Activity and Violation History

Florida Department of Environmental Protection

Solid Waste Facility Compliance History



Activity History for:

FACID: 45799, PASCO COUNTY RESOURCE RECOVERY

Note: ETA links to Enforcement Tracking Activity

Date Done Activity Type Activity Comments   (mouse over for more text) ETA Link
 2/3/1994  Class Iii Landfill Inspection.    
 5/19/1994  Class Iii Landfill Inspection.    
 3/6/1995  Permit Condition Or Consent Order/Response Due   Evaluation Of Gwm Plan  
 3/17/1995  Permit Condition Or Consent Order/Response Due   Apply For Permit Renewal  
 4/7/1995  Compliance Evaluation Inspection   Ford, Amram  
 6/28/1995  Permit Condition Or Consent Order/Response Due   Gwm Results  
 1/22/1996  Leachate Report    
 1/24/1996  Waste Quantity Report   Revised  
 4/10/1996  Landfill Inspection (Class 3)   Ford, Amram; No Spotter, Inadequate Barriers/Signs  
 6/7/1996  Landfill Inspection (Class 3)   No Spotter, Scalehouse; Ford, Morgan, Nichols  
 6/7/1996  Landfill Inspection (Class 1)   Ford, Morgan, Nichols; Sw-1 And A-1  
 6/7/1996  Waste Tire Processing Facility Inspection.   Ford, Morgan, Nichols  
 6/19/1996  Groundwater Monitoring Report    
 7/29/1996  Groundwater Monitoring Report    
 10/4/1996  Groundwater Monitoring Report    
 10/15/1996  Landfill Inspection (Class 3)   Nichols, Latorre  
 10/15/1996  Compliance W/O Formal Enforcement Action   Spotter Present During This Inspection; Note Significant Quantity Of "Storm Debris" Incl. Class I Observed On Pad Outside Liner  
 10/15/1996  Landfill Inspection (Class 1)   Nichols, Latorre; Not Covering At All; Not Operating In Accordance With Plan (Mixing Ash And Msw), Leachate Ponded In Cell, Etc.  
 11/7/1996  Warning Letter Issued   No Cover, Ponded Leachate, Disposal Of Ash In Sw-1; Penalty $12,500 | Rec'D Written Response To Wl  
 12/6/1996  Enforcement Meeting   Morgan, Nichols, Butera, Ford, Bramlett, Gallagher, Mannella  
 12/11/1996  Interim Remedial Action   Revised Operations Plan To Address Removal Of Waste From Sw-1  
 12/11/1996  Letter   Request Penalty Of $10k; Submit Proposal For In-Kind | Rec'D Fax From J. Gallagher Disputing Penalty  
 12/27/1996  Follow Up Inspection   Nichols; Observed Some Of Corrective Actions For Ponded Leachate  
 1/14/1997  Letter   Still Have Not Rec'D Proposal For In-Kind  
 1/16/1997  Permit Condition Or Consent Order/Response Due   Operational Records  
 1/16/1997  Waste Tire Processing Facility Report Due    
 2/18/1997  Landfill Inspection (Class 1)   Nichols; Not Currently Using Sw-1, Refused Load Checking Records For Wte, Apparently None Maintained For Cls I  
 2/18/1997  Landfill Inspection (Class 3)   Nichols; Spotter Walking Up As I Arrived, Loads Were Already Being Dumped  
 3/12/1997  Letter   From Garrity To Gallagher--Request Proposal For In-Kind (1.5 X $10k)  
 3/21/1997  Leachate Report   Leachate Monitoring (Not Received)  
 3/21/1997  Groundwater Monitoring Report   Not Received  
 3/21/1997  Gas Monitoring Report   Not Received  
 3/21/1997  Comprehensive Quality Assurance Plan   Water Quality Qap Documentation (Not Received)  
 5/16/1997  Groundwater Monitoring Report    
 6/16/1997  Permit Condition Or Consent Order/Response Due   Certification And Drawings  
 6/17/1997  Waste Tire Processing Facility Report Due    
 6/20/1997  Leachate Report    
 6/27/1997  Landfill Inspection (Class 1)    
 6/27/1997  Leachate Report   Lechate Monitoring  
 6/27/1997  Landfill Inspection (Class 3)    
 6/27/1997  Waste Tire Processing Facility Inspection.   Morgan  
 7/14/1997  Waste Tire Processing Facility Report Due   Operational Records  
 7/18/1997  Financial Assurance Documents   Financial Assurance Cost Ests-Pelz-Ests Approved 7-30-97  
 7/30/1997  Financial Assurance Documents   Comp. Date Is Date Ce'S Were Approved  
 9/2/1997  Financial Assurance Documents   Pelz-Infl Adj Ests Rec'D; Approved 9-29-97  
 10/7/1997  Leachate Report   Leachate Quality  
 10/8/1997  Landfill Inspection (Class 1)   Leachate Lake In A-2  
 10/8/1997  Landfill Inspection (Class 1)   Leachate Lake In A-2  
 10/8/1997  Landfill Inspection (Class 3)    
 10/15/1997  Waste Tire Processing Facility Report Due   Operational Records  
 10/21/1997  Waste Tire Processing Facility Inspection.   Morgan  
 11/18/1997  Enforcement Project Initiated   Warning Letter #97-0008sw51swd - Project #  
 11/18/1997  Warning Letter Issued    
 11/21/1997  Groundwater Monitoring Report    
 11/21/1997  Groundwater Monitoring Report    
 12/11/1997  Enforcement Meeting    
 1/20/1998  Waste Tire Processing Facility Report Due    
 1/20/1998  Letter   Ltr From Rdg To Bramlett  
 3/11/1998  Gas Monitoring Report   Never Received  
 3/11/1998  Gas Monitoring Report   Never Received  
 3/11/1998  Waste Tire Processing Facility Inspection.   Morgan, Butera, Ford  
 3/11/1998  Gas Monitoring Report   Never Received  
 3/11/1998  Landfill Inspection (Class 1)   Morgan, Butera, Ford  
 3/11/1998  Landfill Inspection (Class 3)   Morgan, Butera, Ford  
 3/24/1998  Letter   Letter From County Outlining Plan For Corrective Actions  
 4/17/1998  Waste Tire Processing Facility Report Due    
 4/21/1998  Waste Tire Processing Facility Inspection.   Nichols  
 4/21/1998  Landfill Inspection (Class 1)   Nichols  
 4/21/1998  Landfill Inspection (Class 3)   Nichols  
 7/8/1998  Letter   Letter Informing Department Of Return To Compliance  
 7/14/1998  Waste Tire Processing Facility Report Due    
 7/15/1998  Leachate Report   Leachate Monitoring  
 7/15/1998  Groundwater Monitoring Report    
 7/20/1998  Financial Assurance Documents   Pelz-Infl Adj Ests Approved 7-30-98; Funding Ok 6-16-99  
 7/20/1998  Financial Assurance Documents   Pelz-Infl. Adj Ests Rec'D; Approved 7-30-98;Funding Ok 6-16-99  
 7/20/1998  Financial Assurance Documents   Approved S. Pelz July 30, 1998  
 9/1/1998  Follow Up Inspection   Verified Return To Compliance  
 10/15/1998  Landfill Inspection (Class 1)   Nichols;  
 10/15/1998  Landfill Inspection (Class 3)   Nichols; Have Not Submitted Gw Eval. Or Gas Monitoring, Load Checking Not Adequate  
 10/15/1998  Waste Tire Processing Facility Inspection.   Nichols  
 10/16/1998  Waste Tire Processing Facility Report Due    
 10/16/1998  Waste Tire Processing Facility Report Due    
 12/10/1998  Gas Monitoring Report   Morris - Two Locations Sampled 12/7/98. Mon Wells Sampled | 11/16/98. All 0% Lel  
 1/14/1999  Groundwater Report    
 1/14/1999  Groundwater Report   Gw Mon Plan Eval  
 1/14/1999  Groundwater Report   Eval. Of Gwmp  
 1/19/1999  Waste Tire Processing Facility Report Due    
 2/1/1999  Gas Monitoring Report   Qtr 1 1999. Location Sampled 1/25/99.  
 2/2/1999  Landfill Inspection (Class 3)   Nichols; Move Metal In Timely Manner  
 2/2/1999  Landfill Inspection (Class 1)   Nichols; No Gas Monitoring, Still No Approved Fill Seq./Ops Plan  
 2/25/1999  Civil Penalty Authorization Memo   Draft To Ogc  
 3/22/1999  Civil Penalty Authorization Memo   Revised Cpam To Ogc  
 3/23/1999  Leachate Report   Quality Jan/June 1999  
 3/23/1999  Leachate Report   Quality  
 4/12/1999  Gas Monitoring Report   Never Done  
 4/12/1999  Gas Monitoring Report   Never Performed  
 4/12/1999  Gas Monitoring Report   Never Done  
 4/19/1999  Waste Tire Processing Facility Report Due    
 5/17/1999  Groundwater Report   Eval Of Gwmp | Sample Date 1/26/99  
 5/17/1999  Groundwater Monitoring Report   Water Quality- Jan/June 1999  
 5/17/1999  Groundwater Monitoring Report   Water Quality- Jan/June 1999  
 6/17/1999  Gas Monitoring Report   Two Locations Sampled 6/11/99. Both 0% Lel.  
 6/30/1999  Landfill Inspection (Class 1)   Ford, Kim  
 6/30/1999  Landfill Inspection (Class 3)   Ford, Kim  
 7/9/1999  Enforcement Meeting   Meeting W/County To Discuss Civil Penalties  
 7/19/1999  Waste Tire Processing Facility Report Due    
 8/11/1999  Gas Monitoring Report   Two Locations Sampled On 8/6/99, Both 0% Lel.  
