tire Processing Facility Inspection.    
 12/28/2000  Waste Tire Processing Facility Report Due    
 12/28/2000  Case Closed By District    
 12/28/2000  Follow Up Inspection    
 12/28/2000  Case Closed By District    
 12/28/2000  Return To Compliance From Formal Enforcement    
 1/9/2001  Waste Tire Processing Facility Report Due    
 5/8/2001  Case Closed By District    
 5/8/2001  Return To Compliance From Formal Enforcement    
 5/8/2001  Compliance W/O Formal Enforcement Action    
 5/8/2001  Financial Assurance Documents   Tlh Approved Mechanism, Cce For $63,573.58 Approved Via Bank Letter Of Credit  
 5/8/2001  Case Closed By District    
 5/15/2001  Waste Tire Processing Facility Report Due   5,143 Tons Left  
 7/19/2001  Waste Tire Processing Facility Report Due    
 2/20/2002  Waste Tire Processing Facility Inspection.    
 4/24/2002  Waste Tire Processing Facility Report Due   Report Received April 29, 2002.  
 6/6/2002  Waste Tire Processing Facility Inspection.   Closure Cost Estimates Not Updated. Data Being Sent To Tallahassee By Ftri.  
 12/6/2002  Waste Tire Processing Facility Report Due   Quarterly Report Received 02/05/2003.  
 1/2/2003  Waste Quantity Report   Annual Waste Quantity Report Received 08 January, 2003.  
 1/6/2003  Financial Assurance Documents   Updated Cce Received And Approved On 1-8-03. Sent Approval Of Cce To Tlh.  
 1/21/2003  Submittal Received By Department   Letter Received From Ga. Edp Re Ftr Application For Out-Of-State Processor. | Application Approved By Ga. Edp.  
 3/21/2003  Waste Tire Processing Facility Inspection.   All Fire Lanes Reestablished And Being Maintained After Fire.  
 5/9/2003  Financial Record Review   Tlh Approved Financial Via Letter Of Credit 2001-150 To $72,000  
 5/20/2003  Renewal Application Due   Permit Issued For Renewal On 5-20-03 For 5 Years  
 5/22/2003  Waste Tire Processing Facility Inspection.    
 9/3/2003  Complaint Received   J. Saltas Complained To T. Tittle About Smoke From Ftr Fire. | Talked To Individual Re Smoke On 09/04/2003. Fire Beibg Fought.  
 9/5/2003  Complaint Investigation Scheduled    
 9/5/2003  Complaint Received    
 9/18/2003  Telephone Conversation   Discussed Realignment Of Waste Tire Piles With Owner (J. Wilson). Some Piles May Be Out Of Compliance With Rule.  
 10/15/2003  Submittal Received By Department   Emergency Response Report Received 10/20/2003 Re Fires On Property.  
 10/23/2003  Enforcement Project Initiated    
 10/23/2003  Waste Tire Processing Facility Inspection.   Compliance Issues Are Related To Pile Size, Fire Lanes, Financial Assurance, Fire Survey, And Dry Retention Area.  
 10/23/2003  Enforcement Project Initiated    
 10/23/2003  Waste Tire Processing Facility Inspection.   Issues Realted To Pile Configuration, Fire Lanes, And Financial Assurance.  
 11/10/2003  Letter   Revised Inspection Sent To Include Erp Violations - Tires Outside Of Mssw System North Of Pond  
 12/3/2003  Waste Tire Processing Facility Inspection.   Issues Remain Relative To Stormwater Dry Retention Area And Material Outside Stormwater Management Area.  
 12/9/2003  Follow Up Inspection   Isues Remain With Dry Retention Area And Pile Configurations As Well As Documentation Such As Fire Survey And Financial Assurance Docs.  
 2/9/2004  Follow Up Inspection   Pcap Not Complete. Fire Plan Not Complete. Closure Cost Estimates And Fire Plan Awaiting Final Configuration.  
