Activity History for:

FACID: 60080, MEDLEY LANDFILL

Note: ETA links to Enforcement Tracking Activity

Date Done Activity Type Activity Comments   (mouse over for more text) ETA Link
 1/23/1993  Contamination Assessment Report   Car Review  
 2/9/1993  Compliance Evaluation Inspection    
 2/17/1993  Letter   Qapp Response From Waste4  
 4/8/1993  Letter   Qapp Returned  
 8/12/1993  Letter   Revised Qapp Approved  
 9/2/1993  Compliance Evaluation Inspection    
 10/28/1993  Compliance Evaluation Inspection    
 1/31/1994  Letter   Methane Above Lel Notification  
 2/8/1994  Compliance Evaluation Inspection    
 2/8/1994  Compliance Evaluation Inspection    
 3/18/1994  Letter   Methane Above Lel Notification  
 4/21/1994  Contamination Assessment Report   Review Letter To Waste  
 5/17/1994  Compliance Evaluation Inspection    
 5/20/1994  Letter   Qapp Revised By Waste  
 6/2/1994  Compliance Evaluation Inspection    
 7/18/1994  Letter   Time Extension Request For Car  
 7/30/1994  Letter   Methane Exceeds Lel Notification  
 9/26/1994  Compliance Inspection    
 9/26/1994  Compliance Evaluation Inspection    
 10/28/1994  Letter   Surface Water Sample Review  
 12/12/1994  Letter   Response To Surface Water Review  
 1/4/1995  Permit Condition Or Consent Order/Response Due   Dec. 1994 Mor  
 2/3/1995  Permit Condition Or Consent Order/Response Due   Jan. 1995 Mor  
 3/8/1995  Permit Condition Or Consent Order/Response Due   Feb. 1995 Mor  
 3/9/1995  Compliance Inspection    
 4/6/1995  Permit Condition Or Consent Order/Response Due   Mar. 1995 Mor  
 7/11/1995  Compliance Inspection    
 2/9/1996  Landfill Inspection (Class 1)    
 3/28/1996  Follow Up Inspection   Site Visit With Erp To Determine Storm Water Compliance.  
 4/3/1996  Landfill Inspection (Class 1)    
 7/2/1996  Landfill Inspection (Class 1)    
 7/2/1996  Material Recovery/Recycler Inspection.   Not Operating Yet. Mssw Complete. Site Paved. Equip There.  
 9/30/1996  Landfill Inspection (Class 1)   Strong Odors On East And South Side Of Old Cell. Grass/Weeds Very Long  
 9/30/1996  Material Recovery/Recycler Inspection.   Site Not Operating Yet. They Are Waiting For Final Mssw Inspection  
 12/17/1996  Landfill Inspection (Class 1)    
 12/17/1996  Material Recovery/Recycler Inspection.   Not Operating Due To Equipment Repair (Conveyor Belts)  
 3/4/1997  Letter   Semi Annual Review Completed  
 3/19/1997  Material Recovery/Recycler Inspection.    
 3/19/1997  Landfill Inspection (Class 1)    
 7/9/1997  Landfill Inspection (Class 1)    
 7/9/1997  Material Recovery/Recycler Inspection.    
 7/9/1997  Material Recovery/Recycler Inspection.    
 12/9/1997  Material Recovery/Recycler Inspection.    
 12/9/1997  Landfill Inspection (Class 1)    
 2/2/1998  Submittal Received By Department   Elevation Survey  
 3/2/1998  Groundwater Monitoring Report   Report For October 1997 Sampling Event.  
 6/3/1998  Monitoring Data Results Reviewed   Review September 1997 Bienniel Ground Water Quality Assessment Report And Gw/Leachate Data From April And October 1997. | Jorge P. Responded To Paul W.On 7/10/98. Arsenic In Background Well Mw01dr2 Found Above Mcl.  
 6/4/1998  Groundwater Monitoring Report   For April 7, 1998 Sampling Event.  
 6/6/1998  Monitoring Data Results Reviewed   1997 Biennial Gw Quality Assessment Report, Gw/Leachate Data From April And October 1997 | Reviewed Data And Submitted Comments - By Jorge P.  
 6/17/1998  Monitoring Data Results Reviewed   Erp Application # 13-0137638-001 Review Request | Proposed Changes To Storm Water Management May Require Changes To Solid Waste Gw Monitoring Permit - Deferred Recommendation Until Solid Waste Permit For "Infill" Area Is Submitted - Jorge P.  
 8/5/1998  Material Recovery/Recycler Inspection.   Permittee Not To Process More Than 1500 Cubic Yards Per Day. Permittee Will Apply For Modification To Their Permit To Process More Than 1500 Cubic Yards.  
 8/11/1998  Landfill Inspection (Class 1)    
 8/11/1998  Material Recovery/Recycler Inspection.    
 11/18/1998  Landfill Inspection (Class 1)    
 11/18/1998  Material Recovery/Recycler Inspection.    