 8/17/1999  Financial Assurance Documents   Sjp-Infl Adj Ests; Approved 9-8-99  
 8/17/1999  Financial Assurance Documents   Sjp-Infl Adj Ests;Approved 9-8-99  
 8/26/1999  Financial Assurance Documents   Sjp-Infl Adj Ests; Rai 9-8-99;Approved 10-7-99  
 8/31/1999  Landfill Inspection (Class 3)    
 8/31/1999  Waste Tire Processing Facility Inspection.    
 9/3/1999  Landfill Inspection (Class 1)    
 9/9/1999  Draft Consent Order Issued    
 9/30/1999  Leachate Report   Quality | Morris- Reported App I Parameters For Lt #1,2; Sampled 8/4/99  
 9/30/1999  Leachate Report   Quality; Sample Date 8/5/99, Four Tanks:A-1 Prim, A-1 Sec, | Sw Prim, Sw Sec - Petro; Morris- Reported App I Parameters  
 10/1/1999  Groundwater Monitoring Report   Morris- Dry Wells 2mw-3,2mw-7,4mw-7,2mw-8,2mw-9,2mw-10 | Methylene Chloride Above Gw Std. 4mw-8 And 4mw-9(Det. In Trp Blk)  
 10/1/1999  Groundwater Report   Eval Of Gwmp  
 10/1/1999  Groundwater Monitoring Report   Morris- App. Ii Parameters Reported For 4mw-11d,12d,14d,15d,16d | 4mw-13d Still Not Installed; 4mw-14d High Cl,Tds; 4mw-15d Hi Tds  
 10/14/1999  Waste Tire Processing Facility Report Due    
 11/17/1999  Landfill Inspection (Class 1)   Multiple Operation Deficiencies  
 11/17/1999  Landfill Inspection (Class 1)   Multiple Operation Deficiencies - Morgan  
 11/17/1999  Waste Tire Processing Facility Inspection.   Off Road Tires Not Placed In Designated Area  
 11/17/1999  Landfill Inspection (Class 3)   Slopes Greater Than 3:1 - Petro  
 11/22/1999  Enforcement Project Initiated   Petro  
 11/22/1999  Enforcement Project Initiated    
 11/24/1999  Gas Monitoring Report    
 11/24/1999  Gas Monitoring Report   Morris- 2 Locations Sampled 11/19/99, Both Reported @0% Lel  
 11/26/1999  Monitoring Data Results Reviewed   Gw - 1/15/00  
 12/22/1999  Gas Monitoring Report   Never Done!!!  
 1/18/2000  Non-Compliance Letter Issued    
 1/19/2000  Waste Tire Processing Facility Report Due   3 Feb 2000 Revised Edition Sent In  
 1/31/2000  Draft Consent Order Issued   Revised  
 1/31/2000  Monitoring Data Results Reviewed   Gw - 1/15/00  
 2/23/2000  Letter   From County  
 3/24/2000  Gas Monitoring Report    
 3/27/2000  Gas Monitoring Report   Morris- 2 Locations Sampled 3/21/00, Both Reported @ 0% Lel  
 4/17/2000  Landfill Inspection (Class 1)   Smithee,Morgan  
 4/17/2000  Waste Tire Processing Facility Inspection.   Smithee,Morgan | Sis  
 4/17/2000  Landfill Inspection (Class 3)   Smithee,Morgan  
 4/17/2000  Landfill Inspection (Class 1)   Poor Initial Cover,Filling Out Of Sequence | Smithee,Morgan  
 4/18/2000  Waste Tire Processing Facility Report Due   Sis  
 5/30/2000  Gas Monitoring Report   Morris- 2 Locations Sampled 5/23/00, Both Reported @ 0% Lel  
 6/1/2000  Gas Monitoring Report    
 6/1/2000  Draft Consent Order Issued    
 6/1/2000  Draft Consent Order Issued   Comments On Co & In-Kind Proposals Recd. From County  
 6/21/2000  Leachate Report   Quality | Morris- Reported App Ii Parameters From 4 Locations; Sampled 2/25/00  
 6/26/2000  Letter   Request For Ext. Of Time To Response To Draft Co | Ext. Grnated Until 9/2/00  
 7/7/2000  Leachate Report   Quality | Morris- Reported App Ii Parameters For Lt# 1,2; Sampled 2/25/00  
 7/10/2000  Groundwater Monitoring Report   Morris- Well 4mw-13d Still Not Installed; Elevated Th,Fe,Tds | @4mw-1 Elevated Cl,Tds From Off-Site? Shady Acres Facility?  
 7/10/2000  Groundwater Monitoring Report   Morris- Exceedances Reported For Antimony @ 4mw-3a | Shallow Wells Dry; 4mw-7 Also Dry  
 7/12/2000  Telephone Conversation   R.Butera Informed V.Mannella Of Potential In-Kind Projects  
 7/13/2000  Status Report   Resolution Of This Project Linked W/Project #190310 | See Project #190310 For Case Activities  
 7/14/2000  Waste Tire Processing Facility Report Due   Sis  
 8/3/2000  Financial Assurance Documents    
 8/3/2000  Financial Assurance Documents   Msp:Cost Ests Approved 8-15-00 | Funding Approved 7-13-01  
 8/3/2000  Financial Assurance Documents   Msp:Cost Ests Approved 8-15-00 | Funding Approved 7-13-01  
 8/8/2000  Letter   Ltr From Rjb W/ Suggested In-Kind Projects  
 8/14/2000  Gas Monitoring Report   Sampled 8/4/00  
 8/14/2000  Gas Monitoring Report   Morris- 2 Locations Sampled 8/4/00, Both Reported @ 0% Lel  
 8/24/2000  Leachate Report   Quality | Morris- Reported App I Parameters From 4 Locations; Sampled 7/25/00  
 8/24/2000  Leachate Report   Sampled 7/25/00  
 9/11/2000  Groundwater Monitoring Report   Sampled-7/26/00 | Morris- No Exceedances Reported; Shallow Wells And 4mw-7 Dry  
 9/11/2000  Leachate Report   Quality | Morris- Reported App I Parametrs For Lt# 1,2; Sampled 7/25/00  
 9/18/2000  Landfill Inspection (Class 1)   Sis-No Locks On Gmp Wells  
 9/18/2000  Waste Tire Processing Facility Inspection.   Sis ~1200 Tons On-Site  
 9/18/2000  Landfill Inspection (Class 3)   Sis-Sodding Slopes,Minor Erosion  
 10/2/2000  Groundwater Monitoring Report   Sampled-8/2-4/00 | Morris- Exceedances Reported For Ph,Sb,Pb,Nitrate,Tds  
 10/20/2000  Waste Tire Processing Facility Report Due    
 10/23/2000  Letter   Dep Comments On In-Kind Projects  
 10/24/2000  Monitoring Data Results Reviewed   Gw - 7/15/00  
 10/25/2000  Monitoring Data Results Reviewed   Gw - 7/15/00  
 11/17/2000  Gas Monitoring Report   Morris- 2 Locations Sampled 11/9/00, Both Reported @ 0% Lel  
 11/27/2000  Submittal Received By Department   Revised In-Kind Proposals Submitted  
 12/4/2000  Letter   J.Morris Approval Of Gwmp For Sw-1  
 1/3/2001  Landfill Inspection (Class 3)   Sis-No Longer Just C&D  
 1/3/2001  Landfill Inspection (Class 1)   Sis-Sw1 Initial Cover | Cover  
 1/16/2001  Monitoring Data Results Reviewed   Gw - 1/15/01  
 1/18/2001  Enforcement Meeting   In-Kind Proposed To Be Used W/Other Program Penalties For Adell Gardens Project  
 1/19/2001  Waste Tire Processing Facility Report Due    
 2/5/2001  Submittal Received By Department   Copy Of Ltr From Pasco Co To City Of Npr Re: Adell Gardens Project  
 2/22/2001  Renewal Application Due    
 2/22/2001  Groundwater Report   Eval Of Gwmp  
 2/23/2001  Gas Monitoring Report   Morris- 2 Locations Sampled 2/13/01, Both Reported @ 0% Lel  
 2/23/2001  Gas Monitoring Report   Sampled 2/13/01  
 2/27/2001  Letter   Dep Ltr To City Of Npr Recommending Adell Gardens Project  
 3/30/2001  Monitoring Data Results Reviewed   Gw - 1/15/01  
 4/2/2001  Draft Consent Order Issued   Signed Co Due W/I 30days Of Receipt  
 4/16/2001  Waste Tire Processing Facility Report Due   Stored 2265.37 Tons  
 4/23/2001  Groundwater Monitoring Report   Sampled 2/01 | Morris- Exceedances Reported For Ph,Thallium,Nitrate,Tds  
 5/2/2001  Landfill Inspection (Class 1)   Sis-No Initial Cover | Initial Cover  
 5/2/2001  Waste Tire Processing Facility Inspection.    
 5/2/2001  Landfill Inspection (Class 3)   Sis-Waste Compacted @ End Of Each Day  
 5/8/2001  Consent Order Executed    
 5/8/2001  Consent Order Executed   See Status Report 7/13/00  
 5/14/2001  Leachate Report   Sampled 2/27/01 | Morris- App. Ii Parameters Reported For Lt#1 Fe,Tds,Benzene Exceeded Gw Stds.  