 2/9/2004  Waste Tire Processing Facility Inspection.   Material Out Of Dry Retention Area. Material Removed From Area Outside Stormwater Management Area.  
 3/1/2004  Preliminary Contamination Assessment Plan   Pcap Received 03/10/2004 To Wcs. Must Be Updated To Reflect Wcs Comments.  
 4/6/2004  Waste Tire Processing Facility Report Due   1st Qtr 2004 Waste Tire Processing Facility Quarterly Report Received 07/02/2004  
 6/1/2004  Submittal Received By Department   Updated Emergency Preparedness Manual Received 7/16/2004.  
 6/8/2004  Waste Tire Processing Facility Inspection.   Financials Need Updating And Need New Fire Plan.  
 8/16/2004  Financial Record Review   Revised Cce Approved, Sent To Tlh, Est. Is Less Than Approved, But Owner Wants To Leave Higher Previous Monies In Effect.  
 3/24/2005  Waste Tire Processing Facility Inspection.    
 4/6/2005  Waste Tire Processing Facility Report Due    
 5/9/2005  Waste Tire Processing Facility Inspection.    
 7/6/2005  Waste Tire Processing Facility Report Due    
 10/6/2005  Waste Tire Processing Facility Report Due    
 1/6/2006  Waste Tire Processing Facility Report Due    
 2/22/2006  Waste Tire Processing Facility Report Due   2005 Annual Waste Tire Report Received 02/23/2006.  
 8/28/2006  Case Closed By District    
 12/8/2006  Waste Tire Processing Facility Inspection.   File Review | Inspection Passed  
 2/19/2007  Waste Tire Processing Facility Inspection.   File Review For Financial Assurance | No Financial Assurance Update Has Been Submitted To The Department For The Past Two Years.  
 3/22/2007  Waste Tire Processing Facility Report Due   2007 Third Quarterly Wt Processing Report Received 04-03-2008.  
 1/1/2008  Submittal Received By Department   Confirmation Of Annual Nat'L Fire Protection Assoc. Onsite Inspection 04-01-2008 | Passed Inspection  
 3/22/2008  Waste Tire Processing Facility Report Due   2007 Annual Wastetire Processing/Tonnage Report Received 04-03-2008.  
 3/22/2008  Waste Tire Processing Facility Report Due   2007 Second Quarterly Wt Processing Report Received 04-03-2008.  
 3/22/2008  Waste Tire Processing Facility Report Due   2007 Fourth Quarterly Wt Processing Report Received 04-03-2008.  
 3/22/2008  Waste Tire Processing Facility Report Due   2007 First Quarterly Wt Processing Report Received 04-03-2008.  
 5/2/2008  Waste Tire Processing Facility Report Due   2008 - First Quarter Waste Tire Processing / Tonnage Report Received 04-23-2008.  