 2/18/1999  Landfill Inspection (Class 1)    
 2/18/1999  Material Recovery/Recycler Inspection.    
 4/4/1999  Landfill Inspection (Class 1)   Also, Observed The Construction Of Southern Expansion.  
 4/4/1999  Landfill Inspection (Class 1)    
 4/7/1999  Material Recovery/Recycler Inspection.   Also, Inspected The Ongoing Construction Of Southern Expansion.  
 4/27/1999  Material Recovery/Recycler Inspection.    
 4/27/1999  Landfill Inspection (Class 1)   Also, Observed The Construction Of Southern Expansion.  
 5/19/1999  Landfill Inspection (Class 1)    
 6/30/1999  Material Recovery/Recycler Inspection.    
 6/30/1999  Landfill Inspection (Class 1)   Inspected The Completion Of Phase Ii Of South Expansion.  
 7/12/1999  Gas Survey   All Readings Within Acceptable Levels  
 7/21/1999  Landfill Inspection (Class 1)   Also,Inspected The Ongoing Construction Of Southern Expansion.  
 7/21/1999  Material Recovery/Recycler Inspection.    
 9/5/1999  Permit Condition Or Consent Order/Response Due   Annual Elevation Survey. Specific Condition # 17.  
 9/28/1999  Financial Assurance Documents   Mrf Closure Estimate Approved. Part Of Site Estimate That Includes Landfill.  
 9/28/1999  Financial Assurance Documents   Closure And Long Term Care Approved. Estimate Includes Closure Of C&D Mrf.  
 11/13/1999  Gas Survey   4th Qtr. Gas Migration Survey.  
 12/15/1999  Groundwater Monitoring Report   Results From Sampling Events That Took Place October 20-21 And November 12-13, 1999.  
 12/20/1999  Landfill Inspection (Class 1)    
 12/20/1999  Material Recovery/Recycler Inspection.    
 1/24/2000  Landfill Inspection (Class 1)    
 1/24/2000  Landfill Inspection (Class 1)    
 4/4/2000  Groundwater Monitoring Report   Results Of 4/4-5/2000 Groundwater Sampling Event And Leachate Sampled 4/11. Received June 16, 2000.  
 7/3/2000  Landfill Inspection (Class 1)    
 7/3/2000  Material Recovery/Recycler Inspection.    
 9/18/2000  Financial Record Review   Reveiwed Cce/Ltc, Approved Sent To Tlh  
 9/28/2000  Financial Assurance Documents   Closure Cost Estimate Updated For 106 Acre Site, Approved  
 10/2/2000  As Built Drawings   Phase Iii Certified Construction To Operate  
 10/6/2000  As Built Drawings Approved    
 10/17/2000  Groundwater Monitoring Report   Groundwater Sampling Took Place October 17-18, 2000.  
 11/14/2000  Financial Record Review   Tlh Approved Ins. $15 Mil For Closure And $10 Mil Long Term Care  
 11/14/2000  Renewal Application Due    
 11/14/2000  Renewal Application Due    
 11/14/2000  Financial Record Review   Tlh Approved Financial Mechanism, See Medley Landfill For Approval. Mrf Cce And Ltc Is In Lnadfill Mechanism.  
 11/27/2000  Landfill Inspection (Class 1)    
 11/27/2000  Material Recovery/Recycler Inspection.    
 12/15/2000  Submittal Received By Department   Received Ceertification Of Construction Of Laechate Force Main For Phase 3.  
 1/11/2001  Permit Condition Or Consent Order/Response Due   Annual Survey  
 1/15/2001  Groundwater Monitoring System Installation   Mw-22wt, Mw-23s, Mw-23i, Received Report And Comments Received Form Wcs On 2-27-01 | Letter Sent To Wmif With Wcs Comments 3-1-01  
 2/1/2001  Material Recovery/Recycler Inspection.   Site Is Too Small For Amount Of Waste Being Handled  
 2/1/2001  Material Recovery/Recycler Inspection.    
 2/1/2001  Material Recovery/Recycler Inspection.    
 2/1/2001  Landfill Inspection (Class 1)    
 4/11/2001  Submittal Received By Department   Survey Of Wells Mw22wt, Mw23s And Mw23i Received Per 3-01-01 Letter, Forwarded To Wcs  
 4/24/2001  Groundwater Monitoring Report   Received Semi-Annual Monitoring Event, Forwarded To Wcs For Review | Received Comments 7-10-01, Sent Letter  
 9/25/2001  Material Recovery/Recycler Inspection.    
 9/25/2001  Landfill Inspection (Class 1)   Well Cluster 25 Was Damaged By Failure Of South Slope Final Cap.  
 10/5/2001  Groundwater Monitoring Report   Gwmr Received 09 Jan 2002, Forwarded To Wcu 11 Jan 2002. | Letter Sent To Medley Jan 28, 2002. No Major Problems.  
