Solid Waste Facility Compliance History



Activity History for:

FACID: 51614, SARASOTA CENTRAL LANDFILL COMPLEX

Note: ETA links to Enforcement Tracking Activity

Date Done Activity Type Activity Comments   (mouse over for more text) ETA Link
 1/15/1994  Permit Condition Or Consent Order/Response Due   Well Installation  
 2/3/1994  Permit Condition Or Consent Order/Response Due   Submit Survey Of Wells And Surface Water Monitoring Stations  
 5/16/1994  Permit Condition Or Consent Order/Response Due   Well Installation Information  
 11/3/1994  Permit Condition Or Consent Order/Response Due   Initial Well Sampling  
 6/27/1995  Permit Condition Or Consent Order/Response Due   Apply For Permit Renewal  
 6/27/1995  Permit Condition Or Consent Order/Response Due   Construction Complete  
 12/30/1996  Letter   Rec'D Minutes From Progress Meeting  
 1/27/1997  Submittal Received By Department   Initial Surface Water Sampling  
 4/22/1997  Site Visit   Site Visit To Observe All Water Quality Monitoring Points - Amram | In Compliance  
 7/9/1997  Financial Assurance Documents   Pelz-Approved 7-29-97  
 2/5/1998  Comprehensive Quality Assurance Plan    
 3/11/1998  Gas Monitoring Report   Not Required Until Accepting Waste  
 3/11/1998  Gas Monitoring Report   Not Required Until Operational  
 8/20/1998  Permit Condition Or Consent Order/Response Due   Surface Water  
 8/20/1998  Permit Condition Or Consent Order/Response Due   Jrm-Jan To Jun 1998 Sw Sampling | Reported For Required Parameters Including App I  
 8/20/1998  Groundwater Monitoring Report    
 9/4/1998  Financial Assurance Documents   Pelz-Infl Adj Ests Rec'D;Rai Sent 10-19-98, Called Several Times; Approved 8-23-99  
 9/4/1998  Financial Assurance Documents   Pelz-Infl Adj Ests; Rai Sent 10-19-98,Called Several Times; Approved 8-23-99  
 10/7/1998  Gas Monitoring Report   Morris; Gp-4 @ 400%; Gp-6 @ 360% | Initial Gas Monitoring Event Submitted  
 10/20/1998  Landfill Inspection (Class 1)   Nichols; Too Many Refrig'S Also Lrg. Accum. Of Yt, Hot Load Not Separated  
 10/21/1998  Waste Tire Processing Facility Inspection.   Nichols  
 10/23/1998  Waste Tire Processing Facility Report Due    
 12/17/1998  Gas Monitoring Report   Morris; Gp-6 @ 900%  
 12/24/1998  Permit Condition Or Consent Order/Response Due   Jrm- Jul To Dec 1998 Sw Sampling; B-6 Dry, No Sample Reported | Reported Required Paramters Including App I  
 1/7/1999  Leachate Report   Jul-Dec 1998 | Jrm-Leachate Pump #1 Reported For App. Ii Parameters  
 1/7/1999  Groundwater Monitoring Report   Jul/Dec 1998  
 1/12/1999  Waste Tire Processing Facility Report Due    
 2/25/1999  Landfill Inspection (Class 1)   Nichols; Lrg. Accum. Of Yt, Should Start Putting On Inter.Cover  
 2/25/1999  Waste Tire Processing Facility Inspection.   Nichols  
 4/13/1999  Waste Tire Processing Facility Report Due    
 4/14/1999  Gas Monitoring Report   Morris; Gp-4 @ 200%; Gp-6 @ 400%  
 7/14/1999  Leachate Report   Jan/Jun 1999, First Report From El Labs, Inc. | Jrm-Leachate Pumps #1/#2 Reported For App. Ii Parameters  
 7/14/1999  Gas Monitoring Report   Morris; Gp-5 @ 600%; Gp-6 @ 760%; Gp-1 @ 100%  
 7/16/1999  Permit Condition Or Consent Order/Response Due   Jrm- Sampled 4/12/99; B2,B3,B4r,B6 And B7 Reported Dry-No Sample | Sampled 4/27/99; Elevated Conductivity @ B-1; Elevated Mdl For Unionized Ammonia  
 7/19/1999  Groundwater Monitoring Report   Morris; Required Wells Sampled 4/28 To 4/30/99 | Reported Required Parameters Including App. I  
 7/23/1999  Waste Tire Processing Facility Report Due    
 8/31/1999  Financial Assurance Documents   Sjp-Infl Adj Ests; Rai 9-13-99;Approved 11-9-99;Funding Ok 3-10-00  
 8/31/1999  Financial Assurance Documents   Sjp-Infl Adj Ests; Rai 9-13-99;Approved 11-9-99;Funding Ok 3-10-00  
 9/1/1999  Landfill Inspection (Class 1)    
 9/1/1999  Waste Tire Processing Facility Inspection.    
 10/4/1999  Gas Monitoring Report   Morris; Gp-1 @ 240%; Gp-3 @ 120%; Gp-6 @ 760%  
 10/20/1999  Waste Tire Processing Facility Report Due    
 11/17/1999  Gas Monitoring Report    
 12/28/1999  Gas Monitoring Report   Never Recieved!  
 12/28/1999  Gas Monitoring Report   Never Recieved!  
 12/28/1999  Leachate Report   Never Recieved!  
 1/11/2000  Waste Tire Processing Facility Report Due    
 1/18/2000  Permit Condition Or Consent Order/Response Due   Morris- Sampled 11/3-4/99; B-2 Reported To Be Dry-No Sample | Elevated Fe,Unionized Ammonia,Fecal Coliform  
 1/19/2000  Groundwater Monitoring Report   Morris- Sampled 11/2 To 11/4 For Required Parameters | Exceedances For Na,Cl, Tds @ Background Well; Arsenic At Mw-9  
 1/19/2000  Leachate Report   Quality | Morris- Reported One Sample For App I Parameters; Sampled 11/4/99  
 1/20/2000  Gas Monitoring Report    
 1/26/2000  Landfill Inspection (Class 1)   Litter-Windy Day, Propane Tanks Should Not Be In Scrap Metal Pile | Spotter Training Ok - Msp  
 1/26/2000  Waste Tire Processing Facility Inspection.   Ok - Msp  
 1/28/2000  Groundwater Report   Morris; Moved Due Date To 1/15/00 At Meeting Conducted 11/9/99; Rec'D Letter Requesting Extension Until 1/28/00 | Gw Mon. Plan Evaluation  
 4/10/2000  Waste Tire Processing Facility Report Due   Petro  
 5/8/2000  Gas Monitoring Report    
 5/22/2000  Monitoring Data Results Reviewed   Gw - 1/15/00  
 5/23/2000  Permit Condition Or Consent Order/Response Due   Surface Water Quality; Sampled 3/1/00; B2,B6 Reported Dry-No Sample | Morris- Exceedances Reported For Ph,Fe; Elevated Mdl For Unionized Ammonia  
 6/23/2000  Landfill Inspection (Class 1)   Petro  
 7/11/2000  Groundwater Monitoring Report   Exceedances Reported For Ph,As,Fe,Na,Cl,Tds | Morris- Verbal Approval Of Time Extension To 7/31/00  
 7/11/2000  Leachate Report   Quality | Morris- Reported One Sample For App Ii Parameters; Sampled 3/1/00  
 7/12/2000  Waste Tire Processing Facility Report Due    
 8/23/2000  Financial Assurance Documents   Sjp-Infl Adj Ests Approved 9-7-00 | Funding Approved 3/16/01  
 8/23/2000  Financial Assurance Documents   Sjp-Infl Adj Ests Approved 9-7-00 | Funding Approved 3/16/01  
 9/5/2000  Gas Monitoring Report   Sampled-8/29/00  
 10/5/2000  Waste Tire Processing Facility Report Due    
 10/11/2000  Landfill Inspection (Class 1)    
 10/11/2000  Waste Tire Processing Facility Inspection.    