 5/18/2001  Groundwater Report   Eval Of Gwmp  
 5/18/2001  Groundwater Monitoring Report   Morris- Well 4mw-7 And Shallow Wells Dry/Not Sampled;No Gw Exceedances Reported | Sampled 2/20/01  
 5/18/2001  Leachate Report   Sampled 2/27-28/01  
 5/29/2001  Gas Monitoring Report    
 5/29/2001  Gas Monitoring Report    
 6/8/2001  Gas Survey   Implement Gas Monitoring Program - Comply With Plan Thereafter  
 6/8/2001  Groundwater Monitoring System Installation   Initiate Gw Monitoring Plan - Comply With Plan Thereafter  
 7/5/2001  Inkind Project Proposal Received   Submittal Of In-Kind Project Due 7/8  
 7/17/2001  Waste Tire Processing Facility Report Due    
 7/27/2001  Gas Monitoring Report   Sampled 7/18/01  
 7/27/2001  Gas Monitoring Report   Sampled 7/18/01  
 7/30/2001  Financial Assurance Documents   Sjp-Rev Ests;Rai 8-28-01,11-15-01;Approved 2-11-02 | Funding Ok 4-12-02  
 7/30/2001  Financial Assurance Documents   Sjp-Rev Ests;Rai 8-28-01,11-15-01;Approved 2-11-02 | Funding Ok 4/12/02  
 7/31/2001  In-Kind Penalty Authorization Memo   Sent By Domestic Waste  
 8/15/2001  Leachate Report   Sampled 7/24/01 | Morris- 4 Samples Reported For App. I Parameters  
 8/20/2001  Inkind Project Proposal Approved   Food Establishment Sludge Handling Facility  
 8/27/2001  Enforcement Meeting   Dw Met W/Pasco To Discuss In-Kind Project Details | Further Details Expected In 30 Days  
 8/29/2001  Financial Assurance Documents   Sjp-Cost Est Approved 9/26/2001 | Funding: Ok 4/12/02  
 8/31/2001  Monitoring Data Results Reviewed   Gw - 7/15/01  
 9/13/2001  Landfill Inspection (Class 1)   Sis,Cwb;Well Damaged; Housekeeping At Hhw;  
 9/13/2001  Waste Tire Processing Facility Inspection.   Sis,Cwb  
 9/13/2001  Landfill Inspection (Class 3)   Sis,Cwb;  
 9/19/2001  Monitoring Data Results Reviewed   Gw - 7/15/01  
 9/25/2001  Status Report   Discussed Case Status W/T.Gucciardo-Dw  
 9/28/2001  Leachate Report   Sampled 7/17/01 | Morris- 2 Samples Reported For App. I Parameters  
 10/18/2001  Waste Tire Processing Facility Report Due   Cwb-2643.79 Tons On Site  
 10/26/2001  Status Report   Check On Status Of In-Kind Project Proposal | Still Pending  
 11/7/2001  Groundwater Monitoring Report   Sampled 7/17/01; Well 4mw-7 Was Not Sampled | Morris- No Exceedances Reported  
 11/7/2001  Groundwater Monitoring Report   Sampled 7/17/01  
 11/17/2001  Gas Monitoring Report    
 11/28/2001  Gas Monitoring Report   Sampled 11/20/01  
 11/28/2001  Gas Monitoring Report   Sampled 11/20/01  
 11/30/2001  Status Report   Check Status Of In-Kind Proposal  
 11/30/2001  Inkind Project Implemented   Final Approval To Implement In-Kind Project Sent To County | 2 Year Deadline To Complete Project  
 12/18/2001  Site Visit   Sis,Kbf-Sw1,A3 Construction Of Bottom Liner  
 12/18/2001  Site Visit   Sis,Kbf-Review Ops For Renewal  
 12/18/2001  Site Visit   Sis,Kbf-Very Few Tires, Draining Correctly  
 1/4/2002  Permit Condition Or Consent Order/Response Due   Ash Sampling Required By 62-702  
 1/4/2002  Landfill Inspection (Class 3)   Sis-Load Checking Records  
 1/4/2002  Landfill Inspection (Class 1)   Sis  
 1/22/2002  Waste Tire Processing Facility Report Due    
 1/28/2002  Renewal Application Due    
 1/28/2002  Renewal Application Due    
 2/11/2002  Groundwater Monitoring Report   Sampled 10/10-11/01 | Morris- Exceedances Reported For Ph,Antimony,Iron,Thallium,Nitrate,Tds  
 4/3/2002  Gas Monitoring Report   Expansion  
 4/3/2002  Gas Monitoring Report    
 4/25/2002  Waste Tire Processing Facility Report Due   Exceeds Permit  
 5/29/2002  Gas Monitoring Report    
 5/29/2002  Leachate Report    
 5/30/2002  Gas Monitoring Report    
 5/30/2002  Gas Monitoring Report    
 6/7/2002  Compliance Assistance Site Visit   Kbf- New Lined Areas; Cert. Not Received  
 7/2/2002  Monitoring Data Results Reviewed   Gw - 1/15/02  
 7/11/2002  Status Report   Status Report On In-Kind Project Due To Dw On 6/1/02 Overdue | E-Mail To Pasco Co. & City Of Npr Sent By Dw Requesting Status Report  
 7/12/2002  Submittal Received By Department   E-Mail Response From Npr Re: Status Report Referring To Previously Submitted 5/29/02 Letter | E-Mail From Dw To Npr - Letter Is An Inadequate Status Report  
 7/15/2002  Leachate Report   Quality Sampled 5/21/02 | Reviewed 8/2/04 Smc  
 7/16/2002  Submittal Received By Department   Info On Proposed In-Kind Project E-Mailed To Dw On 6/28 Fowarded To Sw  
 7/23/2002  Leachate Report   Sampled 5/21/02 | Morris- 3 Samples Reported For App. Ii Parameters; A-1 Secondary Tank Dry & Not Sampled  
 7/23/2002  Groundwater Monitoring Report   Sampled 5/22/02 | Morris- Exceedances Reported For Iron  
 7/24/2002  Waste Tire Processing Facility Report Due    
 7/30/2002  Landfill Inspection (Class 3)   Llm- Unnacceptable Waste In Working Face  
 7/30/2002  Waste Tire Processing Facility Inspection.   Llm  
 7/30/2002  Landfill Inspection (Class 1)   Llm-Leachate Seeping Out Of Sw-1; Hhw  
 8/2/2002  Groundwater Monitoring Report   Sampled 5/23 To 6/19/02; Included Initial Sampling Event @ 2mw-15d, 4mw-19d & 4mw-20d | Morris- Exceedances Reported For Ph,Iron,Nitrate,Tds  
 8/20/2002  Gas Monitoring Report   Q.3 Needs 2mw-7, 2mw-8 And 2mw-10 Sampled | Operation And Scalehouse Readings Only  
 8/30/2002  Gas Monitoring Report    
 9/6/2002  Financial Assurance Documents   Sjs- Inf Adj Approved 10/3/02 | Funding Ok 5/6/03  
 9/6/2002  Financial Assurance Documents   Sjs- Infl Adjust Approved 10/3/02 | Funding Ok 5/6/03  
 9/9/2002  Leachate Report   Quantity  
 9/9/2002  Leachate Report   Quality Sampled 7/23/02; And Quantity | Reviewed 8/2/04 Smc  
 9/12/2002  Leachate Report   Sampled 7/23/02 Received 9/12/02 | Reviewed 8/30/04 - Smc (A1 Secondary Dry)  
 10/3/2002  Groundwater Monitoring Report   Sampled 8/13/02 | Morris- No Exceedances Reported  
 10/16/2002  Waste Tire Processing Facility Report Due    
 11/13/2002  Gas Monitoring Report    
 11/13/2002  Gas Monitoring Report    
 12/5/2002  Landfill Inspection (Class 3)   Llm  
 12/5/2002  Waste Tire Processing Facility Inspection.   Llm  
 12/5/2002  Landfill Inspection (Class 1)   Leachate Noted In Prior Inspection Was Analyzed And Will Be Reviewed Further By Department Personnel For Final Determination  
 1/10/2003  Monitoring Data Results Reviewed   Gw - 1/15/02  
 1/15/2003  Groundwater Monitoring Report   Sampled 11/7 To 11/14/02; Includes Resampling On 12/2/02 For Hg @ 4mw-4 & 2mw-18d | Exceedances Reported For Ph, Chloride, Tds  
 1/21/2003  Leachate Report    
 1/23/2003  Waste Tire Processing Facility Report Due    
 1/27/2003  Permit Condition Or Consent Order/Response Due   Results Of Quarerly Ash Sampling Analyses Required By Chapter 62-702  
 2/20/2003  Financial Assurance Documents   Sgm-Rai Sent 4/17/03; Approved 5/1/03 | Funding Ok-04/14/04  
 3/25/2003  Leachate Report   Sampled 2/11/03 Recieved 3/25/03 | Reviewed 8/30/04 Smc Appendix Ii Parameters  
 3/25/2003  Leachate Report   Sampled 2/11/03 Received 3/25/03 | Reviewed 8/30/04 Smc. Appendix Ii Parameters  
 3/25/2003  Leachate Report   Quality Sampled 2/11/03 | Reviewed 8/2/04 Smc  
 3/26/2003  Landfill Inspection (Class 3)   Llm - Waste Not Compacted Due To Machinery Failure  
 3/26/2003  Waste Tire Processing Facility Inspection.   Llm  
 3/26/2003  Landfill Inspection (Class 1)   Llm  
 4/7/2003  Leachate Report   Quantity  
 4/7/2003  Leachate Report   Quantity  
 4/11/2003  Waste Quantity Report    
 4/14/2003  Groundwater Monitoring Report   Sampled 2/13/03 | Exceedances Reported For Iron  
 4/17/2003  Waste Tire Processing Facility Report Due    
 4/18/2003  Status Report   Msp  
 4/29/2003  Gas Monitoring Report    
 4/29/2003  Gas Monitoring Report    
 6/5/2003  Status Report   Msp - June 2003 Status Report, In-Kind Penalty Project  
 6/30/2003  Gas Monitoring Report    
 6/30/2003  Gas Monitoring Report    
 7/15/2003  Waste Tire Processing Facility Report Due    
 7/18/2003  Leachate Report   Qualitative 8/8/03 | Quantity 7/18/03  
 7/21/2003  Landfill Inspection (Class 1)   Lmr- Flagging, Grnd H20 Report Not Received  
 7/21/2003  Waste Tire Processing Facility Inspection.   Lmr- Ok  
 7/21/2003  Landfill Inspection (Class 3)   Lmr- Chipped Tires In Waste Stream, Electornics In Scrap Metal  
 7/24/2003  Department Comments Sent   Per Tom Gucciardo Email: Facility Will Need Extension B/C Still Haven'T Submitted A Design Schedule.  