 10/18/2001  Financial Assurance Documents   Closure Cost Estimate Due | Received And Approved Cce/Ltc, Sent To Tlh  
 1/10/2002  Material Recovery/Recycler Inspection.   Conducted Icw Multi-Media Inspection  
 1/10/2002  Material Recovery/Recycler Inspection.   Inspection Part Of A Multi-Media Inspection Involving Derm And Fdep.  
 1/10/2002  Landfill Inspection (Class 1)   Inspection Performed As Part Of A Multi-Media Inspection/Mrf Also Inspected.  
 1/12/2002  Submittal Received By Department   Annual Aerial Survey And Remaining Airspace Determination Received.  
 2/19/2002  Groundwater Monitoring Report   Received 1999 Biennual Report For Years 1995-1999, Forwarded To Wcs This Date  
 2/26/2002  Submittal Received By Department   Letter Re Replacement Of Mw25-I And Mw25-S. Wells Damaged When Side Collapsed. | Wells To Be Installed 06 March 2002.  
 4/1/2002  Complaint Received   Landfill Odors Objectionable At 9401 Nw 106th St., Medley  
 4/2/2002  Case Referred To Other Program Or Agency   Odor Complaint Fax'D To Derm.  
 4/3/2002  Groundwater Monitoring Report   1st Semi-Annual Gwmr Received May 17, 2002. To Wcu 23 May.  
 4/5/2002  Leachate Report   Quarterly Leachate Report Received 04/18/2002.  
 4/5/2002  Submittal Received By Department   Quarterly Operating Report Received 04/18/2002.  
 5/30/2002  Groundwater Report   Biennial Groundwater Quality Assessment Report Received 16 Jan, 2003. | Comments Received From Wcs 02/20/2003. Letter Sent 02/24/2003.  
 6/12/2002  Landfill Inspection (Class 1)    
 6/12/2002  Material Recovery/Recycler Inspection.    
 7/22/2002  Complaint Received   Miami-Dade Derm Issued Nov To Landfill For Odors And Leachate Problems Sent Complaint To Us | Sed Sw Personnel Visited Site 08/07/02 To Investigate. Resolution Pending.  
 8/12/2002  Letter   Letter Sent Re August 07, 2002 Complaint Investigation. 5 Day Response Required.  
 10/1/2002  Landfill Inspection (Class 1)    
 10/1/2002  Material Recovery/Recycler Inspection.    
 10/8/2002  Groundwater Monitoring Report   Received 12/16/02. To Wcs 12/16/02.. | Comments From Wcs Received 2/20/2003. Letter Sent 02/24/2003.  
 10/8/2002  Submittal Received By Department   Annual Aerial Survey And Remaining Life Letter Received 08/01/2003.  
 10/14/2002  Submittal Received By Department   3rd Qtr Operating Report Received 10/17/2002.  
 11/20/2002  As Built Drawings   Certification Of Closure Of Phase Ii, South Slope Of Medley 18 Acres | Inspected By Lurix, In Compliance With Abd, Sent Inspection Electronically 12-19-02  
 12/17/2002  Material Recovery/Recycler Inspection.   Facility Has Been Shut Down By Wmi. Town Of Medley And Wmi Reached Agreement And Wmi Shut Facility Down Due To Traffic.  
 12/17/2002  Landfill Inspection (Class 1)   Leachate In Mssw Along East Side, Just South Of Access Road - Wmi Pumped Out While I Was There  
 1/13/2003  Submittal Received By Department   Quarterly Operating Report Received Jan 16, 2003.  
 3/6/2003  Financial Record Review   Approved Cce And Ltc, Sent To Tlh  
 3/6/2003  Financial Record Review   Approved Cce/Ltc, Sent To Tlh  
 3/17/2003  Financial Record Review   Approved Revised Cce/Ltc - $18,882,448 (124 Acres) And $11,105,822 (141 Acres) - Forwarded Tlh  
 3/20/2003  Submittal Received By Department   Response To Biennial And 2nd Semi-Annual Gwmr Received 03/24/2003. To Wcs. | E-Mail Sent To Medley Re Results Of Review On 04/22/2003. Comments Adequately Addressed.  
 4/1/2003  Submittal Received By Department   Groundwater Study Report Received 09/10/2003. Investigation Of Arsenic Contamination For Sks Tlh.  
 4/8/2003  Waste Quantity Report   1st Quarter Report Received April 15, 2003.  
 4/29/2003  Groundwater Monitoring Report   1st Semiannual Gwmr And Leachate Monitoring Report Received June 25, 2003 To Wcs 6/26. | Send Letter To Medley Re Gwmr Review...08/27/2003.  
 5/1/2003  Gas Monitoring Report   Quarterly Gas Migration Monitoring Report Received 07/18/2003. No Exceedances.  
 5/8/2003  Gas Monitoring Report   No Exceedances Noted..  
 5/14/2003  Submittal Received By Department   Well Completion Report Received 05/15/2003. 3 Clusters Installed And One Replacement Cluster Installed.  
 6/4/2003  Material Recovery/Recycler Inspection.    