 11/7/2000  Monitoring Data Results Reviewed   Gw - 7/15/00  
 12/6/2000  Leachate Report   Quality | Morris- One Sample Reported For App I Parameters; Sampled 10/19/00  
 12/21/2000  Gas Monitoring Report   Sampled 12/19/00  
 1/10/2001  Waste Tire Processing Facility Report Due    
 1/12/2001  Permit Condition Or Consent Order/Response Due   Surface Water Sampling Results;Sampled 10/19/00 And 11/1/00 | Morris- Exceedances Reported For Ph,Turbidity,Copper,Iron,Lead,Zinc,Fecal Coliform  
 1/16/2001  Groundwater Monitoring Report   Sampled 10/00; Resampling Conducted 1/01 | Morris- Exceedances Reported For Ph,As,Fe,Na,Cl,Tds; As Confirmed @Mw-9  
 2/23/2001  Waste Tire Processing Facility Inspection.    
 2/23/2001  Landfill Inspection (Class 1)    
 3/27/2001  Gas Monitoring Report    
 4/6/2001  Waste Tire Processing Facility Report Due    
 6/11/2001  Permit Condition Or Consent Order/Response Due   Surface Water Sampling Results; Sampled 3/27/01 @ B1 And B3 Only | Morris- Exceedances Reported For Conductivity  
 6/11/2001  Groundwater Monitoring Report   Sampled 4/2-9/01 | Morris- Exceedances Reported For Ph,Fe,Pb,Na,Cl,Tds; Mw-2 Not Sampled  
 6/11/2001  Leachate Report   Sampled 3/28/01 | Morris- 1 Sample Reported For App. Ii Parameters  
 6/20/2001  Landfill Inspection (Class 1)   Sis-Mw-8 Not Fixed,Spotter On Ground Not Trained | Groundwater  
 6/26/2001  Monitoring Data Results Reviewed   Gw - 1/15/01  
 7/6/2001  Gas Monitoring Report    
 7/12/2001  Waste Tire Processing Facility Report Due    
 8/30/2001  Financial Assurance Documents   Sjp-Rai 9/27/01;Approved 1-30-02  
 8/30/2001  Financial Assurance Documents   Sjp-Rai 9/27/01;Approved 1-30-02 | Funding Ok 04/04/2002  
 9/25/2001  Waste Tire Processing Facility Inspection.   Sis,Cwb;  
 9/25/2001  Landfill Inspection (Class 1)   Sis,Cwb-Berm Around Working Face Not Clean Fill  
 10/1/2001  Gas Monitoring Report   Sampled 9/26/01  
 10/10/2001  Waste Tire Processing Facility Report Due   Cwb-34.90tons On Site  
 12/3/2001  Permit Condition Or Consent Order/Response Due   Surface Water Sampled 9/19/01 | Morris- Exceedances Reported For Ph,Cu,Fe,Zn,Fecal Coliform  
 12/5/2001  Monitoring Data Results Reviewed   Gw - 7/15/01  
 12/7/2001  Leachate Report   Sampled 9/19/01 | Morris- 1 Sample Reported For App. I Parameters  
 12/13/2001  Gas Monitoring Report   Sampled 12/07/01  
 1/11/2002  Waste Tire Processing Facility Report Due    
 1/14/2002  Groundwater Monitoring Report   Sampled 9/24-25/01 | Morris- Exceedances Reported For Ph,Fe,Na,Chlorides,Tds; Mw-2 Was Not Sampled  
 1/17/2002  Landfill Inspection (Class 1)   Sis  
 2/28/2002  Renewal Application Due    
 3/1/2002  Groundwater Report   Mon Plan Evaluation Provided As Part Of Permit Renewal  
 3/1/2002  Renewal Application Due   Incl. Lcrs Inspection  
 3/20/2002  Gas Monitoring Report    
 3/26/2002  Monitoring Data Results Reviewed   Gw - 1/15/02  
 4/8/2002  Financial Assurance Documents   Fac. Turned In On 09/30/2002, Repsonse From Dep 04/08/2002  
 4/8/2002  Letter   Tall. Confirming Fin. Assurance For Facility  
 4/15/2002  Waste Tire Processing Facility Report Due    
 5/17/2002  Gas Monitoring Report    
 5/21/2002  Landfill Inspection (Class 1)   Llm- Some Litter Near Working Face; Amount & Quality Of Initial Cover Near Working Face Seems Thin  
 5/21/2002  Waste Tire Processing Facility Inspection.    
 7/12/2002  Waste Tire Processing Facility Report Due    
 7/17/2002  Waste Tire Processing Facility Report Due    
 7/17/2002  Waste Tire Processing Facility Report Due    
 7/17/2002  Financial Assurance Documents    
 7/17/2002  Renewal Application Due    
 7/26/2002  Permit Condition Or Consent Order/Response Due   Surface Water Sampling Results; Morris- Approved Verbal Request For Time Extension From 7/15/02  
 7/26/2002  Leachate Report   Quality Sampled 2/11/02 Received 7/26/02 | Reviewed 10/12/04 - Smc; Includes Appendix Ii Parameters  
 7/26/2002  Groundwater Monitoring Report   Morris- Approved Verbal Request For Time Extension From 7/15/02; Sampled 2/12-20/02 | Morris- Exceedances Reported For Ph,Iron,Sodium,Chlorides,Tds  
 8/30/2002  Financial Assurance Documents   Sjp- Infl Adj Rai 10/17/02; Approved 12/9/02 | Funding Ok; 4/18/03  
 8/30/2002  Financial Assurance Documents   Sjp- Infl Adj Rai 10/17/02; Approved 12/9/02  
 9/11/2002  Landfill Inspection (Class 1)   Lr- Fad Recieved By Dep But Has Not Been Reviewed  
 9/11/2002  Waste Tire Processing Facility Inspection.   Lr- Fad Recieved By Dep But Has Not Been Reviewed At Time Of Inspection  
 9/30/2002  Gas Monitoring Report    
 10/7/2002  Leachate Report    
 10/17/2002  Waste Tire Processing Facility Report Due    
 12/4/2002  Gas Monitoring Report    
 1/15/2003  Leachate Report   Balance Report  
 1/15/2003  Waste Tire Processing Facility Report Due    
 1/29/2003  Landfill Inspection (Class 1)   Lr- Flagging @ Daily Cover  
 2/3/2003  Leachate Report   Quality Sampled 8/23/02 Received 2/3/03 | Reviewed 10/12/04 - Smc.  