 8/7/2003  Status Report   Bruce Kennedy Emailed Tom Gucciardo; Pasco Co. Will Formally Request Extension For Completion Of Grease Facility.  
 8/8/2003  Gas Monitoring Report    
 8/8/2003  Gas Monitoring Report    
 8/8/2003  Monitoring Data Results Reviewed   Gw - 7/15/02  
 8/8/2003  Groundwater Report   Eval Of Gwmp; Morris- App 30 Day Time Ext Req Rec'D 4/1/03; App 15 Day Time Ext Req Rec'D 5/1/03  
 9/2/2003  Financial Assurance Documents   Sgm- Cost Est Approved 9/23/03 | Funding Ok-4/14/04  
 10/1/2003  Groundwater Monitoring Report   Sampled 7/3 & 8/4/03 (Sampled Late); Inc Resampling For Hg On 8/25/03 @ 4mw-1 & 2mw-2 | Exceedances Reported For Ph, Iron, Nitrate, Tds  
 10/24/2003  Waste Tire Processing Facility Report Due    
 11/13/2003  Status Report   Per T.Gucciardo: Pasco Co. Has Requested One Year Extension On In-Kind Project Completion And Has Submitted Construction Application For Grease Handling Facility.  
 11/13/2003  Status Report   From T.Gucciardo: Pasco Co. Requested One Year Extension & Have Submitted Application For Construction Of Grease Handling Facility.  
 11/26/2003  Landfill Inspection (Class 1)   Ds_Erosion In Intermediate Cover, Flagging In Daily & Intermediate Cover  
 11/26/2003  Landfill Inspection (Class 3)   Ds_Erosion  
 1/9/2004  Department Comments Sent   Dep Approval Of Request For One-Year Extension To Complete Construction Of Feshf.  
 1/9/2004  Department Comments Sent   Dep Approval Of Request For One-Year Extension To Complete Construction Of Feshf.  
 1/15/2004  Gas Monitoring Report    
 1/15/2004  Gas Monitoring Report    
 1/20/2004  Leachate Report   Quality Sampled 12/6/03 And Quantity | Reviewed 8/2/04 Smc  
 1/22/2004  Waste Tire Processing Facility Report Due    
 1/28/2004  Permit Condition Or Consent Order/Response Due   Results Of Quarterly Ash Sampling Required By Chapter 62-702  
 1/28/2004  Leachate Report   Quality Sampled 12/16/03 Received 1/28/04 | Reviewed 8/30/04 Smc  
 1/30/2004  Groundwater Monitoring Report   Sampled 12/15/03 | No Exceedances Reported  
 3/17/2004  Gas Monitoring Report    
 3/17/2004  Groundwater Monitoring Report   Sampled 12/17/03 & 1/5/04 To 1/8/04 (Late For Second Half 2003 Event) | Exceedances Reported For Ph, Iron, Nitrate, Tds  
 3/18/2004  Landfill Inspection (Class 1)   Lmr- Daily Cover Flagging, Erosion, Leachate Seeps...  
 3/18/2004  Waste Tire Processing Facility Inspection.   Lmr- Ok  
 3/18/2004  Landfill Inspection (Class 3)   Lmr- Flagging, No Berms, Monitoring Reports  
 3/29/2004  Gas Monitoring Report    
 4/15/2004  Groundwater Report   Morris- Rec'D Req From Mactec On 3/29/04 For Ext. From 3/15/04  
 4/15/2004  Leachate Report   Quantity Report  
 4/15/2004  Leachate Report   Quantity  
 4/15/2004  Groundwater Monitoring Report   Sampled 3/9/04 | No Exceedances Reported  
 4/19/2004  Waste Tire Processing Facility Report Due    
 4/23/2004  Leachate Report   Quality Sampled 3/16/04 Received 4/23/04 | Reviewed 8/30/04 Smc. Appendix Ii Parameters  
 5/7/2004  Gas Monitoring Report    
 5/7/2004  Gas Monitoring Report    
 6/7/2004  Groundwater Monitoring Report   Sampled-4/20-23/04 | Exceedances Reported For Ph, Iron, Nitrate  
 6/11/2004  Letter   Dep Letter To Pasco Co. Requesting $500 Cost & Expenses (Paragraph 20 Of Co).  
 6/11/2004  Letter   Dep Letter To Pasco Co. Requesting $500 Costs & Expenses (Paragraph 20 Of Consent Order); Pasco Does Not Have To Pay Because In-Kind Included Cost And Expenses.  
 7/7/2004  Leachate Report   Unclearif Original Report Was Received Earlier  
 7/9/2004  Waste Tire Processing Facility Report Due   Quantity  
 7/14/2004  Leachate Report   Quantity  
 7/15/2004  Leachate Report   Quantity  
 7/15/2004  Leachate Report   Quantity  
 7/16/2004  Waste Quantity Report    
 7/16/2004  Waste Quantity Report    
 8/3/2004  Waste Tire Processing Facility Inspection.   Lmr- Ok  
 8/3/2004  Landfill Inspection (Class 3)   Lmr- Seeps; Waste In Water  
 8/3/2004  Landfill Inspection (Class 1)   Lmr- Seeps  
 8/19/2004  Financial Assurance Documents   Inflation-Adjusted Cost Ests Date 8/17/04 Approved For 2004, Sgm | Funding Ok Per Talla Ltr 6/13/05; ?? Subsequent Ltr 7/13/05  
 8/24/2004  Financial Assurance Documents   Inflation-Adjusted Cost Ests Dated 8/20/04 Approved For 2004 On 10/12/04 - Sgm  
 8/27/2004  Status Report   Lr Inspection Of Lf On 8/3/04, Photo Taken Of In-Kind Project Construction Site.  
 8/27/2004  Status Report   Lr Inspection Of Lf, Photo Taken Of In-Kind Project Construction Area.  
 9/8/2004  Gas Monitoring Report    
 9/17/2004  Gas Monitoring Report    
 10/4/2004  Monitoring Data Results Reviewed   Gw - 7/15/02 | Lmr  
 10/6/2004  Groundwater Monitoring Report   Sampled 8/23 & 8/24/04 | No Exceedances Reported  
 10/15/2004  Leachate Report   Quantity  
 10/18/2004  Monitoring Data Results Reviewed   Gw - 1/15/03 | Lmr  
 10/18/2004  Waste Tire Processing Facility Report Due    
 10/18/2004  Waste Quantity Report    
 10/18/2004  Waste Quantity Report    
 10/20/2004  Leachate Report   Faxed, Mailed Copy To Follow | App I Parameter11/2/04 Sample Event Rec'D 12/7/04 Due To Hurricane Related Obstacles  
 12/6/2004  Waste Tire Processing Facility Inspection.   Lmr- Fire Lanes, Wqr  
 12/6/2004  Landfill Inspection (Class 3)   Lmr- Ok  
 12/6/2004  Landfill Inspection (Class 1)   Lmr- Electronics In Scrap Metal; Fad Not Approved For Sw-2  
 12/7/2004  Leachate Report   Metals/Inorg Sampled 8/24/04; App I Sampled 9/13/04; Appendix Ii Sampled 11/1/04 @ Tank 2 | Reviewed 12/10/04 - Smc  
 12/7/2004  Leachate Report   Semester Ii (Jul-Dec) Leachate Monitoring Analytical Results For 8/25/04 Sampling Event Received On 9/29/04, Organics Sampled On 11/2/04 Received 12/7/04 | Reviewed 12/13/04 Smc  
 12/13/2004  Gas Monitoring Report   Qtr Iv  
 12/13/2004  Gas Monitoring Report    
 12/13/2004  Groundwater Monitoring Report   8/30/04-9/13/04 Sampling Event | Exceedances Reported For Ph, Iron, Nitrate, Tds  
 1/15/2005  Leachate Report   Quantity  
 1/28/2005  Waste Quantity Report   Included In 4th Qtr County-Wide Report  
 1/28/2005  Waste Quantity Report   4th Qtr Tonnage Report  
 1/28/2005  Waste Tire Processing Facility Report Due    
 2/8/2005  Submittal Received By Department   Update Letter From Pasco County; Start Up Of Facility, Cert Will Be Submitted End Of 2/05.  
 2/17/2005  Gas Monitoring Report    
 2/17/2005  Gas Monitoring Report    
 3/10/2005  Groundwater Monitoring Report   Sampled 2/7/05 | No Exceedances Reported  
 3/23/2005  Groundwater Monitoring Report   Sampled 2/8 To 2/15/05 | Exceedances Reported For Ph, Iron, Tds  
 4/8/2005  Leachate Report   Leachate Samples Collected From Tanks #1 And #2 3/2/05 | App Ii Results Reported  
 4/11/2005  Leachate Report   A1 Primary/Secondary, Sw Primary/Secondary Leachate Sampled 3/1/05 | Reported App Ii Parameters  
 4/15/2005  Leachate Report   Quantity  
 4/26/2005  Status Report    
 5/3/2005  Waste Tire Processing Facility Report Due    
 5/25/2005  Monitoring Data Results Reviewed   Gw - 1/15/04 | Imj  
 5/26/2005  Monitoring Data Results Reviewed   Gw - 7/15/04 | Imj  
 5/26/2005  Monitoring Data Results Reviewed   Gw - 7/15/03 | Imj  
 5/26/2005  Leachate Report   Quality  
 5/26/2005  Leachate Report   Quality  
 6/13/2005  Gas Monitoring Report    
 6/16/2005  Department Comments Sent   Msp Email To Gucciardo - Has Cert Been Reviewed?  