 6/4/2003  Landfill Inspection (Class 1)    
 6/9/2003  Financial Record Review   Tlh Approved  
 6/30/2003  As Built Drawings   Received As-Builts For Saddle Fill, Inspected 7-16-03, Missing Leachate Pumps And Electric, Contingent Upon Receiving Proof Of Pumps And Electric To Lift Station  
 7/7/2003  Waste Quantity Report   Quarterly Operating Report For 2nd Quarter Received 07/14/2003.  
 7/7/2003  Waste Quantity Report   Quarterly Operating Report For 2nd Quarter 2003 Received 07/14/2003.  
 7/16/2003  As Built Drawings Approved   Saddle Fill Approved Contingent Upon Receiving Proof Of Electric To Lift Station And Pumps In Place.  
 7/24/2003  Gas Monitoring Report   Gas Monitoring Report Received 10/02/2003. No Exceedances.  
 9/12/2003  As Built Drawings Approved   Phase I A Closure Documentation Received, 6.8 Acres On South Side Of Landfill  
 9/21/2003  Submittal Received By Department   Response To Wcs Comments On 1st Qtr Gwmr Received 09/24/2003.. To Wcs 09/24/2003.  
 10/9/2003  Waste Quantity Report   3rd Quarter Operating Report Received 10/17/2003.  
 10/14/2003  Groundwater Monitoring Report   Gwmr With Leachate Report Received 12/29/2003. To Wcs 12/30/2003.  
 10/16/2003  Gas Monitoring Report   Gas Migration Monitoring Report For 4th Qtr 2003 Receivedm02/02/04. No Problems Or Exceedances.  
 11/18/2003  Landfill Inspection (Class 1)    
 11/18/2003  Material Recovery/Recycler Inspection.   Mrf Closed Down Voluntarily By Wmi  
 12/19/2003  Submittal Received By Department   Resampling Data For Well Mw26wt Received 02/20/2004. To Wcs 02/23/2004. | Wcs States That Evaluation Monitoring Needs To Commence And Contamination Evaluation Plane Needs To Be Submitted.  
 1/13/2004  Waste Quantity Report   4th Qtr Quarterly Operations Report Received Jan 22, 2004. Total Of 146,719 Tons Of Class I, 17,790 Tons C&D | Average Of 1,857 Tons Per Day. 225 Tons Per Day Of C&D.  
 1/22/2004  Permit Condition Or Consent Order/Response Due   Annual Elevation Survey Received 01/23/04. Iaw Specific Condition # 14. | Life Estimated At 10 Years, 9,350,000 Cubic Yards Airspace Left.  
 1/29/2004  Gas Monitoring Report   1st Qtr 2004 Gas Migration Monitoring Report Received 04/26/04. No Exceedances.  
 1/30/2004  Landfill Inspection (Class 1)    
 4/9/2004  Financial Assurance Documents   Approved Cce/Ltc For 2003  
 4/14/2004  Waste Quantity Report   Qor Received 04/20/2004.  
 4/22/2004  Groundwater Monitoring Report   1st Semiannual Gwmr And Leachate Data Received 06/25/2004. To Wcs 06/28/2004. | Memo From Wcs Received. E-Mail To Mdc Dswm.  
 4/26/2004  Submittal Received By Department   Letter Received Re Mw-26wt Evaluation Monotoring Started For This Well. Letter Received 04/30/2004.  
 6/3/2004  Landfill Inspection (Class 1)    
 7/13/2004  Waste Quantity Report   2nd Qtr 2004 Waste Quantity Report Received 7/22/2004.  
 7/28/2004  Submittal Received By Department   Response To Gwmr Comments Received 07/29/04. To Wcs Electronically 7/30.  
 9/10/2004  Submittal Received By Department   Contamination Evaluation Plan And Final Report For Mw 26wt Received 09/13/2004. To Wcs 09/14.  
 10/14/2004  Waste Quantity Report   Quarterly Operating Report For 3rd Qtr 2004 Received 10/18/2004.  
 10/19/2004  Groundwater Monitoring Report   2nd 2004 Semiannual Report Received 12/30/2004. To Wcs 01/03/2005.  
 1/13/2005  Waste Quantity Report   4th Qtr 2004 Wqr Received Jan 20, 2005.  
 1/26/2005  Permit Condition Or Consent Order/Response Due   Annual Landfill Life Report Received On 1/28/2005.  
 2/22/2005  Financial Assurance Documents   Document Received 02/24/2005. Have Adjusted Closure Costs For Inflation (1.015) | Financial Assurance Docs Reviewed And Approved By Tlh.  
 3/2/2005  Landfill Inspection (Class 1)   Work Progressing On New Cells. All Liner In Place, Being Covered With Dirt.  
 4/7/2005  Waste Quantity Report   1st Qtr 2005 Wqr Received 04/18/2005.  
 4/21/2005  Groundwater Monitoring Report   1st 2005 Semi-Annual Gwmr Received 7/1/05. To Wcs 8/4/05. | Wcs Review Received On 8/15/05. No Response Requested.  