 2/3/2003  Groundwater Monitoring Report   Approved Written Request For Time Extension From 1/15/03, Rec'D 1/16/03; Sampled 8/26 To 9/5/02 | Morris- Exceedances Reported For Iron, Sodium, Chloride, Tds  
 3/26/2003  Gas Monitoring Report    
 4/16/2003  Waste Tire Processing Facility Report Due    
 4/16/2003  Leachate Report   Quantity  
 4/23/2003  Renewal Application Due    
 4/23/2003  Permit Condition Or Consent Order/Response Due   Project Report; Annual Report  
 4/23/2003  Permit Condition Or Consent Order/Response Due   Project Report; Annual Report  
 4/23/2003  Waste Quantity Report    
 4/23/2003  Permit Condition Or Consent Order/Response Due   Ops Plan  
 4/23/2003  Waste Quantity Report    
 4/23/2003  Permit Condition Or Consent Order/Response Due   Ops Plan  
 4/23/2003  Waste Quantity Report    
 4/23/2003  Waste Quantity Report   Wqr, Compost, Anaylsis  
 4/23/2003  Waste Quantity Report    
 4/30/2003  Waste Tire Processing Facility Inspection.   Lr- Ok  
 4/30/2003  Landfill Inspection (Class 1)   Lr- Ponding Water; Daily Flagging  
 7/7/2003  Gas Monitoring Report    
 7/10/2003  Waste Tire Processing Facility Report Due    
 7/16/2003  Groundwater Monitoring Report   Sampled 5/5/03, 6/10/03 (Resample); Mw-2 Damaged And Was Not Sampled | Morris- Exceedances Reported For Arsenic, Iron, Sodium, Chloride, Tds  
 7/16/2003  Leachate Report   Quality Sampled 5/5/03 Received 7/16/03; Leachate Quantity Report Rec'D 7/10/03 | Reviewed 10/13/04 - Smc. Includes Appendix Ii Parameters  
 8/1/2003  Financial Assurance Documents   Sgm- Infl Adj Rai 8/20/03; Approved 11/12/03  
 9/5/2003  Gas Monitoring Report    
 9/9/2003  Monitoring Data Results Reviewed   Gw - 7/15/02  
 9/19/2003  Non-Compliance Letter Issued   Kf- Slopes, Drainage, Site Plans  
 10/17/2003  Waste Tire Processing Facility Report Due    
 11/25/2003  Letter   Asbestos Received Not Doubled Baged  
 12/4/2003  Gas Monitoring Report    
 1/12/2004  Leachate Report   Quantity  
 1/13/2004  Waste Tire Processing Facility Report Due    
 1/15/2004  Landfill Inspection (Class 1)   Lmr- Unacceptable In Scrap, Break In Berm  
 1/26/2004  Leachate Report   Quality Sampled 10/7/03, Received 1/26/04 | Reviewed 10/13/04 - Smc  
 1/26/2004  Groundwater Monitoring Report   Morris- Time Ext. Request From 1/15/04 Rec'D 1/21/04; Included Surface Water; Sampled 10/21 To 10/23/03 | Morris- Exceedances Reported For Arsenic, Iron, Sodium, Chloride, Tds  
 2/15/2004  Gas Monitoring Report    
 4/7/2004  Leachate Report   Quanity Report  
 4/12/2004  Waste Tire Processing Facility Report Due    
 4/19/2004  Waste Tire Processing Facility Inspection.   Lmr- Ok  
 4/19/2004  Landfill Inspection (Class 1)   Lmr- Daily Cover Flagging  
 5/14/2004  Gas Monitoring Report   Sampled 4/29/04  
 6/17/2004  Groundwater Monitoring Report   Sampled 3/29-30/04 | Morris- Exceedances Reported For Arsenic, Iron, Sodium, Chloride, Tds  
 6/17/2004  Leachate Report   Quality | Reviewed 7/20/04 - Smc  
 7/7/2004  Gas Monitoring Report    
 7/9/2004  Waste Tire Processing Facility Report Due    
 8/12/2004  Financial Assurance Documents   Funding Ok 7/26/05  
 8/12/2004  Financial Assurance Documents   Inflation Adjustment Rai; Sgm Approved 8/24/04 | Funding Ok 7/26/05  
 10/8/2004  Waste Tire Processing Facility Report Due   Financial Adjustment Rai | Sgm Approved 8/24/04  
 11/17/2004  Waste Tire Processing Facility Inspection.   Lmr, Imj- Chipped Tires In Vegetation; Fire Safety Could Not Be Found  
 11/17/2004  Landfill Inspection (Class 1)   Lmr, Imj- Flagging; Oil  
 1/12/2005  Leachate Report   Cells 1-4 And Leachate Tank Sampled 10/26/04 | Reported App. I Parameters  
 1/12/2005  Leachate Report   Quantity  
 1/12/2005  Groundwater Monitoring Report   11/23/04 Sw Event, 10/14 To 10/20/04 Gw Event; Semi-Annual Report | Exceedances Reported For Ph, Arsenic, Iron, Sodium, Chloride, Tds  
 1/12/2005  Waste Tire Processing Facility Report Due    
 4/8/2005  Gas Monitoring Report    
 4/8/2005  Leachate Report   Generation  
 4/11/2005  Waste Tire Processing Facility Report Due    
 4/28/2005  Monitoring Data Results Reviewed   Gw - 1/15/03 | Imj  
 4/28/2005  Monitoring Data Results Reviewed   Gw - 7/15/04 | Imj  
 4/28/2005  Monitoring Data Results Reviewed   Gw - 7/15/03 | Imj  
 4/28/2005  Monitoring Data Results Reviewed   Gw - 1/15/04 | Imj  
 5/3/2005  Landfill Inspection (Class 1)   L. Ross, D. Nichols | Break In Berm, Lrg. Working Face, Printers Found In Scrap Metal, Housekeeping In Hhw Area  
 6/7/2005  Letter   Leachate Discharge To Sw Ditch  
 6/27/2005  Gas Monitoring Report    
 7/8/2005  Leachate Report   Generation  
 7/14/2005  Waste Tire Processing Facility Report Due    
 7/15/2005  Leachate Report   Cells 1-4 And Leachate Tank Sampled 4/12/05 | App. Ii Parameters Reported  
 7/15/2005  Groundwater Monitoring Report   Sampled 4/26 To 5/9/05 | Exceedances Reported For Ph, Arsenic, Rion, Sodium, Chloride, Tds  
 7/29/2005  Groundwater Monitoring Report    
 7/29/2005  Leachate Report   Quality  
 7/29/2005  Permit Condition Or Consent Order/Response Due   Inspection Of Interior Of Tank  
 7/29/2005  Leachate Report   Quality  
 7/29/2005  Financial Assurance Documents    
 7/29/2005  Leachate Report   Quality  
 7/29/2005  Gas Monitoring Report    
 7/29/2005  Financial Assurance Documents    
 7/29/2005  Leachate Report   Quanitity  
 7/29/2005  Permit Condition Or Consent Order/Response Due   Cap, Topo  
 7/29/2005  Leachate Report   Quantity  
 7/29/2005  Leachate Report   Quantity  
 7/29/2005  Groundwater Monitoring Report    
 7/29/2005  Gas Monitoring Report    
 7/29/2005  Leachate Report   Quality  
 7/29/2005  Financial Assurance Documents    
 7/29/2005  Leachate Report   Quality  
 7/29/2005  Leachate Report   Quantity  
 7/29/2005  Groundwater Monitoring Report    
 7/29/2005  Leachate Report   Quality  
 7/29/2005  Gas Monitoring Report    
 7/29/2005  Permit Condition Or Consent Order/Response Due   Inspection Of Interior Of Tank  
 7/29/2005  Permit Condition Or Consent Order/Response Due   Surface Water  
 7/29/2005  Groundwater Monitoring Report    
 7/29/2005  Leachate Report   Quantity  
 7/29/2005  Permit Condition Or Consent Order/Response Due   Leachate Assessment Report, Videotape, Inspection Results  
 7/29/2005  Leachate Report   Quantity  
 7/29/2005  Gas Monitoring Report    
 7/29/2005  Gas Monitoring Report    
 7/29/2005  Permit Condition Or Consent Order/Response Due   Surface Water  
 7/29/2005  Gas Monitoring Report    
 7/29/2005  Permit Condition Or Consent Order/Response Due   Surface Water  
 7/29/2005  Permit Condition Or Consent Order/Response Due   Surface Water  
 7/29/2005  Leachate Report   Quality  
 7/29/2005  Gas Monitoring Report    
 7/29/2005  Permit Condition Or Consent Order/Response Due   Surface Water  
 7/29/2005  Permit Condition Or Consent Order/Response Due   Install New Wells  
 7/29/2005  Gas Monitoring Report    
 7/29/2005  Groundwater Monitoring Report    