 5/14/2008  Submittal Received By Department    
 5/28/2008  Site Inspection    
 6/6/2008  Waste Quantity Report    
 10/23/2008  Site Inspection    
 1/5/2009  Site Inspection    
 10/7/2009  Site Inspection    
 5/18/2010  Site Inspection    
 8/5/2010  Waste Quantity Report    
 9/16/2010  Site Inspection   Liberty Had A Fire August 31, 2010. Large Off Road Tires - Will Be Removed From The Facility. Recovered Metal Is Sold To A Steel Mill. There Was No Fire Lines Or Fire Safety Survey Available On Site. The Facility Has 30 Days To Correct The Areas O  
 9/20/2010  Department Comments    
 10/7/2010  Site Inspection   Arrived 10:25 A.M. Attendees: Leigh-Ann Dawes And Robyn James Met With George Woodward And Phil Touy Fire Started On Pile Of Waste Tire Product. 3 Piles Were Still Steaming When We Were On-Site. This Was Approximately 3,200 Tons Of Tires. The Fire De  
 10/12/2010  Department Comments    
 10/19/2010  Electronic Communication    
 10/19/2010  Electronic Communication    
 10/21/2010  Electronic Communication    
 10/21/2010  Electronic Communication    
 10/21/2010  Letter    
 10/21/2010  Submittal Received By Department    
 10/26/2010  Site Inspection   Leigh-Ann Dawes And Robyn James, Fdep Met With Phil Touhy, Liberty Tires Regional Manager. The Weather Was Warm And Dry. The Site Was No Longer Wet. The Burnt Product Has Been Removed From The The Property. (See Pictures) Fire Lanes Are Now In  
 10/29/2010  Waste Quantity Report    
 11/2/2010  Department Comments    
 11/17/2010  Letter    
 1/26/2011  Waste Quantity Report    
 2/21/2011  Financial Assurance Documents    
 3/21/2011  Site Inspection   Weather: Sunny Met With George Woodward And Larry Lighthill Leigh-Ann Dawes Emailed The Facility This Morning Regarding The Sar, Which Was Required Since The Discharge On-Site On August 31, 2010. The Facility Has Within 270 Days Of This Date To Sub  
 4/27/2011  Waste Quantity Report    
 5/5/2011  Electronic Communication    
 5/5/2011  Letter    
 7/7/2011  Monitoring Data Results    
 8/1/2011  Waste Quantity Report    
 10/3/2011  Site Inspection   Weather: Sunny Arrived: 11:32pm Met With Larry Lighthill. Mr. Lighthill Is The New General Manager Of The Site. Business Is Slightly Down. The Facility Is Competing With Authorized And Unauthorized Baling Facilities. All Processed Tire Piles Appeare  
 10/25/2011  Waste Quantity Report    
 1/24/2012  Waste Quantity Report    
 2/6/2012  Cost Estimates    
 2/13/2012  Site Inspection   Arrival: 11:00am Weather: Cold Business Is Steady. All Grinders Were Operating At The Time Of The Inspection. Normal Operation Day At The Facility During The Time Of The Inspection.  
 2/13/2012  Electronic Communication    
 2/14/2012  Electronic Communication    
 3/27/2012  Letter    
 5/7/2012  Letter    
 5/7/2012  Waste Quantity Report    
 7/30/2012  Waste Quantity Report    
 10/8/2012  Department Comments    
 10/8/2012  Electronic Communication    
 11/13/2012  Site Inspection   Arrival: 9:50 Am Weather: Hot, Overcast The Facility Is Under New Management, Mr. Gene Kostreba Is The New General Manager. The Facility Is Well Maintained, And Productive. The Goal Of The Facility Is To Not Have Any Tires On The Ground.  
 2/25/2013  Cost Estimates    
 3/14/2013  Waste Quantity Report    
 3/14/2013  Submittal Received By Department    
 3/18/2013  Letter    
 4/1/2013  Waste Quantity Report    
 5/8/2013  Site Inspection    
 8/2/2013  Waste Quantity Report    
 8/2/2013  Waste Quantity Report    
 10/30/2013  Waste Quantity Report    
 11/1/2013  Department Comments    
 11/7/2013  Site Inspection    
 2/10/2014  Waste Quantity Report    
 6/4/2014  Site Inspection   Arrival 9:35am Weather: Hot, Sticky, Partly Cloudy Facility Is Operating Accordingly To The Permit Conditions. Facility Has Made Many Changes To Operate Efficiently And Safely.  
 11/6/2014  Waste Quantity Report    
 11/6/2014  Waste Quantity Report    
 11/19/2014  Site Inspection   Facility Is Operating Accordingly To Permit Conditions.  
 3/24/2015  Waste Quantity Report    
 7/27/2015  Site Inspection   Arrival 9:00 Am Weather Hot The Container That Housed Used Oil Needs To Be Properly Closed And Placed Within Secondary Containment. Please Submit Photo Within 14 Days To Magdalena Gierczak To Show That It Has Been Taken Care Of.  