 4/25/2005  Gas Monitoring Report   Gas Migration Mon. Report For 2nd & 3rd Qtr 2005 Received 8/22/05. No Exceedances. | Samples Taken On 4/25/05 And 7/20/05.  
 4/27/2005  Leachate Report   1st 2005 Semi-Annual Lr Received 7/1/05. To Wcs 8/4/05. | Wcs Review Received On 8/15/05. No Comments, No Response Requested.  
 4/28/2005  Landfill Inspection (Class 1)    
 6/30/2005  Landfill Inspection (Class 1)    
 7/12/2005  Submittal Received By Department   Leachate Collection System Inspection Report Received 08/01/200. No Blockages Reported.  
 7/15/2005  Waste Quantity Report   2nd Qtr 2005 Wqr Received 07/18/2005.  
 7/20/2005  Submittal Received By Department   Resampling Results For 1st 2005 Semi-Annual Gwmr Received 8/24/05. To Wcs 8/30/05. | Wcs Review Received On 9/8/2005. No Response Requested.  
 8/3/2005  Groundwater Monitoring Report   Biennial Groundwater Quality Assessment Report For 2003-2004 Received 8/5/2005. | Wcs Review Received On 8/24/05. No Response Requested.  
 9/10/2005  Renewal Application Due   Renewal Application In-House.  
 9/29/2005  Landfill Inspection (Class 1)    
 10/11/2005  Groundwater Monitoring Report   2nd Semiannual Gwmr Received January 12, 2006. To Wcs January 13, 2006.  
 1/13/2006  Waste Quantity Report   4th Qtr 2005 Wqr Received 01/17/2006.  
 1/15/2006  Waste Quantity Report   1st Quarter Report Ton/Lech/Gas  
 1/27/2006  Permit Condition Or Consent Order/Response Due   Annual Landfill Life Report Received 1/30/2006.  
 2/3/2006  Financial Assurance Documents   Financial Assurance Docs Received 02/08/2006. Adjusted For Inflation (1.020)  
 2/15/2006  Waste Quantity Report   1st Quarter Report Ton/Lech/Gas  
 3/15/2006  Waste Quantity Report   1st Quarter Report Ton/Lech/Gas  
 4/13/2006  Landfill Inspection (Class 1)   Inspection Ppassed  
 6/15/2006  Landfill Inspection (Class 1)    
 7/5/2006  Waste Quantity Report   2nd Quarter Ops Report  
 7/25/2006  Groundwater Monitoring Report   1st Semi Annual Gwmr Inc Cd Rom  
 10/5/2006  Waste Quantity Report   3rd Qtr Wqr Received 10/05/2006.  
 10/23/2006  Groundwater Monitoring Report   2nd Semi-Annual 2006 Gw Received 1-26-07 To Wcs 1-26-07. | Wcs Reviewed The Report And Comments Sent To The Permittee Electronically Via Oculus.  
 12/15/2006  Landfill Inspection (Class 1)   Reviewed Files | Inspection Passed  
 1/5/2007  Permit Condition Or Consent Order/Response Due   Annual Landfill Life Report Recieved 2-1-07 Remaining Landfill Capacity As Of January 5th, 07 Is 13,423,223 Tons And 22.3 Years .  
 2/14/2007  Landfill Inspection (Class 1)   File Review | Inspection Passed  
 2/22/2007  Financial Record Review   Annual Closure And Long-Term Care Cost Updates Received 3/2/07  
 3/7/2007  Landfill Inspection (Class 1)   File Review | Rich Nolan Informed Me They'Re Replacing The Underground Pumps With Over Ground For Better Management Of The Leachate Systems.  
 4/10/2007  Waste Quantity Report   First Quarterly Operating Report For January, February, And March 2007.  
 7/10/2007  Waste Quantity Report   2nd Quarter Operating Report April Thru June 2007.  
 7/17/2007  Groundwater Monitoring Report   1st Semi-Annual 07 Groundwater Monitoring Received 10-09-07 To Wcs 10-10-07.  
 9/17/2007  Landfill Inspection (Class 1)   Unsatisfactory | They Have A New Working Face Effective As Of 9-18-07as Rich Nolan Stated. I Observed That The New Working Face Didn'T Meet 62- 701.500(7)(C)And I Pointed That To Rich Nolan And His Response Was The Slope Isn'T Complete Yet.  
 10/5/2007  Waste Quantity Report   Received 10-04-07 | 3rd Quarter Operation Report  
 10/15/2007  Waste Quantity Report   Quarterly Operating Report For The Months Of October Thru December 2007. R'Cvd 1/07/2007 | Report Contains Leachate And Gas Quanities Removed For October Thru December 2007.  
 11/12/2007  Waste Quantity Report   Received 11-13-2007 | Quarterly Operating Report For The Months Of July Thru September 07.  
 12/31/2007  Waste Quantity Report   2007 Fourth Quarter Operating And Leachate Report Received 01/07/2008.  