 7/29/2005  Permit Condition Or Consent Order/Response Due   Cap, Topo  
 7/29/2005  Leachate Report   Quantity  
 7/29/2005  Gas Monitoring Report    
 7/29/2005  Leachate Report   Quantity  
 7/29/2005  Permit Condition Or Consent Order/Response Due   Surface Water  
 7/29/2005  Leachate Report   Quantity  
 7/29/2005  Leachate Report   Quantity  
 7/29/2005  Permit Condition Or Consent Order/Response Due   Surface Water  
 7/29/2005  Permit Condition Or Consent Order/Response Due   Surface Water  
 7/29/2005  Leachate Report   Quantity  
 7/29/2005  Groundwater Monitoring Report    
 7/29/2005  Renewal Application Due    
 7/29/2005  Permit Condition Or Consent Order/Response Due   Cap, Topo  
 7/29/2005  Gas Monitoring Report    
 8/3/2005  Waste Tire Processing Facility Inspection.   No Perimeter Fire Lanes  
 8/3/2005  Permit Condition Or Consent Order/Response Due   Tank Inspection Report For 2004 | Rec'D During Inspection  
 8/3/2005  Landfill Inspection (Class 1)   Dn Filling In Nw Corner Of Cell 2, Piping Leachate Over Waste To Nw Corner Of Cell 4  
 8/8/2005  Gas Monitoring Report   Results From 8/4/05  
 8/22/2005  Financial Assurance Documents   Inflation Adjustment Rai  
 8/22/2005  Financial Assurance Documents   Inflation Adjustment Rai  
 9/20/2005  Permit Condition Or Consent Order/Response Due    
 10/11/2005  Leachate Report   Quantity | Btg  
 10/14/2005  Waste Tire Processing Facility Report Due   Btg  
 10/20/2005  Permit Condition Or Consent Order/Response Due    
 11/20/2005  As Built Drawings    
 1/15/2006  Leachate Report    
 1/17/2006  Waste Tire Processing Facility Report Due    
 1/17/2006  Groundwater Monitoring Report   Sampled 12/13/05 -Btg | Exceedances Reported For Ph, Arsenic, Iron, Tds  
 1/23/2006  Gas Monitoring Report    
 2/16/2006  Permit Condition Or Consent Order/Response Due   Analytical Results For New Wells, 8r Replaces 8a(Damaged), Ref. E-3 Of Permit, 1r,2r,4r Not Yet Installed  
 2/16/2006  Groundwater Monitoring Report   Initial Sampling Event At Mw-8r, Mw-11r And Mw-12r Conducted 12/15 To 12/21/05 | Exceedances Reported For Ph, Iron, Tds  
 3/7/2006  Landfill Inspection (Class 1)    
 3/7/2006  Waste Tire Processing Facility Inspection.    
 4/15/2006  Permit Condition Or Consent Order/Response Due   Topo Survey & Remaining Calculations  
 4/19/2006  Waste Tire Processing Facility Report Due   1st Quarter 2006 (Ltr 4-14-06)  
 5/12/2006  Gas Monitoring Report   No Exceedances; Sampled 5/8/06  
 7/13/2006  Leachate Report   Quality  
 7/13/2006  Waste Tire Processing Facility Report Due   2nd Quarter 2006 (Ltr 7-11-06)  
 7/13/2006  Leachate Report   Quantity / Sampled On 4/17/06  
 7/20/2006  Permit Condition Or Consent Order/Response Due    
 8/15/2006  Renewal Application Due    
 8/15/2006  P2 Final Report    
 8/16/2006  Leachate Report    
 8/16/2006  Groundwater Monitoring Report   Sampled 4/18 To 4/23/06 | Exceedances Reported For Ph, Arsenic, Iron, Sodium, Chloride, Tds  
 8/16/2006  Financial Assurance Documents    
 8/16/2006  Permit Condition Or Consent Order/Response Due    
 8/16/2006  Financial Assurance Documents    
 8/16/2006  Financial Assurance Documents    
 8/16/2006  Leachate Report    
 8/16/2006  Financial Assurance Documents    
 8/16/2006  Leachate Report   Quantity, Semi-Annual | Waiting To Verify Above Entry, Can'T Find Submittal  
 8/16/2006  Financial Assurance Documents    
 8/16/2006  Financial Assurance Documents    
 8/16/2006  Leachate Report    
 8/17/2006  Groundwater Monitoring Report    
 8/17/2006  Permit Condition Or Consent Order/Response Due    
 8/17/2006  Groundwater Monitoring Report    
 8/17/2006  Groundwater Monitoring Report    
 8/17/2006  Permit Condition Or Consent Order/Response Due    
 8/17/2006  Permit Condition Or Consent Order/Response Due    
 8/17/2006  Permit Condition Or Consent Order/Response Due   Topo Survey & Remaining Capacity Calculations  
 8/17/2006  Permit Condition Or Consent Order/Response Due    
 8/17/2006  Groundwater Monitoring Report    
 8/17/2006  Groundwater Monitoring Report    
 8/17/2006  Permit Condition Or Consent Order/Response Due   Topo Surveys & Remaining Capacity Calculations  
 8/17/2006  Permit Condition Or Consent Order/Response Due    
 8/17/2006  Permit Condition Or Consent Order/Response Due    
 8/17/2006  Permit Condition Or Consent Order/Response Due    
 8/17/2006  Permit Condition Or Consent Order/Response Due    
 8/17/2006  Permit Condition Or Consent Order/Response Due   Topo Surveys & Remaining Capacity Calculations  
 8/25/2006  Gas Monitoring Report   Sampled 8/22/06  
 8/25/2006  Financial Assurance Documents   Inflation Adjustment Approved, Sgm  
 8/25/2006  Financial Assurance Documents   Inflation Adjusted Approved, Sgm  
 8/28/2006  Financial Assurance Documents   Sgm, 8/28/06, Inf. Adj.  
 10/12/2006  Leachate Report   Quantity  
 10/23/2006  Groundwater Report    
 10/24/2006  Landfill Inspection (Class 1)   Snw | Sjp-Response Ok  
 10/24/2006  Waste Tire Processing Facility Inspection.   Snw | Sjp-Response Ok  
 11/2/2006  Gas Monitoring Report   Sampled 10/26/05  
 11/17/2006  Gas Monitoring Report   Sampled On 11/9/06  
 1/16/2007  Leachate Report   Quantity, Mam  
 1/16/2007  Groundwater Monitoring Report   Sampled 8/14 To 8/20/06 | Exceedances Reported For Ph, Arsenic, Iron, Sodium, Chloride, Tds  
 1/16/2007  Permit Condition Or Consent Order/Response Due   Surface Water Sampled 8/3/06  
 2/6/2007  Waste Tire Processing Facility Inspection.   Snw | Sjp-Response Ok  
 2/6/2007  Landfill Inspection (Class 1)   Snw-Storm Water Management Not Effective | Sjp-Response Ok  
 3/16/2007  Gas Monitoring Report   Mam, No Exceedences  
 4/16/2007  Leachate Report   Quantity, Mam  
 5/15/2007  Waste Tire Processing Facility Report Due    
 5/21/2007  Gas Monitoring Report   Mam, No Exceedences  
 7/5/2007  Monitoring Data Results Reviewed   Gw - 1/15/07 | Aea  
 7/5/2007  Monitoring Data Results Reviewed   Gw - 1/15/06 | Aea  
 7/5/2007  Monitoring Data Results Reviewed   Gw - 7/15/05 | Aea  
 7/5/2007  Monitoring Data Results Reviewed   Gw - 2/16/06 | Aea  
 7/5/2007  Monitoring Data Results Reviewed   Gw - 7/15/06 | Aea  
 7/5/2007  Monitoring Data Results Reviewed   Gw - 1/15/05 | Aea  
 7/17/2007  Waste Tire Processing Facility Report Due   Wqr, Mam  
 7/18/2007  Groundwater Monitoring Report   Sampled 4/24 To 4/29/07 | Exceedances Reported For Ph, Arsenic, Iron, Sodium, Chloride, Tds  
 7/18/2007  Leachate Report   Quality | Ng  
 7/27/2007  Groundwater Monitoring Report   Initial Sampling Event At New Background Well Mw-1r Conducted 5/31/07 | Exceedances Reported For Iron And Tds  
 7/30/2007  Leachate Report   Quantity  
 8/17/2007  Groundwater Report   Time Ext Req Rec'D 6/29/07 From Pbs&J; Original Due Date 2/1/07 - Mam  
 9/12/2007  Financial Assurance Documents   Infl Adj, Mam | Approved 09262007, Mam  
 10/4/2007  Leachate Report   Quantity - Mam  
 10/5/2007  Waste Tire Processing Facility Inspection.    