 6/16/2005  Department Comments Sent   Msp Email To Gucciardo - Has Cert Been Reviewed?  
 6/30/2005  Waste Tire Processing Facility Report Due    
 7/13/2005  Financial Assurance Documents   Need Addtl Funding Per Talla Ltr 6/9/05 | Okay Per Talla Ltr 7/13/05  
 7/15/2005  Leachate Report   Quantity  
 7/15/2005  Leachate Report   Quantity  
 7/29/2005  Groundwater Report   Gwmp Evaluation; Time Ext. Req. Rec'D 7/15/05, Original Due Date 3/31/05  
 8/1/2005  Waste Tire Processing Facility Report Due    
 8/16/2005  Department Comments Sent   Sjp Email To Gucciardo - Has Cert Been Reviewed Yet?  
 8/16/2005  Department Comments Sent   Sjp Email To Tom Gucciardo Requesting Update On Review Of Certification For Feshf; Tom Replied That He Hasn'T Reveiwed It Yet.  
 8/18/2005  Waste Tire Processing Facility Inspection.   Bg, Lmr- Ok  
 8/26/2005  Status Report    
 8/30/2005  Gas Monitoring Report    
 8/30/2005  Financial Assurance Documents   Cost Est. For Ash Cell (30 Acre); Rec'D Ce'S For Sw I And Ii 8/31/05  
 8/30/2005  Financial Assurance Documents   Ests  
 8/30/2005  Gas Monitoring Report    
 9/5/2005  Waste Tire Processing Facility Inspection.    
 9/5/2005  Landfill Inspection (Class 3)    
 9/6/2005  Department Comments Sent   Gucciardo Email: Still Needs To Review Cost Documentation  
 9/6/2005  Department Comments Sent   Gucciardo: Still Needs To Review Cost Documentation.  
 9/20/2005  Status Report    
 9/21/2005  Status Report    
 9/30/2005  Leachate Report    
 10/28/2005  Status Report    
 10/28/2005  Status Report    
 11/22/2005  Department Comments Sent   Tom Gucciardo Reviewed In-Kind Project Costs Submittal And Found It Acceptable; Dw Wil Close Case.  
 12/6/2005  Department Comments Sent   Case Closure Request Sent To Ogc  
 12/6/2005  Groundwater Monitoring Report   Sampled 9-20-05 -Btg | No Exceedances Reported  
 12/8/2005  Groundwater Monitoring Report   Exceedances: Benzene, Sampled 10/6/05 -Btg  
 12/12/2005  Gas Monitoring Report   All Wells Were 0% Lel  
 12/12/2005  Gas Monitoring Report   All Wells Were Zero % Lel  
 12/15/2005  Case Closed By District   See Project #232155  
 12/16/2005  Case Closed By District    
 12/27/2005  Waste Tire Processing Facility Report Due   3rd Quarter (Sept. 30, 2005) -Btg  
 1/5/2006  Waste Quantity Report    
 1/15/2006  Leachate Report   Quantity  
 3/8/2006  Waste Tire Processing Facility Report Due   4th Quarter  
 3/13/2006  Gas Monitoring Report   The Scale House, Operations Office, Monitoring Wells 2mw&, 2mw8, & 2wm10 Measured 0%Lel  
 3/14/2006  Gas Monitoring Report   All Monitoring Wells To Include The Scale House & Operations Office Measured 0% Lel  
 3/20/2006  Gas Monitoring Report   Sampled 3/13/06 | 2 Ambient Locations And 3 Monitor Wells Reported 0% Lel  
 3/20/2006  Gas Monitoring Report   See Appendix Xxiii-Condition Xiv.D.9., 14., &15  
 3/20/2006  Gas Monitoring Report   All The Ground Water And Monitioring Wells Monitored Were At 0 % Lel  
 4/5/2006  Landfill Inspection (Class 1)    
 4/5/2006  Landfill Inspection (Class 3)    
 4/5/2006  Waste Tire Processing Facility Inspection.    
 4/15/2006  Leachate Report   Quantity  
 5/9/2006  Leachate Report   Quality Four Leachate Tanks. Semester I Jan - June  
 5/9/2006  Leachate Report   Tanks 1 And 2 Sampled 3/21/06 | App Ii Parameters Reported  
 5/22/2006  Leachate Report   Leachate Quality Report 5 Leachate Tanks  
 5/22/2006  Gas Monitoring Report   All The Ground Water And Gas Monitoring Wells Were At 0% Lel.  
 6/12/2006  Gas Monitoring Report   (Quarter I) Swr-2a, Swr-3b, Swr-4a, And Swr-5  
 6/22/2006  Gas Monitoring Report   Sampled 6/15/06 @ 2 Ambient Locations And 3 Monitor Wells | 0% Lel Reported At All Locations  
 6/23/2006  Groundwater Monitoring Report    
 6/23/2006  Groundwater Monitoring Report   First Semester Sampling Period (Jan-Jun)  
 6/23/2006  Groundwater Monitoring Report   Sampled 3/1/06 | No Exceedances Reported  
 7/3/2006  Waste Tire Processing Facility Report Due   1st Quarter 2006 (Ltr 6-28-06)  
 7/3/2006  Waste Quantity Report   1st Quarter2006 (Ltr 6-28-06)  
 7/3/2006  Waste Quantity Report   1st Quarter 2006 (Ltr 6-28-06)  
 8/4/2006  Leachate Report   Quantity  
 8/4/2006  Groundwater Report   1st Report Rec'D 7/11/06 Was Incomplete; 2nd Report Provided Eval Of Data Through 1st Half 2006  
 8/8/2006  Groundwater Monitoring Report   Semi-Annual Quality Due By 9/15/06  
 8/9/2006  Financial Assurance Documents   Sgm Inf. Adj. 08/09/2006  
 8/11/2006  Financial Assurance Documents   Sgm Inf. Adj. 08/11/2006  
 8/17/2006  Financial Assurance Documents   Sgm Inf Adj. 08/17/06 W.P. Class I- Sw I & Sw Ii  
 9/6/2006  Waste Tire Processing Facility Report Due   Second Quarter Report  
 9/15/2006  Monitoring Data Results Reviewed   Gw - 1/15/03 | Dpn  
 9/15/2006  Monitoring Data Results Reviewed   Gw - 7/15/03 | Dpn  
 9/17/2006  Monitoring Data Results Reviewed   Gw - 1/15/04 | Dpn  
 10/15/2006  Leachate Report   Quantity  
 10/18/2006  Monitoring Data Results Reviewed   Gw - 7/15/04 | Dpn  
 10/20/2006  Monitoring Data Results Reviewed   Gw - 1/15/05 | Dpn  
 10/20/2006  Waste Tire Processing Facility Inspection.    
 10/20/2006  Landfill Inspection (Class 3)    
 10/20/2006  Landfill Inspection (Class 1)    
 10/20/2006  Monitoring Data Results Reviewed   Gw - 7/15/05 | Dpn  
 10/24/2006  Waste Tire Processing Facility Report Due    
 10/25/2006  Waste Quantity Report    
 10/25/2006  Waste Quantity Report   Wqr  
 10/27/2006  Gas Monitoring Report    
 10/27/2006  Gas Monitoring Report    
 1/10/2007  Gas Monitoring Report   Sampled 12/29/06 @ 2 Ambient Locations And 3 Monitor Well Locations | 0% Lel Reported At All Locations  
 1/10/2007  Gas Monitoring Report    
 1/17/2007  Leachate Report   Generation  
 1/30/2007  Permit Condition Or Consent Order/Response Due   Ash Analysis  
 1/31/2007  Waste Tire Processing Facility Report Due    
 2/1/2007  Waste Quantity Report   Wqr  
 2/1/2007  Waste Quantity Report   Wqr  
 2/2/2007  Renewal Application Due    
 2/2/2007  Permit Condition Or Consent Order/Response Due   Leachate Collection System Pressure Cleaned Or Video Inspected | Submitted As Part Of Permit Renewal Application  
 2/5/2007  Groundwater Monitoring Report   2 Semi Annual Report 2006, Mam  
 2/5/2007  Groundwater Monitoring Report   Sampled 9/28/06 | No Exceedances Reported  
 2/26/2007  Monitoring Data Results Reviewed   Gw - 1/15/05 | Aea  
 2/26/2007  Monitoring Data Results Reviewed   Gw - 7/15/05 | Aea  
 2/26/2007  Monitoring Data Results Reviewed   Gw - 1/15/06 | Aea  
 2/26/2007  Monitoring Data Results Reviewed   Gw - 7/15/06 | Aea  
 2/27/2007  Leachate Report   Quantity  
 3/26/2007  Groundwater Report   Mon Plan Eval Rpt Through 2nd Half 2006 Sampling Event  
 4/24/2007  Gas Monitoring Report   Sjp-No Exceedances  
 4/24/2007  Gas Monitoring Report   Sjp-No Exceedances  
 5/12/2007  Monitoring Data Results Reviewed   Gw - 1/15/07 | Jrm  
 5/17/2007  Leachate Report   Quality, Analyticals, Mam  
 5/22/2007  Waste Tire Processing Facility Report Due    
 6/7/2007  Waste Tire Processing Facility Report Due    
 6/7/2007  Financial Assurance Documents   Proof Of Funding  
 6/7/2007  Financial Assurance Documents   Proof Of Funding  
 6/7/2007  Waste Tire Processing Facility Report Due    
 6/7/2007  Financial Assurance Documents    
 6/7/2007  Renewal Application Due    
 6/7/2007  Waste Tire Processing Facility Report Due    
 6/7/2007  Waste Tire Processing Facility Report Due    
 6/7/2007  Financial Assurance Documents   Proof Of Funding  
 6/7/2007  Waste Tire Processing Facility Report Due    
 6/7/2007  Waste Tire Processing Facility Report Due    
 6/7/2007  Financial Assurance Documents    
 6/7/2007  Financial Assurance Documents    
 6/7/2007  Waste Tire Processing Facility Report Due    
 6/7/2007  Waste Tire Processing Facility Report Due    
 6/7/2007  Financial Assurance Documents   Proof Of Funding  
 6/7/2007  Waste Tire Processing Facility Report Due    
 6/7/2007  Waste Tire Processing Facility Report Due    
 6/7/2007  Waste Tire Processing Facility Report Due    
 6/7/2007  Waste Tire Processing Facility Report Due    
 6/7/2007  Waste Tire Processing Facility Report Due    
 6/7/2007  Financial Assurance Documents    
 6/7/2007  Waste Tire Processing Facility Report Due    
 6/7/2007  Waste Tire Processing Facility Report Due    
 6/8/2007  Waste Tire Processing Facility Inspection.    