 1/25/2008  Permit Condition Or Consent Order/Response Due   Annual Life Landfill Report Rec'D January 29, 2008 | Remaining Capacity 12,919.164 Tons And Remaining Years 21.5 Of Approximately 600.000 Tons Per Yr.  
 1/31/2008  Landfill Inspection (Class 1)   File Review | Satisfactorily Passed All Aspects Of The Site Inspection.  
 3/5/2008  Groundwater Monitoring Report   2007 Second Semiannual Gwmr Results Received 3-17-2008 Sent To Wcs 3-17-2008  
 5/13/2008  Site Inspection    
 6/9/2008  Waste Quantity Report    
 8/5/2008  Groundwater Monitoring Report    
 10/15/2008  Waste Quantity Report    
 10/15/2008  Groundwater Report    
 10/15/2008  Groundwater Report    
 10/29/2008  Department Comments    
 10/30/2008  Site Inspection    
 11/10/2008  Waste Quantity Report    
 12/2/2008  Department Comments    
 12/9/2008  Submittal Received By Department   See Attachment Site Plan  
 3/26/2009  Site Inspection    
 4/2/2009  Department Comments    
 6/2/2009  Submittal Received By Department    
 7/7/2009  Submittal Received By Department    
 8/3/2009  Groundwater Monitoring Report   The January 2009 First Semiannual Gwmr Can Be Accessed In The Oculus Database.  
 8/12/2009  Site Inspection   Response From Es Consultants Indicates Waste Mgt. Of Florida Has Begun Compliance With Above Cited Rule. Subsequent Sampling Reports Indicate Significant Decreases In Cited Exceedences.  
 2/15/2010  Monitoring Only Plan   Installation Of Groundwater Monitoring Wells: Mw32d / Mw32i & Mw32s Abandonment Of Groundwater Monitoring Wells: Mw28d / Mw28i / Mw28s & Mw30s  
 3/24/2010  Site Inspection    
 6/4/2010  Department Comments    
 6/23/2010  Site Inspection    
 7/8/2010  Department Comments    
 7/13/2010  Department Comments    
 7/26/2010  Letter    
 8/5/2010  Letter    
 8/17/2010  Letter    
 8/18/2010  Letter    
 8/31/2010  Site Inspection   Inspection Date: 9/1/10 Arrived: 11:15am Weather: Hot, Sticky, Rain And Muddy Attendees: Fdep- R James, A Dimonnay And La Dawes, Waste Management - Alisa Kyle And Nick Khoury, P.E. The Facility Is Approximately 147 Acres. There Some Erosion On  
 9/2/2010  Department Comments    
 9/3/2010  Submittal Received By Department    
 9/14/2010  Submittal Received By Department    
 9/27/2010  Submittal Received By Department    
 9/27/2010  Submittal Received By Department    
 10/14/2010  Waste Quantity Report    
 10/19/2010  Meeting    
 11/8/2010  Department Comments    
 11/10/2010  Groundwater Monitoring Report    
 11/16/2010  Submittal Received By Department    
 12/23/2010  Department Comments    
 1/21/2011  Leachate Report    
 1/21/2011  Waste Quantity Report    
 1/28/2011  Letter    
 2/9/2011  Site Inspection   Arrived: 10:21am Weather: A Little Windy Not Much Attendees: Fdep R James, La Dawes And Wm Alisa Kyle The Facility Is Taking Waste From Resource Recovery Facility While That Facilities Boilers Are Down For Maintenance. The Facilities Tonnage  
 2/10/2011  Department Comments    
 2/21/2011  Financial Assurance Documents    
 2/25/2011  Letter    
 3/31/2011  Site Inspection   This Site Visit Was Prompted As A Follow To The Eastern Expansion Application, Reviewed By The Solid Waste And Waste Cleanup'S Professional Engineer, Art E. Torvela. Art & Amede Drove To Medley Landfill Thursday March 31, 2011 And Arrived Around 10  
 4/4/2011  Letter    
 4/27/2011  Waste Quantity Report    
 6/23/2011  Site Inspection   Arrived: 1:45pm Weather: Hot And Humid Gas Pipes Are Currently Being Put In To Send Gas From West To East On The Landill.There Are Still Plans To Build Another Cell On The Facility'S Hurricane Debris Site. A Higher Berm Surrounds This Area. All Leach  
 6/28/2011  Phone Conversation    
 6/28/2011  Electronic Communication    
 6/28/2011  Site Inspection   Revised Comments From Previous 6.23.2011 Inspection: Arrived: 1:45pm Weather: Hot And Humid Gas Pipes Are Currently Being Put In To Send Gas From West To East On The Landill.There Are Still Plans To Build Another Cell On The Facility'S Hurricane  
 6/29/2011  Groundwater Monitoring Report    
 7/20/2011  Waste Quantity Report    
 8/29/2011  Electronic Communication    
 8/31/2011  Site Inspection   The Leachate Seepage Occured In The North Side Of The Medley Landfill. The Seepage Was Ongoing During The Time Of The Inspection. Leachate Is Discharging Into The Ground Past The Lined Landfill Into The Proposed Northwest Expansion Area.  