 10/5/2007  Landfill Inspection (Class 1)   Oil/ Hw Storage And Management Issues, Inadequate Initial Cover And One Area Of Stormwater/Erosion Management Issues | Response Received Addressing The Issues Cited  
 10/17/2007  Gas Monitoring Report   No Exceedences, Mam  
 10/17/2007  Waste Tire Processing Facility Report Due   Mam  
 10/29/2007  Permit Condition Or Consent Order/Response Due   Topo Survey & Remaining Capacity Calculations | Received Following Inspection - Ng  
 1/8/2008  Gas Monitoring Report   12/17/2007 Sampled, Mam  
 1/8/2008  Leachate Report   Quantity | Mam  
 1/15/2008  Leachate Report   Quality, Mam  
 1/15/2008  Groundwater Monitoring Report   Sampled 11/5 To 11/18/07 | Exceedances Reported For Ph, Arsenic, Iron, Tds  
 1/15/2008  Permit Condition Or Consent Order/Response Due   Surface Water | Mam  
 1/16/2008  Waste Tire Processing Facility Report Due   Mam  
 2/14/2008  Monitoring Data Results Reviewed   Gw - 7/27/07 | Jrm  
 2/14/2008  Monitoring Data Results Reviewed   Gw - 7/15/07 | Jrm  
 4/15/2008  Waste Tire Processing Facility Report Due   Mam  
 4/15/2008  Leachate Report   Quantity | Mam  
 4/30/2008  Landfill Inspection (Class 1)   Minor Erosion, Special Waste Management, Groundwater Exceedences, Gas Monitoring, Mam  
 4/30/2008  Gas Monitoring Report   Rcvd During Inspection, All Pts 0, Mam  
 4/30/2008  Waste Tire Processing Facility Inspection.   In Compliance, Mam  
 6/20/2008  Site Inspection   Recyling Operations Checksheet Intentionally Marked All N/A, Please See Waste Processing Facility Form. | The Drain In The Containment Where The New Forcemain Black-Flow Preventor Overflows Needs To Cleaned On A Regular Schedule To Promote Drainage B  
 7/15/2008  Enforcement Tracking    1348
 7/15/2008  Enforcement Referral   Closed  
 9/29/2008  Site Inspection   Recycling Checksheet Intentionally Marked All Na, See Wpf. | During The Inspection, Dep Staff Observed Leachate Dripping From The Load Out Hose Into The Driveway Containment. Facility Staff Had Recently Pumped A Load Into The Water Truck For Dust Con  
 10/8/2008  Consent Order    1348
 11/5/2008  Penalty    1348
 3/25/2009  Waste Quantity Report    
 3/25/2009  Leachate Report    
 3/25/2009  Leachate Report    
 3/25/2009  Waste Quantity Report    
 3/25/2009  Waste Quantity Report    
 3/25/2009  Gas Monitoring Report    
 3/25/2009  Waste Quantity Report    
 3/25/2009  Waste Quantity Report    
 3/25/2009  Gas Monitoring Report    
 3/25/2009  Leachate Report    
 3/25/2009  Waste Quantity Report    
 3/25/2009  Gas Monitoring Report    
 3/26/2009  Site Inspection   A Used Oil Filter Storage Container Was Located At The Veolia Maintenance Facility Without A Lid. Used Oil Filters Were Stored Inside The Container. Please Keep A Lid On This Container At All Times. | 1.1, 2.15 - Facility Is Currently Filling In Be  
 4/2/2009  Groundwater Monitoring Report    
 4/2/2009  Letter    
 4/2/2009  Submittal Received By Department    
 6/17/2009  Submittal Received By Department    
 6/17/2009  Site Inspection   During The Inspection, Department Staff Observed Construction Activities For Phase Ii. They Are Currently In Various Stages Of Laying Liner Across The Four Cells. | The Facility Recently Re-Graded The Scrap Metal Area. Some Small Pieces Of Plastic, M  
 6/22/2009  Submittal Received By Department    
 6/22/2009  Waste Quantity Report    
 6/22/2009  Gas Monitoring Report    
 6/22/2009  Waste Quantity Report    
 6/22/2009  Groundwater Monitoring Report    
 6/22/2009  Leachate Report    
 7/1/2009  Submittal Received By Department    
 9/25/2009  Site Inspection   4.13 - Marked Unknown, Did Not Check | 9.13 - The Facility Last Had The Wt Area Inspected On 09/25/2008 (1 Year Ago Today) And Indicated That The Fire Department Had Been Contacted And Was Scheduled To Visit The Site Before The End Of The Month. Ple  
 10/8/2009  Gas Monitoring Report    
 10/8/2009  Leachate Report    
 10/8/2009  Monitoring Data Results    
 10/8/2009  Groundwater Monitoring Report    
 10/8/2009  Leachate Report    
 10/8/2009  Waste Quantity Report    
 10/8/2009  Waste Quantity Report    
 12/28/2009  Submittal Received By Department    
 12/28/2009  Financial Assurance Documents    
 2/3/2010  Site Inspection   2.20 - A Small Area Of Exposed Waste Was Observed In An Outside Berm On The E Slope. This Area Was Repaired During The Inspection. | 2.22 - Minor Blowing Litter Was Observed S Of The Working Face. Strong Winds Were Observed During The Inspection. | 2  
 2/8/2010  Groundwater Monitoring Report    
 2/8/2010  Waste Quantity Report    
 2/8/2010  Waste Quantity Report    
 2/8/2010  Submittal Received By Department    
 2/8/2010  Waste Quantity Report    
 2/8/2010  Leachate Report    
 2/8/2010  Gas Monitoring Report    
 2/8/2010  Waste Quantity Report    
 2/8/2010  Waste Quantity Report    
 2/8/2010  Submittal Received By Department    
 2/8/2010  Gas Monitoring Report    
 2/8/2010  Leachate Report    
 2/8/2010  Leachate Report    
 3/22/2010  Financial Assurance Documents    
 6/1/2010  Waste Tire Collector Registration - Incoming    
 6/1/2010  Leachate Report    
 6/2/2010  Site Inspection   Department Staff Observed A Water Main Being Installed Along The Entrance Roadway. During The Inspection, Operator Indicated They This Water Main Closely Parallels The County'S Leachate Forcemain And That Due To Concern About Damage To The Line, The  
 6/3/2010  Submittal Received By Department    
 6/3/2010  Leachate Report    
 6/3/2010  Submittal Received By Department    