 6/8/2007  Landfill Inspection (Class 3)    
 6/8/2007  Landfill Inspection (Class 1)    
 6/15/2007  Permit Condition Or Consent Order/Response Due   Topos For Class I & Ash Cells, Sw-1 A-2  
 6/22/2007  Gas Monitoring Report   Sampled 06/19/2007, Mam  
 6/25/2007  Gas Monitoring Report    
 7/11/2007  Groundwater Monitoring Report   Sampled 3/27 & 3/28/07, Mam | No Exceedances Reported  
 7/11/2007  Groundwater Monitoring Report   Sampled 3/29/2007, Mam  
 7/25/2007  Waste Tire Processing Facility Report Due   Mam  
 7/27/2007  Leachate Report   Quality | Ng  
 8/29/2007  Financial Assurance Documents   Mam Inf. Adj. 09/07/2007  
 8/29/2007  Financial Assurance Documents   Mam, Infl Adj Approved 09072007  
 9/4/2007  Gas Monitoring Report   Sampled 08/29/2007, Mam No Exceedences  
 9/7/2007  Waste Tire Collection Center Inspection.   Pile To Be Chipped Soon, Large, Mam  
 9/7/2007  Landfill Inspection (Class 1)   N Slope - Intermediate Cover, Seep (1), Stressed Vegetation, Leachate Collection Trenches Of Cdo Blocked - Mam | New Mowing Contracter Causing Stressed Vegetation, Mam  
 9/7/2007  Landfill Inspection (Class 3)   Initial Cover Better, Thin W/Flagging Mam | More Adequate Cover In The Future, Mam  
 9/14/2007  Gas Monitoring Report   Mam  
 9/21/2007  Leachate Report   Quality  
 10/24/2007  Monitoring Data Results Reviewed   Gw - 7/15/07 | Jrm  
 11/2/2007  Waste Tire Processing Facility Report Due   Wtpr Report, Mam  
 11/5/2007  Groundwater Monitoring Report   Mam - Sampled 08/21/2007 | No Exceedances Reported (Elevated Mdls For Antimony, Arsenic, Lead, Thallium)  
 11/28/2007  Groundwater Monitoring Report   Sampled 09/17/2007, Mam  
 11/28/2007  Gas Monitoring Report   No Exceedences, Mam Sampled 11/16/2007  
 12/19/2007  Gas Monitoring Report   Mam - No Exceedeces  
 1/11/2008  Waste Tire Collection Center Inspection.   I Pile Of Tires, 0 Problems - Ng  
 1/11/2008  Landfill Inspection (Class 3)   Initial Cover Applied Weekly And In Good Condition  
 1/11/2008  Landfill Inspection (Class 1)   Several Areas Of Minor Erosion On Sw1 - Ng | Response Indicated Issues Addressed  
 1/14/2008  Gas Monitoring Report   Mam, Sampled 01/9/2008  
 1/16/2008  Gas Monitoring Report   Mam - Sampled 1/10/2008  
 1/16/2008  Gas Monitoring Report   Sampled 01112008, Mam  
 1/25/2008  Permit Condition Or Consent Order/Response Due   Ash Total Metal Results, Mam  
 2/6/2008  Waste Tire Processing Facility Report Due   Mam  
 3/14/2008  Waste Tire Collection Center Inspection.   1 Pile Of Tires, 0 Problems - Ng  
 3/14/2008  Landfill Inspection (Class 3)   In Compliance  
 3/14/2008  Landfill Inspection (Class 1)   Minor Erosion On Sw-1, Previously Identified Erosion Repaired, Minor Flagging On Sw-2, And Spilled Blast Media -Ng | Response Recvd 3/26/08 - Addresses Erosion Repair & Black Beauty Blast Media  
 4/17/2008  Monitoring Data Results Reviewed   Gw - 1/15/08 | Jrm  
 7/29/2008  Site Inspection   Section 4.0 Intentially Marked All N/A Because Facility Does Not Have A Waste Processing Facility.  
 7/30/2008  Site Inspection   Please Provide The Department With A Copy Of The Facility'S Most Recent Fire Safety Survey.  
 7/30/2008  Site Inspection    
 8/22/2008  Gas Monitoring Report    
 8/22/2008  Leachate Report    
 8/22/2008  Gas Monitoring Report    
 8/22/2008  Gas Monitoring Report    
 8/22/2008  Groundwater Monitoring Report    
 8/22/2008  Leachate Report    
 8/22/2008  Gas Monitoring Report    
 8/22/2008  Waste Quantity Report    
 8/22/2008  Groundwater Monitoring Report    
 12/22/2008  Enforcement Referral   Closed  
 1/7/2009  Financial Assurance Documents    
 1/12/2009  Enforcement Tracking    3547
 2/11/2009  Penalty    3547
 2/20/2009  Site Inspection    
 2/20/2009  Site Inspection    
 2/20/2009  Site Inspection   1. Very Minor Erosion Was Observed In The Top Ne Corner Of Sw I. While This Area Is Much Improved From Previous Inspections It Should Continued To Be Monitored.  
 2/24/2009  Waste Quantity Report    
 2/24/2009  Waste Quantity Report    
 2/24/2009  Waste Quantity Report    
 2/27/2009  Consent Order    3547
 3/6/2009  Waste Quantity Report    
 3/6/2009  Gas Monitoring Report    
 3/6/2009  Gas Monitoring Report    
 3/6/2009  Waste Quantity Report    
 3/6/2009  Waste Quantity Report    
 3/6/2009  Waste Quantity Report    
 3/6/2009  Groundwater Monitoring Report    
 3/25/2009  Gas Monitoring Report    
 3/25/2009  Gas Monitoring Report    
 3/27/2009  Waste Quantity Report    
 3/27/2009  Waste Quantity Report    
 3/27/2009  Leachate Report    
 3/27/2009  Waste Quantity Report    
 3/27/2009  Waste Quantity Report    
 3/27/2009  Groundwater Monitoring Report    
 4/16/2009  Submittal Received By Department    
 4/19/2009  Leachate Report    
 4/20/2009  Groundwater Report    
 4/20/2009  Leachate Report    
 4/20/2009  Gas Monitoring Report    
 5/1/2009  Site Inspection    
 5/1/2009  Site Inspection    
 5/1/2009  Site Inspection    
 6/9/2009  Groundwater Monitoring Report    
 6/9/2009  Gas Monitoring Report    
 6/9/2009  Waste Quantity Report    
 6/9/2009  Waste Quantity Report    
 6/9/2009  Groundwater Monitoring Report    
 6/9/2009  Groundwater Monitoring Report    
 6/11/2009  Waste Quantity Report    
 9/21/2009  Site Inspection   During The Inspection Of The Wte Plant, Department Staff Observed Several Low Areas On The Tipping Floor Which Appeared To Be Holding Water. Operator Indicated That One Of The Area Was Scheduled To Be Repaired Soon, While The Others Were Watch Areas.  