 9/8/2011  Site Inspection   Arrived: 8:30am Weather: Hot And Humid Following Up On The Previous Inspection On August 31, 2011; I Could See That The Area With Leachate Seeps Had Been Cleaned Up. A Truck Was On-Site To Temporarily Pump Out The Leachate From The Area. The Facili  
 9/13/2011  Enforcement Tracking    152843
 9/13/2011  Enforcement Referral   Closed  
 9/15/2011  Letter    
 9/21/2011  Groundwater Monitoring Report    
 9/23/2011  Warning Letter    152843
 9/27/2011  Phone Conversation    152843
 9/28/2011  Letter    
 9/29/2011  Meeting    152843
 10/6/2011  Electronic Communication    152843
 10/6/2011  Consent Order    152843
 10/19/2011  Waste Quantity Report    
 10/26/2011  Consent Order    152843
 12/1/2011  Letter    
 1/18/2012  Waste Quantity Report    
 1/24/2012  Site Inspection   Arrived: 12:15 Pm Weather: Hot At The Time Of The Inspection On 1-25-12 It Was Normal Operation.  
 1/26/2012  Electronic Communication    
 1/26/2012  Groundwater Monitoring Report    
 2/1/2012  As Built Drawings    
 2/20/2012  Electronic Communication    
 2/20/2012  Electronic Communication    
 2/20/2012  Department Comments    
 3/6/2012  Electronic Communication    
 3/6/2012  Cost Estimates    
 4/5/2012  Letter    
 5/7/2012  Waste Quantity Report    
 6/18/2012  Site Inspection   Arrival: 10:30am Weather: Sunny, Hot The Facility Has Construction Taking Place. Tonnage Is Steady.  
 6/20/2012  Electronic Communication    
 7/3/2012  Groundwater Monitoring Report    
 7/6/2012  Department Comments    
 7/6/2012  Electronic Communication    
 7/16/2012  Waste Quantity Report    
 8/9/2012  Electronic Communication    
 8/16/2012  Department Comments    
 10/9/2012  Letter    
 10/23/2012  Waste Quantity Report    
 10/30/2012  Site Inspection   The Permittee Has Done Tremendous Maintenance Work To Improve The Operation Of The Facility. They Installed A Couple Of Downchutes To Control Erosion And A New Backroad In The Ne Corner Was Built To Access The Newly Capped Area In The Ne Corner Of Th  
 1/4/2013  Letter    
 3/14/2013  Letter    
 3/18/2013  Waste Quantity Report    
 4/22/2013  Site Inspection    
 7/15/2013  Groundwater Monitoring Report    
 7/31/2013  Department Comments    
 7/31/2013  Electronic Communication    
 8/1/2013  Waste Quantity Report    
 8/2/2013  Waste Quantity Report    
 8/2/2013  Letter    
 10/7/2013  Groundwater Monitoring Report    
 10/24/2013  Site Inspection   The Working Face Was Muddy Due To Recent Rain. There Was A Large Amount Of Soil Stored Off Of The Ne Corner Of The Landfill. The Operation Was In Accordance With The Permit During The Time Of The Inspection.  
 10/30/2013  Waste Quantity Report    
 12/30/2013  Gas Monitoring Report    
 12/30/2013  Groundwater Monitoring Report    
 1/23/2014  Groundwater Monitoring Report    
 1/23/2014  Department Comments    
 1/25/2014  Site Inspection   The Construction Certification Report (Volumes 1 & 2) Submitted On November 3, 2014 By Waste Management Inc. Of Florida. The Report Was Prepared By Scs Engineers Dated November 3, 2014. The Project Permitted By Fdep (Department Permit No. 0056401-017  
 2/12/2014  Waste Quantity Report    
 4/15/2014  Site Inspection   The Installation Of Liners In The Northeast Expansion Was Observed During The Inspection. The Facility Is Operating In Accordance With Chapter 62-701, Florida Administrative Code And The Statutes. Please Pay Attention To The 2013 Second Semi Annual G  
 4/24/2014  Waste Quantity Report    
 6/23/2014  Groundwater Monitoring Report    
 7/1/2014  Department Comments    
 7/24/2014  Waste Quantity Report    
 8/21/2014  Site Inspection   Scs Globex Crew Members Were Onsite Working To Finalize Construction For The Ne Expansion Such As Tying The 6 Inch Pipe To The Existing Manhole For The New Cells. There Was No Non-Compliance Issue Noted During The Inspection.  