 6/3/2010  Waste Quantity Report    
 6/3/2010  Registered Source-Separated Organics (Sopf) - Incoming    
 6/3/2010  Submittal Received By Department    
 6/3/2010  Submittal Received By Department    
 6/9/2010  Groundwater Monitoring Report    
 6/9/2010  Groundwater Monitoring Report    
 8/6/2010  Groundwater Monitoring Report    
 8/6/2010  Leachate Report    
 8/6/2010  Groundwater Monitoring Report    
 8/16/2010  Groundwater Monitoring Report    
 8/20/2010  Groundwater Monitoring Report    
 8/22/2010  Groundwater Monitoring Report    
 8/30/2010  Leachate Report    
 8/30/2010  Leachate Report    
 8/30/2010  Leachate Report    
 8/30/2010  Leachate Report    
 8/30/2010  Leachate Report    
 8/30/2010  Leachate Report    
 9/2/2010  Leachate Report    
 9/2/2010  Groundwater Monitoring Report    
 9/2/2010  Groundwater Monitoring Report    
 9/3/2010  Groundwater Monitoring Report    
 9/3/2010  Groundwater Monitoring Report    
 9/3/2010  Groundwater Monitoring Report    
 9/3/2010  Groundwater Monitoring Report    
 9/3/2010  Groundwater Monitoring Report    
 9/3/2010  Groundwater Monitoring Report    
 9/14/2010  Submittal Received By Department    
 9/14/2010  Gas Monitoring Report    
 9/16/2010  Site Inspection   Item 1.1, 2.13, 2.16, 2.21, 2.29 - Permit Drawings For Phase I Indicate That A Permanent Access Road Would Be Constructed Along The South Slope During The Latter Sequences Of Fill. Based On A File Review And Observations Made During The Inspection, I  
 10/12/2010  Meeting    1348
 2/16/2011  Site Inspection   Item 1.7 - Gw Results Pending Department Review. Item 1.9 - Status Of Funding Unknown, Tallahassee Item 1.12 - Status Unknown, Mailed To Tallahassee, Did Not Check Item 2.37 - Did Not Observe All Wells During Inspection Item 4.9 - Departm  
 4/19/2011  Gas Monitoring Report    
 4/19/2011  Gas Monitoring Report    
 4/27/2011  Groundwater Monitoring Report    
 4/27/2011  Leachate Report    
 4/27/2011  Groundwater Monitoring Report    
 5/13/2011  Financial Assurance Documents    
 5/17/2011  Gas Monitoring Report    
 5/26/2011  Site Inspection   Item 1.7 - Gw Results Pending Review Item 1.9 - Financial Mechanism Pending Tal Review Item 1.12 - Sent To Tal, Did Not Check Status Item 2.37 - Did Not Visit All Wells Item 4.9 - The Recent Repair To The N Trench Drain At The Mrf Appears  
 6/29/2011  Meeting    1348
 6/29/2011  Contamination Assessment Report    1348
 6/29/2011  Contamination Assessment Plan    1348
 6/29/2011  Contamination Assessment Report    1348
 9/21/2011  Site Inspection   Item 1.7 - Gw Results Pending Dept Review Item 1.9 - Processed By Fin Coordinator In Tal, Did Not Check Item 1.12 - Sent To Tal, Did Not Check Status. Note, Future Annual Reports Can Be Submitted Electronicially Using Dep Portal. Item 2.22 -  
 9/26/2011  Gas Monitoring Report    
 1/24/2012  Gas Monitoring Report    
 1/24/2012  Gas Monitoring Report    
 1/25/2012  Site Inspection   Item 1.1, 2.13 - Facility Was Filling In Cell 1, Lift 2 (To Elev. 50) During The Inspection. The Working Face Was Located At The N End Of Cell 1, With Fill Progression Toward The S. It Appeared That The Facility Was Filling Lift 2 In The Opposite  
 5/27/2012  Cost Estimates    
 6/6/2012  Gas Monitoring Report    
 6/13/2012  Site Inspection   Item 1.7 - Gw Results Not Reviewed As Part Of This Inspection Item 1.12 - Sent To Tallahassee, Did Not Check Status Item 2.22 - During The Inspection, Department Staff Observed A Temporary Trash Pump Being Utilized To Pump Leachate From The Pha  
 7/27/2012  Cost Estimates    
 9/5/2012  Gas Monitoring Report    
 9/6/2012  Site Inspection   Item 1.7 - Gw Results Not Evaluated As Part Of This Inspection Item 2.13 - During The Inspection, The Working Face Was Located In Phase Ii, Cell Ii. The Operator Was Placing A 4'+ Select Waste Layer And Normal ~10' Lift Concurrently. A Spotter Was  
 9/11/2012  Groundwater Monitoring Report    
 1/10/2013  Waste Quantity Report    
 1/10/2013  Waste Quantity Report    
 1/14/2013  Gas Monitoring Report    
 1/16/2013  Waste Quantity Report    
 1/16/2013  Waste Quantity Report    
 1/29/2013  Waste Quantity Report    
 2/13/2013  Cost Estimates    
 4/2/2013  Gas Monitoring Report    
 4/11/2013  Leachate Report    
 5/17/2013  Technical Review    
 6/20/2013  Site Inspection   I Performed A Compliance Assurance Inspection At The Class I Facility, Material Recovery Facility (Class Iii And C&D), Waste Tire Facility, And Separated Organics Processing Facility (Sopf) On 6/20/2013. The Class I Facility Operates Under Permit  
 6/25/2013  Phone Conversation    
 7/15/2013  Groundwater Monitoring Report    
 1/22/2014  Groundwater Report    
 3/13/2014  Site Inspection   I Performed A Compliance Assurance Inspection At The Class I Facility, Material Recovery Facility (Class Iii And C&D), Waste Tire Facility, And Separated Organics Processing Facility (Sopf) On 3/13/2014. The Class I Facility Operates Under Permit  
 4/23/2014  Technical Review    
 6/12/2014  Site Inspection   I Performed A Compliance Inspection At The Class I Facility, Material Recovery Facility (Class Iii And C&D), Waste Tire Collection Center, And Separated Organics Processing Facility. The Class I Facility Operates Under Permit No. 0130542-022-So/01  
 8/19/2014  Groundwater Monitoring Report    
 1/15/2015  Waste Quantity Report    
 1/28/2015  Cost Estimates    
 2/23/2015  Groundwater Monitoring Report    
 4/1/2015  Gas Monitoring Report    
 4/6/2015  Submittal Received By Department   Placed In Oculus.  