 6/27/2016  Site Inspection   The Facility Was Inspected By Department Personnel On June 26, 2016, For Routine Compliance With Solid Waste And Used Tire Rules And Regulations. The Facility Is Authorized To Operate A Waste Tire Processing Facility Under Permit Number 0041202-005-  
 8/18/2016  Letter    
 5/8/2017  Site Inspection   The Facility Was Inspected By Department Personnel On May 8, 2017, For Routine Compliance With Solid Waste And Used Tire Rules And Regulations. The Facility Is Authorized To Operate A Waste Tire Processing Facility Under Permit Number 0041202-005-Wt,  
 11/29/2017  Site Inspection   The Facility Was Inspected By Department Personnel On 11/29/2016, For A Complaint By Oer With Solid Waste And Used Tire Rules And Regulations. The Facility Is Authorized To Operate A Waste Tire Processing Facility Under Permit Number 0041202-005-Wt,  
 6/18/2018  Waste Quantity Report    
 6/27/2018  Site Inspection   Inspectors Arrived At The Facility Around 9:30 Am The Weather Was Hot And Sunny. A Tour Of The Facility Was Conducted And Observations Of The Complaint Behind Building 4 Were Documented. The Complaint Stated That Rubber Shreds Were Being Dumped Into  
 7/26/2018  Waste Quantity Report    
 2/8/2019  Waste Quantity Report    
 4/25/2019  Waste Quantity Report    
 5/31/2019  Site Inspection   Florida Dep Inspectors Arrived At 11am On May 31, 2019. The Weather Was Hot And Sunny. Keith Bloomer, S.E. Region Project Manager, Facilitated A Tour Of The Facility And Records Review. The Inspectors Did Not Observe The Presence Of Rainwater Collect  
 6/21/2019  Letter    
 7/2/2019  Letter    
 7/31/2019  Waste Quantity Report    
 8/19/2019  Submittal Received By Department    
 12/13/2019  Waste Quantity Report    
 1/22/2020  Waste Quantity Report    
 4/16/2020  Waste Quantity Report    
 6/30/2020  Site Inspection   On June 30, 2020, Kelly Purdy With The Florida Department Of Environmental Protection ("Fdep") Conducted A Routine Operation Inspection For A Waste Tire Processor At Liberty Tire. Rick Douglas, General Manager Facilitated The Tour And Provided The Re  
 7/7/2020  Submittal Received By Department    
 7/7/2020  Submittal Received By Department    
 11/17/2020  Waste Quantity Report    
 11/17/2020  Waste Quantity Report    
 1/20/2021  Waste Quantity Report    
 6/25/2021  Waste Quantity Report    
 7/14/2021  Site Inspection   On July 14, 2021, Kelly Purdy And Justin Stark With The Florida Department Of Environmental Protection ("Fdep") Conducted A Routine Operation Inspection For A Waste Tire Processor At Liberty Tire. Chase Hinton, Safety And Procurement, Facilitated The  
 8/3/2021  Waste Quantity Report    
 2/24/2022  Waste Quantity Report    
 2/24/2022  Waste Quantity Report    
 7/19/2022  Site Inspection   On July 19, 2022, Jacob Davis, Alannah Irwin, Tarin Tischler, And Michele Defreitas With The Florida Department Of Environmental Protection ("Fdep") Conducted A Routine Operation Inspection For A Waste Tire Processor At Liberty Tire. Rick Douglas, Ge  
 7/26/2022  Waste Quantity Report    
 9/16/2022  Waste Quantity Report    
 12/7/2022  Waste Quantity Report    
 2/3/2023  Waste Quantity Report    
 2/24/2023  Site Inspection   On February 24, 2023, Jacob Davis, Esther Thorne, And Kaitlyn Taylor With The Florida Department Of Environmental Protection ("Fdep") Conducted A Routine Operation Inspection For A Waste Tire Processor At Liberty Tire Recycling, Llc, Located At 9675  
 5/1/2023  Written Compliance Assitance Offer    
 5/18/2023  Waste Quantity Report    
 5/18/2023  Submittal Received By Department    