 9/24/2009  Gas Monitoring Report    
 9/24/2009  Waste Quantity Report    
 9/24/2009  Gas Monitoring Report    
 9/24/2009  Leachate Report    
 10/7/2009  Monitoring Data Results    
 12/17/2009  Site Inspection    
 12/28/2009  Submittal Received By Department    
 1/21/2010  Gas Monitoring Report    
 1/21/2010  Gas Monitoring Report    
 1/21/2010  Groundwater Monitoring Report    
 1/21/2010  Groundwater Monitoring Report    
 1/21/2010  Gas Monitoring Report    
 1/21/2010  Gas Monitoring Report    
 1/22/2010  Waste Quantity Report    
 1/22/2010  Waste Quantity Report    
 2/22/2010  Submittal Received By Department    
 3/24/2010  Waste Quantity Report    
 3/24/2010  Submittal Received By Department    
 3/24/2010  Submittal Received By Department    
 3/24/2010  Waste Tire Collector Registration - Incoming    
 3/30/2010  Site Inspection   Department Staff Observed Minor Damage On The Facade Of The Ash Building In The Form Of Rusting And A Small Hole. | Department Staff Observed A Ballast (Non Pcb) In The Scrap Metal Pile. | Department Staff Observed The Operation Of The New (Non Fe  
 6/23/2010  Groundwater Monitoring Report    
 6/23/2010  Groundwater Monitoring Report    
 6/23/2010  Groundwater Monitoring Report    
 6/23/2010  Groundwater Monitoring Report    
 6/23/2010  Groundwater Monitoring Report    
 7/7/2010  Leachate Report    
 7/14/2010  Gas Monitoring Report    
 7/14/2010  Gas Monitoring Report    
 7/15/2010  Site Inspection   Item 1.2 - The Department Received The Annual Site Life Estimates For The Class Iii Landfill On June 21, 2010. It Does Not Appear That Annual Site Life Estimates Were Received For The Sw Or Ash Cells In 2010. Please Clarify If Survey Was Performed An  
 7/26/2010  Submittal Received By Department    
 12/14/2010  Site Inspection   Items 12.6, 12.7 - A Spotter Was Not Present On The Wte Tipping Floor During The Inspection. It Appeared That Incoming Loads Are Dumped Directly Into The Pit Without Being Spotted. Facility Staff Indicated That There Is Not A Designated Employee Avai  
 3/2/2011  Gas Monitoring Report    
 3/2/2011  Gas Monitoring Report    
 3/2/2011  Gas Monitoring Report    
 3/2/2011  Gas Monitoring Report    
 3/2/2011  Gas Monitoring Report    
 3/2/2011  Gas Monitoring Report    
 3/4/2011  Leachate Report    
 3/4/2011  Groundwater Monitoring Report    
 3/18/2011  Site Inspection   Items 1.7, 1.9 - Pending Dept Review Item 2.19 - Department Staff Observed An Area On The S Slope Of Sw-2 Which Had Been Recently Repaired After Hog Damage. Staining And Evidence Of Seepage Was Observed In The Area, However, Did Not Appear To Tra  
 4/8/2011  Groundwater Monitoring Report    
 4/8/2011  Groundwater Monitoring Report    
 4/8/2011  Groundwater Monitoring Report    
 4/8/2011  Groundwater Monitoring Report    
 4/14/2011  Groundwater Monitoring Report    
 4/14/2011  Groundwater Monitoring Report    
 4/22/2011  Gas Monitoring Report    
 4/22/2011  Gas Monitoring Report    
 5/12/2011  Financial Assurance Documents    
 5/12/2011  Financial Assurance Documents    
 8/22/2011  Gas Monitoring Report    
 8/22/2011  Gas Monitoring Report    
 8/26/2011  Site Inspection   Item 1.7 - Gw Results Pending Dept Review Item 2.29 - A Large Area Of Subsidence Was Observed On The N Slope, W End, Of Sw-1. Other Smaller Areas Of Settlement Also Observed On Top Of Sw-1. Operator Indicated These Areas Had Been Identified And We  
 9/15/2011  Financial Assurance Documents    
 9/15/2011  Financial Assurance Documents    
 11/15/2011  Gas Monitoring Report    
 11/15/2011  Gas Monitoring Report    
 11/17/2011  Site Inspection   Item 1.7 - Did Not Review Prior To Inspection Item 1.9 - Pending Tallahassee Review, 2011 Inf-Adj Cost Estimates Were Approved By District Item 2.28 - The Berm Along The S Toe Of Sw-2 Appeared To Have Been Partially Breached In One Area. No See  
 3/28/2012  Site Inspection   1.7 - Not Evaluated Prior To Inspection. | Item 2.37 - All Groundwater Wells Were Not Checked During This Inspection.  
 6/27/2012  Site Inspection   The Purpose Of This Inspection Was To Observe Site Conditions After Tropical Storm(Ts) Debby (June 23-26, 2012). The Department Received Notification On June 26, 2012 From Mr. John Power, Solid Waste Manager For Pasco County, That As A Result Of Heav  
 9/26/2012  Cost Estimates    
 9/26/2012  Cost Estimates    
 10/24/2012  Site Inspection   Item 1.7 - Gw Results Not Evaluated As Part Of This Inspection Item 1.9 - Pending Tlh Review Item 2.10 - Did Not Check All Records During This Inspection Item 2.21 - Minor Hog Damage Was Observed On Sw-1 Which Needs Regrading/Seeding. A Larg  
 11/13/2012  Gas Monitoring Report    
 11/13/2012  Gas Monitoring Report    
 11/13/2012  Gas Monitoring Report    
 11/13/2012  Gas Monitoring Report    
 11/13/2012  Gas Monitoring Report    
 11/13/2012  Gas Monitoring Report    
 4/25/2013  Site Inspection   This Inspection Was Conducted In Conjunction With A Department Full Compliance Evaluation (Fce) For The Site-Wide Title V Air Permit. Item 1.6 - Groundwater Results Not Reviewed As Part Of This Inspection Item 2.13, 2.15, 2.16 - During The Insp  
 7/24/2013  Gas Monitoring Report    
 7/24/2013  Gas Monitoring Report    
 7/24/2013  Gas Monitoring Report    
 12/12/2013  Site Inspection   During The Inspection, The Waste-To-Energy Plant, Class I Landfill (Sw-1, Sw-2, A-1, A-2, A-3 And A-4), Class Iii Landfill, Waste Tire Processing Facility, Source Separated Organics Processing Facility (Sopf), Household Hazardous Waste Collection Cen  
 5/7/2014  Site Inspection   During The Inspection, The Waste-To-Energy Plant, Class I Landfill (Sw-1, Sw-2, A-1, A-2, A-3 And A-4), Class Iii Landfill, Waste Tire Processing Facility, Source Separated Organics Processing Facility (Sopf), Household Hazardous Waste Collection Cen  
 12/9/2014  Cost Estimates    
 12/9/2014  Cost Estimates    
 1/22/2015  Gas Monitoring Report    
 1/22/2015  Gas Monitoring Report    
 1/22/2015  Gas Monitoring Report    
 1/23/2015  Site Inspection   Comments Section 1 Of 2: 1.5 - 1st And 2nd Semiannual 2014 Groundwater Reports Reviewed For This Inspection. 1.6 - Groundwater Trending Analysis Not Conducted During For This Inspection. 1.8 - Financial Assurance For Class Iii And Class I Ar  
 1/28/2015  Gas Monitoring Report    
 5/5/2015  Gas Monitoring Report    
 6/9/2015  Groundwater Monitoring Report    
 6/9/2015  Groundwater Monitoring Report    
 11/9/2015  Leachate Report    
 11/9/2015  Leachate Report    
 11/13/2015  Gas Monitoring Report    
 11/16/2015  Gas Monitoring Report    
 11/17/2015  Leachate Report    
 12/13/2015  Gas Monitoring Report    
 12/14/2015  Leachate Report    
 2/8/2016  Leachate Report    
 2/12/2016  Site Inspection   Item 1.8 - Funding Pending Tlh Review Item 2.19 - Minor Hog Damage Noted On Intermediately Covered Portions Of Sw-1 And Sw-2. No Exposed Waste Was Observed. Facility Routinely Regrades These Cells Due To Settlement And Hog Damage, And Will Continu  
 4/4/2016  Gas Monitoring Report    
 5/17/2016  Gas Monitoring Report    
 6/29/2016  Site Inspection   At The Time Of The Inspection The Waste Tire Facility Was In-Compliance And Well Maintained. 9.17 – Pasco County Mosquito Control Visits The Site On A Weekly Basis And Sprays For Mosquitoes As Needed. Please Continue Working With Them.  
 8/1/2016  Leachate Report    
 8/1/2016  Leachate Report    
 9/6/2016  Gas Monitoring Report    
 10/20/2016  Groundwater Monitoring Report    
 10/20/2016  Groundwater Monitoring Report    
 12/22/2016  Leachate Report    
 2/14/2017  Gas Monitoring Report    
 3/8/2017  Gas Monitoring Report    
 4/4/2017  Groundwater Monitoring Report    
 4/28/2017  Site Inspection   1.5 - During The April 2016 Sampling Event, The Two Wells Downgradient Of The Class Iii Landfill (4mw-21 And 4mw-22) Did Not Contain Sufficient Water To Allow Sample Collection. Please Conduct An Evaluation Of The Adequacy Of These Wells To Allow Sam  
 8/3/2017  Gas Monitoring Report    
 1/12/2018  Waste Quantity Report    
 1/19/2018  Site Inspection   The Facility Was Inspected For Ddms Closure On 1/19/18 9:30am. The Facility Had One Remaining Pile Of Mulch For Beneficial Use, But Otherwise Was Clear Of Yard Trash Debris. No Evidence Of Environmental Damage Was Noted During The Inspection. A Wac  
 1/31/2018  Gas Monitoring Report    
 4/23/2018  Gas Monitoring Report    
 5/4/2018  Site Inspection   Comments For Facility Review And Action: 1.6: Department Review Of The Groundwater Monitoring Data Review For The 2017 2nd Sa Sampling Event Is Pending Facility Correction To The Adapt Edd Submittals. Please See Separate Department Email Corresponde  
 5/21/2018  Leachate Report    
 5/21/2018  Gas Monitoring Report    
 5/21/2018  Groundwater Monitoring Report    
 6/5/2018  Waste Quantity Report    
 6/5/2018  Leachate Report    
 6/5/2018  Leachate Report    
 6/5/2018  Waste Quantity Report    
 8/1/2018  Waste Quantity Report    
 8/10/2018  Leachate Report    
 8/20/2018  Groundwater Monitoring Report    
 11/5/2018  Gas Monitoring Report    
 11/16/2018  Groundwater Monitoring Report    
 11/16/2018  Waste Quantity Report    
 11/16/2018  Leachate Report    
 12/7/2018  Submittal Received By Department    
 2/5/2019  Gas Monitoring Report    
 2/15/2019  Leachate Report    
 2/15/2019  Waste Quantity Report    
 3/4/2019  Gas Monitoring Report    
 5/8/2019  Gas Monitoring Report    
 6/10/2019  Leachate Report    
 6/10/2019  Waste Quantity Report    
 6/18/2019  Groundwater Monitoring Report    
 6/19/2019  Site Inspection   Items 1.5 And 1.6: The Department Is Currently Evaluating The Latest Groundwater Monitoring Report For Groundwater Standard Exceedances, Completeness, And Quality Assurance/Quality Control (Qa/Qc). Items 1.8 And 1.9: Cost Estimates Were Approved On  
 7/30/2019  Leachate Report    
 9/6/2019  Cost Estimates    
 10/16/2019  Site Inspection    

Violation History

Vio# Area Regulation Opened
By
Date
Determined
Completed ETA Act Act Date Regulation Text Excerpt   (mouse over for more text)
AOC    62-701.320(1)  Madden_M  7/30/2008  4/14/2009    1549 7/30/2008   Permit requirements. Except as otherwise provided in this chapter, no solid waste management facility shall be constructed, operated, maintained, modified, or closed without a permit issued by the Department, or by an approved local program acting un
   62-701.320(1)  Madden_M  7/30/2008  4/16/2009    1549 7/30/2008   Permit requirements. Except as otherwise provided in this chapter, no solid waste management facility shall be constructed, operated, maintained, modified, or closed without a permit issued by the Department, or by an approved local program acting un
AOC    62-701.500(10)  Madden_M  7/30/2008  4/14/2009    1549 7/30/2008   Stormwater system management. Stormwater management systems shall be operated and maintained as necessary to meet the requirements of subsection 62-701.400(9), F.A.C.