 4/21/2015  Letter    
 4/21/2015  Letter    
 5/13/2015  Submittal Received By Department    
 6/18/2015  Site Inspection   A Routine Inspection Was Performed At The Class I Facility, Waste Processing (Class Iii And C&D), Waste Tire Collection Center, Gas To Energy, And Separated Organics Processing Facility On June 18, 2015. All Five Facilities Were In Compliance At The  
 7/1/2015  Gas Monitoring Report    
 7/31/2015  Groundwater Monitoring Report    
 8/3/2015  Groundwater Monitoring Report    
 10/6/2015  Gas Monitoring Report    
 10/22/2015  Letter    
 11/12/2015  Waste Quantity Report    
 12/16/2015  Groundwater Report    
 1/6/2016  Gas Monitoring Report    
 1/7/2016  Cost Estimates    
 1/21/2016  Waste Quantity Report    
 2/4/2016  Groundwater Monitoring Report    
 4/7/2016  Gas Monitoring Report    
 4/15/2016  Submittal Received By Department    
 4/18/2016  Waste Quantity Report    
 4/18/2016  Submittal Received By Department    
 6/30/2016  Site Inspection   July 5, 2016 A Routine Operations Inspection Was Conducted Of The Waste Tire Processing Area Of The Sarasota Central County Landfill On June 30, 2016. The Class I Disposal Facility Operates Under Permit Number, 0130542-022-So/01, Issued On Janu  
 7/13/2016  Site Inspection   On July 13, 2016, An Annual Operations Inspection Was Conducted At This Facility. Item 2.6 - At The Time Of The Evaluation, The Facility Was Initiating Removal Of All Electrical Wastes (E-Wastes - Computer Processing Units And Associated Equipment)  
 1/26/2017  Electronic Communication    
 3/27/2017  Electronic Communication    
 4/3/2017  Electronic Communication    
 6/14/2017  Electronic Communication    
 7/17/2017  Waste Quantity Report    
 8/31/2017  Site Inspection   On June 7, 2017, The Facility Received 3" Of Rain In Less Than Two Hours. During The Rain Event, A Pump In The Leachate Collection System Within Cell 3 Failed. This Failure, Combined With The Heavy Rain Event, Caused A Leachate/Stormwater Mixture T  
 1/22/2018  Electronic Communication    
 1/22/2018  Electronic Communication    
 2/7/2018  Waste Quantity Report    
 2/9/2018  Waste Quantity Report    
 2/12/2018  Gas Monitoring Report    
 2/13/2018  Groundwater Monitoring Report    
 2/28/2018  Site Inspection   On Sunday February 25, 2018, A Fire Was Reported In The Separated Source Organic Staging And Processing Area Of The Facility. It Was Immediately Reported To Fdep. On Wednesday February 28, 2018, A Follow Up Site Inspection Was Conducted. The Cause  
 4/11/2018  Submittal Received By Department    
 5/17/2018  Gas Monitoring Report    
 6/14/2018  Site Inspection   An Annual Routine Inspection Was Conducted At The Class I Landfill, C&D Material Recovery Facility, And Waste Tire Collection Area. The Annual Operations Inspection For The Source Separated Organics Processing Facility (Sopf) Was Conducted On Febru  
 6/28/2018  Groundwater Monitoring Report    
 6/28/2018  Groundwater Report    
 7/11/2018  Waste Quantity Report    
 7/11/2018  Gas Monitoring Report    
 7/12/2018  Groundwater Monitoring Report    
 7/30/2018  Waste Quantity Report    
 10/29/2018  Waste Quantity Report    
 11/6/2018  Submittal Received By Department    
 1/9/2019  Waste Quantity Report    
 1/14/2019  Gas Monitoring Report    
 1/31/2019  Cost Estimates    
 2/11/2019  Leachate Report    
 3/14/2019  Site Inspection   Dep Staff Conducted A Routine Annual Operations Inspection On March 14, 2019 At The Sarasota Central Landfill Complex With The Landfill Operations Manager. The Class I Landfill, Waste Processing Facility, And The Registered Source-Separated Organics  
 3/19/2019  Gas Monitoring Report    
 4/2/2019  Cost Estimates    
 4/15/2019  Letter    
 4/22/2019  Waste Quantity Report    
 7/24/2019  Site Inspection   On July 24, 2019, A Routine Operations Inspection Was Conducted At The Sarasota Central County Landfill Facility. Waste Tires Are No Longer Processed At The Facility. All Waste Tires Are Picked Up By Liberty Tire Recycling, Llc (Liberty), Melbourne  
 7/24/2019  Waste Quantity Report    

Violation History

Vio# Area Regulation Opened
By
Date
Determined
Completed ETA Act Act Date Regulation Text Excerpt   (mouse over for more text)
   62-701.510(3), 62-701.510(4)  Madden_M  6/19/2008  3/31/2009    1052 6/19/2008   Ground water monitoring., Surface water monitoring.
AOC    62-701.300(4), 62-701.300(5), 62-701.300(6), 62-701.300(8)(a), 62-701.300(8)(c), 62-701.300(8)(d), 62-701.300(8)(e), 62-701.300(9), 62-701.300(10), 62-701.300(11)(a), 62-701.300(11)(b)  Madden_M  6/20/2008  9/29/2008    1052 6/20/2008   Hazardous waste. No hazardous waste shall be disposed of in a solid waste management facility unless such facility is permitted pursuant to Chapter 62-730, F.A.C., PCBs. Disposal of liquids containing a polychlorinated biphenyl (PCB), or non-liquid P
AOC    62-701.300(4), 62-701.300(5), 62-701.300(6), 62-701.300(8)(a), 62-701.300(8)(c), 62-701.300(8)(d), 62-701.300(8)(e), 62-701.300(9), 62-701.300(10), 62-701.300(11)(a), 62-701.300(11)(b)  Madden_M  6/20/2008  10/2/2008    1052 6/20/2008   Hazardous waste. No hazardous waste shall be disposed of in a solid waste management facility unless such facility is permitted pursuant to Chapter 62-730, F.A.C., PCBs. Disposal of liquids containing a polychlorinated biphenyl (PCB), or non-liquid P
AOC    62-701.500(7)(e)  Madden_M  6/20/2008  9/29/2008    1052 6/20/2008   Initial cover shall be applied and maintained at landfills in order to minimize any adverse environmental, safety, or health effects such as those resulting from birds, unauthorized wastes, blowing litter, odors, disease vectors, or fires. The minimu
AOC    62-701.500(10)  Madden_M  6/25/2008  9/29/2008    1052 6/25/2008   Stormwater system management. Stormwater management systems shall be operated and maintained as necessary to meet the requirements of subsection 62-701.400(9), F.A.C.