 9/18/2023  Waste Quantity Report    
 11/3/2023  Waste Quantity Report    
 11/3/2023  Cost Estimates    

Violation History

Vio# Area Regulation Opened
By
Date
Determined
Completed ETA Act Act Date Regulation Text Excerpt   (mouse over for more text)
AOC    62-711.500(3), 62-713.600(6)(a), 62-701.630, 62-701.730(11)(a), 62-701.710(7)(a), 62-701.710(1)(d)1.  James_R  9/16/2010  10/19/2010    169000000000011 9/16/2010   Owners or operators of waste tire sites shall provide closing cost estimates for the quantity of waste tires on their site or the quantity of waste tires that they are permitted to have on their site, whichever is greater. The cost estimate shall be
AOC    62-711.500(3), 62-713.600(6)(b), 62-713.600(6)(c), 62-701.630(4), 62-701.730(11)(a), 62-701.710(7)(a), 62-701.710(1)(d)1.  James_R  9/16/2010  10/19/2010    169000000000011 9/16/2010   Owners or operators of waste tire sites shall provide closing cost estimates for the quantity of waste tires on their site or the quantity of waste tires that they are permitted to have on their site, whichever is greater. The cost estimate shall be
AOC    62-711.540(1)(d)  James_R  9/16/2010  10/21/2010    169000000000011 9/16/2010   Fire protection services for the site shall be assured through notification to local fire protection authorities. A fire safety survey shall be conducted at least annually and the survey report shall be made part of the next quarterly report.
AOC    62-711.540(1)(d)  James_R  9/16/2010  10/27/2010    169000000000011 9/16/2010   Fire protection services for the site shall be assured through notification to local fire protection authorities. A fire safety survey shall be conducted at least annually and the survey report shall be made part of the next quarterly report.
AOC    62-711.540(3)(b)  James_R  9/16/2010  10/27/2010    169000000000011 9/16/2010   An outdoor waste tire pile shall have no greater than the following maximum dimensions:
AOC    62-711.540(3)(c)  James_R  9/16/2010  10/27/2010    169000000000011 9/16/2010   A 50-foot wide fire lane shall be placed around the perimeter of each outdoor waste tire pile. Access to the fire lane for emergency vehicles must be unobstructed at all times.
AOC    62-711.540(3)(c)  James_R  9/16/2010  10/27/2010    169000000000011 9/16/2010   A 50-foot wide fire lane shall be placed around the perimeter of each outdoor waste tire pile. Access to the fire lane for emergency vehicles must be unobstructed at all times.
   62-701.300(3)  Dawes_La  10/12/2010  10/27/2010    125000000000088 10/12/2010   Burning. Open burning of solid waste is prohibited except in accordance with Chapter 62-256, F.A.C. Controlled burning of solid waste is prohibited except in a permitted incinerator, or in a facility in which the burning of solid waste is authorized
   62-711.540(3)(b)  Dawes_La  10/12/2010  10/27/2010    125000000000088 10/12/2010   An outdoor waste tire pile shall have no greater than the following maximum dimensions:
   62-711.540(1)(d)  Thorne_E  2/27/2023  3/31/2023    189019 2/27/2023   Fire protection services for the site shall be assured through notification to local fire protection authorities. A fire safety survey shall be conducted at least annually and the survey report shall be made part of the next quarterly report.
   62-711.540(1)(d)  Thorne_E  2/27/2023  3/31/2023    189019 2/27/2023   Fire protection services for the site shall be assured through notification to local fire protection authorities. A fire safety survey shall be conducted at least annually and the survey report shall be made part of the next quarterly report.