 11/5/2014  Waste Quantity Report    
 11/6/2014  Gas Monitoring Report    
 11/6/2014  Gas Monitoring Report    
 12/17/2014  Groundwater Monitoring Report    
 12/18/2014  Department Comments    
 2/17/2015  Waste Quantity Report    
 5/13/2015  Gas Monitoring Report    
 5/14/2015  Waste Quantity Report    
 6/25/2015  Site Inspection   Art And Amede Conducted An Inspection Of Construction Certification Report Cell 6 And A Regular Inspection For The Entire Medley Landfill Site On June 25, 2015. There Was A Minor Violation Noted During The Site Inspection. Monitoring Well (Mw 15i) W  
 7/16/2015  Waste Quantity Report    
 1/20/2016  Site Inspection   We (Paul Wierzbicki And Amede Dimonnay) Drove Around The "Lowell Dunn'S Property And Then Backed Out To 77th Street Before We Entered The Facility. We Arrived At The Facility About 12:30 Pm On January 20, 2016 And Conducted A Solid Waste Inspection A  
 1/12/2017  Site Inspection   Inspector Arrived Onsite At 9:15 Am To Conducted A Solid Waste Inspection Along With Mr. Joe Gagne, District Manager. We Started At The Top Of The Landfill To Have An Aerial View Of The Active Working Face And The Surrounding New Subdivisions Around  
 11/15/2017  Site Inspection   Inspector Arrived Onsite At 9:45 Am To Conducted A Solid Waste Inspection Along With Mr. Yoansy Vina, Onsite Supervisor. We Started At The Top Of The Landfill To Have An Aerial View Of The Active Working Face And The Surrounding New Subdivisions Arou  
 6/5/2018  Gas Survey    
 6/8/2018  Gas Monitoring Report    
 6/22/2018  Letter    
 7/2/2018  As Built Drawings    
 7/2/2018  As Built Drawings    
 12/21/2018  Groundwater Monitoring Report    
 12/28/2018  Gas Monitoring Report    
 12/28/2018  Department Comments    
 1/24/2019  Department Comments    
 3/6/2019  Site Inspection   The Inspector Arrived Onsite At 10:45am On March 6, 2019. The Weather Was Cool, Clear And Windy. Before A Tour Of The Facility, Juan San Martin, The Operations Manager, Provided The Up To Date Operation Plan, Training Records, Leachate And Rainfall,  
 3/14/2019  Letter    
 4/3/2019  Letter    
 5/21/2019  Submittal Received By Department    
 7/2/2019  Gas Monitoring Report    
 10/7/2019  Gas Monitoring Report    
 1/10/2020  Gas Monitoring Report    
 3/18/2020  Submittal Received By Department    

Violation History

Vio# Area Regulation Opened
By
Date
Determined
Completed ETA Act Act Date Regulation Text Excerpt   (mouse over for more text)
   62-701.510(3), 62-701.510(4)  Fishkin_B  4/7/2009  8/18/2009    15000000000008 4/7/2009   Ground water monitoring., Surface water monitoring.
AOC    62-701.730(12)  Fishkin_B  4/8/2009  8/18/2009    15000000000008 4/8/2009   Annual Reports. The owner or operator of the facility shall submit an annual report to the Department on Form 62-701.900(7). This report shall include a summary of the amounts and types of wastes disposed of or recycled. The county of origin of mater
AOC    62-701.500(7)(c)  James_R  9/2/2010  2/9/2011    169000000000006 9/2/2010   Solid waste shall be formed into cells to construct horizontal lifts. The working face of the cell, and side grades above land surface, shall be at a slope no greater than three feet horizontal to one foot vertical rise. Lift depth shall not exceed 1
AOC    62-701.500(7)(j)  James_R  9/2/2010  2/9/2011    169000000000006 9/2/2010   Erosion control measures shall be employed to correct any erosion which exposes waste or causes malfunction of the storm water management system. Such measures shall be implemented within three days of occurrence. If the erosion cannot be corrected w
   62-701.500(10), 62-701.400(9)(b)  Dimonnay_A  8/31/2011  11/1/2011    16000000000015 8/31/2011   Stormwater system management. Stormwater management systems shall be operated and maintained as necessary to meet the requirements of subsection 62-701.400(9), F.A.C., Stormwater or other surface water which comes into contact with the landfilled sol
   62-701.500(2)(j), 62-701.500(8)(b), 62-701.500(8)(h)  Dimonnay_A  8/31/2011  11/1/2011    16000000000015 8/31/2011   Maintaining and cleaning the leachate collection system., The landfill operator is responsible for the operation of the leachate collection and removal system and for maintaining the system as designed for the design period. Leachate shall be collect
AOC    62-713.400(3), 62-701.510(3), 62-701.510(4), 62-701.730(8)(f), 62-701.730(10)  James_R  1/24/2012  2/20/2012    169000000000055 1/24/2012   Water quality monitoring plan. A water quality monitoring plan which meets the requirements of Rule 62-701.510 and Chapter 62-522, F.A.C. and is based upon the hydrogeological investigation required in paragraph 62-713.300(3)(c), F.A.C., shall be inc
   62-701.620(8), 62-701.510(2)(b)  Dimonnay_A  6/29/2015  1/21/2016    167905 6/29/2015   Replacement of monitoring devices. If a monitoring well or other device required by the monitoring plan is destroyed or fails to operate for any reason, the landfill owner or operator shall, immediately upon discovery, notify the Department in writin