AOC    62-701.500(7)(f)  Madden_M  6/25/2008  9/29/2008    1052 6/25/2008   An intermediate cover in addition to the six-inch initial cover shall be applied and maintained within seven days of cell completion if additional solid waste will not be deposited within 180 days of cell completion. The landfill operator may remove
AOC    62-701.300(4), 62-701.300(5), 62-701.300(6), 62-701.300(8)(a), 62-701.300(8)(c), 62-701.300(8)(d), 62-701.300(8)(e), 62-701.300(9), 62-701.300(10), 62-701.300(11)(a), 62-701.300(11)(b)  Madden_M  7/2/2008  10/7/2008    1052 7/2/2008   Hazardous waste. No hazardous waste shall be disposed of in a solid waste management facility unless such facility is permitted pursuant to Chapter 62-730, F.A.C., PCBs. Disposal of liquids containing a polychlorinated biphenyl (PCB), or non-liquid P
AOC    62-701.320(1)  Madden_M  7/2/2008  9/29/2008    1052 7/2/2008   Permit requirements. Except as otherwise provided in this chapter, no solid waste management facility shall be constructed, operated, maintained, modified, or closed without a permit issued by the Department, or by an approved local program acting un
AOC    62-701.320(1)  Madden_M  7/2/2008  10/1/2008    1052 7/2/2008   Permit requirements. Except as otherwise provided in this chapter, no solid waste management facility shall be constructed, operated, maintained, modified, or closed without a permit issued by the Department, or by an approved local program acting un
AOC    62-701.500(7)(c)  Madden_M  7/2/2008  9/29/2008    1052 7/2/2008   Solid waste shall be formed into cells to construct horizontal lifts. The working face of the cell, and side grades above land surface, shall be at a slope no greater than three feet horizontal to one foot vertical rise. Lift depth should normally no
AOC    62-709.320(4)(a)3.b.  Madden_M  7/2/2008  9/29/2008    1052 7/2/2008   There shall be interior lanes at least 15 feet wide; and
AOC    62-701.300(4), 62-701.300(5), 62-701.300(6), 62-701.300(8)(a), 62-701.300(8)(c), 62-701.300(8)(d), 62-701.300(8)(e), 62-701.300(9), 62-701.300(10), 62-701.300(11)(a), 62-701.300(11)(b)  Madden_M  9/29/2008  3/26/2009    8000000000004 9/29/2008   Hazardous waste. No hazardous waste shall be disposed of in a solid waste management facility unless such facility is permitted pursuant to Chapter 62-730, F.A.C., PCBs. Disposal of liquids containing a polychlorinated biphenyl (PCB), or non-liquid P
   62-701.300(4), 62-701.300(5), 62-701.300(6), 62-701.300(8)(a), 62-701.300(8)(c), 62-701.300(8)(d), 62-701.300(8)(e), 62-701.300(9), 62-701.300(10), 62-701.300(11)(a), 62-701.300(11)(b)  Madden_M  9/29/2008  3/26/2009    8000000000004 9/29/2008   Hazardous waste. No hazardous waste shall be disposed of in a solid waste management facility unless such facility is permitted pursuant to Chapter 62-730, F.A.C., PCBs. Disposal of liquids containing a polychlorinated biphenyl (PCB), or non-liquid P
AOC    62-701.320(1)  Madden_M  10/7/2008  3/26/2009    8000000000004 10/7/2008   Permit requirements. Except as otherwise provided in this chapter, no solid waste management facility shall be constructed, operated, maintained, modified, or closed without a permit issued by the Department, or by an approved local program acting un
AOC    62-701.320(1)  Madden_M  3/26/2009  6/17/2009    8000000000020 3/26/2009   Permit requirements. Except as otherwise provided in this chapter, no solid waste management facility shall be constructed, operated, maintained, modified, or closed without a permit issued by the Department, or by an approved local program acting un
AOC    62-701.320(1)  Madden_M  3/26/2009  6/17/2009    8000000000020 3/26/2009   Permit requirements. Except as otherwise provided in this chapter, no solid waste management facility shall be constructed, operated, maintained, modified, or closed without a permit issued by the Department, or by an approved local program acting un
AOC    62-701.500(7)(e)  Madden_M  3/26/2009  6/17/2009    8000000000020 3/26/2009   Initial cover shall be applied and maintained at landfills in order to minimize any adverse environmental, safety, or health effects such as those resulting from birds, unauthorized wastes, blowing litter, odors, disease vectors, or fires. The minimu
AOC    62-701.710(3)(b)  Madden_M  3/26/2009  6/17/2009    8000000000020 3/26/2009   The facility shall be designed with a leachate control system to prevent discharge of leachate and mixing of leachate with stormwater, and to minimize the presence of standing water.
AOC    62-701.710(4)(b)  Madden_M  3/26/2009  7/1/2009    8000000000020 3/26/2009   Stored putrescible wastes shall not be allowed to remain unprocessed for more than 48 hours; however, if the operation plan includes provisions to control vectors and odors, putrescible wastes may be stored for up to seven days. Areas where waste is
AOC    62-701.710(4)(c)2.  Madden_M  3/26/2009  6/17/2009    8000000000020 3/26/2009   At least one trained spotter shall be on duty at all times that waste is received at the site to inspect the incoming waste. Any prohibited material shall be removed from the waste stream and placed into appropriate containers for disposal at a permi
AOC    62-701.320(1)  Madden_M  6/17/2009  7/1/2009    8000000000026 6/17/2009   Permit requirements. Except as otherwise provided in this chapter, no solid waste management facility shall be constructed, operated, maintained, modified, or closed without a permit issued by the Department, or by an approved local program acting un
   62-701.500(7)(e)  Madden_M  6/17/2009  7/1/2009    8000000000026 6/17/2009   Initial cover shall be applied and maintained at landfills in order to minimize any adverse environmental, safety, or health effects such as those resulting from birds, unauthorized wastes, blowing litter, odors, disease vectors, or fires. The minimu
AOC    62-701.320(1)  Madden_M  9/25/2009  12/28/2009    8000000000031 9/25/2009   Permit requirements. Except as otherwise provided in this chapter, no solid waste management facility shall be constructed, operated, maintained, modified, or closed without a permit issued by the Department, or by an approved local program acting un
AOC    62-701.320(15)(a), 62-701.500(2), 62-701.500(3), 62-701.500(4), 62-701.500(6)(a), 62-701.500(8)(f), 62-701.500(8)(g)  Madden_M  9/25/2009  12/28/2009    8000000000031 9/25/2009   Owners and operators of facilities shall ensure that operators employed at the facility are properly trained to operate the facility, and that spotters are properly trained to identify and properly manage any hazardous or prohibited materials which a
AOC    62-701.500(10)  Madden_M  9/25/2009  12/28/2009    8000000000031 9/25/2009   Stormwater system management. Stormwater management systems shall be operated and maintained as necessary to meet the requirements of subsection 62-701.400(9), F.A.C.
AOC    62-701.300(4), 62-701.300(5), 62-701.300(6), 62-701.300(8)(a), 62-701.300(8)(c), 62-701.300(8)(d), 62-701.300(8)(e), 62-701.300(10), 62-701.300(11)(a), 62-701.300(11)(b), 62-701.300(14), 62-701.520(3), 62-701.730(19)  Madden_M  6/20/2010  9/14/2010    8942 6/20/2010   Hazardous waste. No hazardous waste shall be disposed of in a solid waste management facility unless such facility is permitted pursuant to Chapter 62-730, F.A.C., PCBs. Disposal of liquids containing a polychlorinated biphenyl (PCB), or non-liquid P
AOC    62-701.320(1), 403.161  Madden_M  6/20/2010  9/14/2010    8942 6/20/2010   Permit requirements. Except as otherwise provided in this chapter, no solid waste management facility shall be constructed, operated, maintained, modified, or closed without a permit issued by the Department, or by an approved local program acting un
AOC    62-701.300(4), 62-701.300(5), 62-701.300(6), 62-701.300(8)(a), 62-701.300(8)(c), 62-701.300(8)(d), 62-701.300(8)(e), 62-701.300(10), 62-701.300(11)(a), 62-701.300(11)(b), 62-701.300(14), 62-701.520(3), 62-701.520(5)(a), 62-701.520(5)(b), 62-701.730(19), 62-701.520(5)(c)  Madden_M  4/12/2011  7/13/2011    12437 4/12/2011   Hazardous waste. No hazardous waste shall be disposed of in a solid waste management facility unless such facility is permitted pursuant to Chapter 62-730, F.A.C., PCBs. Disposal of liquids containing a polychlorinated biphenyl (PCB), or non-liquid P
AOC    62-701.320(1), 403.161  Madden_M  4/12/2011  7/13/2011    12437 4/12/2011   Permit requirements. Except as otherwise provided in this chapter, no solid waste management facility shall be constructed, operated, maintained, modified, or closed without a permit issued by the Department, or by an approved local program acting un
AOC    62-701.500(2)(j), 62-701.500(8)(b), 62-701.500(8)(h)  Roudebush_R  10/6/2017  4/25/2018    174062 10/6/2017   Maintaining and cleaning the leachate collection system., The landfill operator is responsible for the operation of the leachate collection and removal system and for maintaining the system as designed for the design period. Leachate shall be collect
AOC    62-709.320(2)(e)1.  Kwiat_R  3/1/2018  6/20/2018    175881 3/1/2018   Any yard trash, including clean wood, received at the facility shall be size-reduced or removed within 6 months, or within the period required to receive 3,000 tons or 12,000 cubic yards, whichever is greater. However, logs with a diameter of 6 inche