AOC    62-701.500(2)  Madden_M  7/30/2008  4/14/2009    1549 7/30/2008   Operation plan. Each landfill owner or operator shall have an operational plan that provides written, detailed instructions for the daily operation of the landfill. The operation plan shall be kept at or near the landfill facility and shall be access
AOC    62-701.500(2)(j), 62-701.500(8)(b), 62-701.500(8)(h)  Madden_M  7/30/2008  4/16/2009    1549 7/30/2008   Maintaining and cleaning the leachate collection system., The landfill operator is responsible for the operation of the leachate collection and removal system and for maintaining the system as designed for the design period. Leachate shall be collect
AOC    62-701.500(7)(j)  Madden_M  7/30/2008  3/6/2009    1547 7/30/2008   Erosion control measures shall be employed to correct any erosion which exposes waste or causes malfunction of the storm water management system. Such measures shall be implemented within three days of occurrence. If the erosion cannot be corrected w
AOC    62-701.500(7)(f)  Madden_M  8/6/2008  3/27/2009    1549 8/6/2008   An intermediate cover in addition to the six-inch initial cover shall be applied and maintained within seven days of cell completion if additional solid waste will not be deposited within 180 days of cell completion. The landfill operator may remove
AOC    62-701.320(1)  Madden_M  8/7/2008  3/6/2009    1547 8/7/2008   Permit requirements. Except as otherwise provided in this chapter, no solid waste management facility shall be constructed, operated, maintained, modified, or closed without a permit issued by the Department, or by an approved local program acting un
AOC    62-701.500(7)(f)  Gaskin_N  3/27/2009  6/11/2009    13000000000002 3/27/2009   An intermediate cover in addition to the six-inch initial cover shall be applied and maintained within seven days of cell completion if additional solid waste will not be deposited within 180 days of cell completion. The landfill operator may remove
AOC    62-701.500(7)(f)  Gaskin_N  4/6/2009  6/11/2009    13000000000002 4/6/2009   An intermediate cover in addition to the six-inch initial cover shall be applied and maintained within seven days of cell completion if additional solid waste will not be deposited within 180 days of cell completion. The landfill operator may remove
AOC    62-701.320(1)  Gaskin_N  4/14/2009  6/11/2009    13000000000002 4/14/2009   Permit requirements. Except as otherwise provided in this chapter, no solid waste management facility shall be constructed, operated, maintained, modified, or closed without a permit issued by the Department, or by an approved local program acting un
AOC    62-701.500(2)  Gaskin_N  4/14/2009  9/21/2009    13000000000002 4/14/2009   Operation plan. Each landfill owner or operator shall have an operational plan that provides written, detailed instructions for the daily operation of the landfill. The operation plan shall be kept at or near the landfill facility and shall be access
AOC    62-701.300(4), 62-701.300(5), 62-701.300(6), 62-701.300(8)(a), 62-701.300(8)(c), 62-701.300(8)(d), 62-701.300(8)(e), 62-701.300(9), 62-701.300(10), 62-701.300(11)(a), 62-701.300(11)(b)  Madden_M  9/21/2009  12/28/2009    8000000000030 9/21/2009   Hazardous waste. No hazardous waste shall be disposed of in a solid waste management facility unless such facility is permitted pursuant to Chapter 62-730, F.A.C., PCBs. Disposal of liquids containing a polychlorinated biphenyl (PCB), or non-liquid P
AOC    62-701.320(1)  Madden_M  9/21/2009  12/28/2009    8000000000030 9/21/2009   Permit requirements. Except as otherwise provided in this chapter, no solid waste management facility shall be constructed, operated, maintained, modified, or closed without a permit issued by the Department, or by an approved local program acting un
AOC    62-701.340(3), 62-701.500(2)(c), 62-701.500(6)(a)  Madden_M  9/21/2009  12/28/2009    8000000000030 9/21/2009   Classification of landfills. Landfills or solid waste disposal units are classified according to the amount or types of waste received., Controlling the type of waste received at the site. The plan shall specify inspection procedures, number and loca
AOC    62-701.500(10)  Madden_M  9/21/2009  12/28/2009    8000000000030 9/21/2009   Stormwater system management. Stormwater management systems shall be operated and maintained as necessary to meet the requirements of subsection 62-701.400(9), F.A.C.
AOC    62-701.500(2)  Madden_M  9/21/2009  12/28/2009    8000000000030 9/21/2009   Operation plan. Each landfill owner or operator shall have an operational plan that provides written, detailed instructions for the daily operation of the landfill. The operation plan shall be kept at or near the landfill facility and shall be access
AOC    62-701.500(7)(c)  Madden_M  9/21/2009  12/28/2009    8000000000030 9/21/2009   Solid waste shall be formed into cells to construct horizontal lifts. The working face of the cell, and side grades above land surface, shall be at a slope no greater than three feet horizontal to one foot vertical rise. Lift depth should normally no
AOC    62-701.400(9)(c), 62-701.500(10)  Madden_M  9/22/2009  12/28/2009    8000000000030 9/22/2009   Stormwater management systems shall be designed to avoid mixing of stormwater with leachate. Stormwater or other surface water which comes into contact with the landfilled solid waste or mixes with leachate shall be considered leachate and is subject
AOC    62-701.320(1)  Gaskin_N  1/22/2010  5/3/2010    7395 1/22/2010   Permit requirements. Except as otherwise provided in this chapter, no solid waste management facility shall be constructed, operated, maintained, modified, or closed without a permit issued by the Department, or by an approved local program acting un
AOC    62-701.500(7)(e)  Gaskin_N  1/22/2010  5/3/2010    7395 1/22/2010   Initial cover shall be applied and maintained at landfills in order to minimize any adverse environmental, safety, or health effects such as those resulting from birds, unauthorized wastes, blowing litter, odors, disease vectors, or fires. The minimu
AOC    62-701.500(7)(j)  Holtgard_E  4/13/2010  9/28/2010    8228 4/13/2010   Erosion control measures shall be employed to correct any erosion which exposes waste or causes malfunction of the storm water management system. Such measures shall be implemented within three days of occurrence. If the erosion cannot be corrected w
AOC    62-701.400(9)(c), 62-701.500(10)  Holtgard_E  4/20/2010  9/28/2010    8228 4/20/2010   Stormwater management systems shall be designed to avoid mixing of stormwater with leachate. Stormwater or other surface water which comes into contact with the landfilled solid waste or mixes with leachate shall be considered leachate and is subject
AOC    62-701.500(10)  Holtgard_E  4/20/2010  9/28/2010    8228 4/20/2010   Stormwater system management. Stormwater management systems shall be operated and maintained as necessary to meet the requirements of subsection 62-701.400(9), F.A.C.
AOC    62-701.400(9)(c), 62-701.500(10)  Holtgard_E  4/26/2010  9/28/2010    8228 4/26/2010   Stormwater management systems shall be designed to avoid mixing of stormwater with leachate. Stormwater or other surface water which comes into contact with the landfilled solid waste or mixes with leachate shall be considered leachate and is subject
AOC    62-701.500(7)(c)  Madden_M  3/2/2011  4/22/2011    11741 3/2/2011   Solid waste shall be formed into cells to construct horizontal lifts. The working face of the cell, and side grades above land surface, shall be at a slope no greater than three feet horizontal to one foot vertical rise. Lift depth shall not exceed 1
AOC    62-701.320(1), 403.161  Madden_M  8/29/2011  12/13/2011    8000000000067 8/29/2011   Permit requirements. Except as otherwise provided in this chapter, no solid waste management facility shall be constructed, operated, maintained, modified, or closed without a permit issued by the Department, or by an approved local program acting un
AOC    62-701.500(2)(j), 62-701.500(8)(b), 62-701.500(8)(h)  Madden_M  8/29/2011  12/13/2011    8000000000067 8/29/2011   Maintaining and cleaning the leachate collection system., The landfill operator is responsible for the operation of the leachate collection and removal system and for maintaining the system as designed for the design period. Leachate shall be collect
AOC    62-701.320(1), 403.161  Madden_M  12/13/2011  4/9/2012    154139 12/13/2011   Permit requirements. Except as otherwise provided in this chapter, no solid waste management facility shall be constructed, operated, maintained, modified, or closed without a permit issued by the Department, or by an approved local program acting un
AOC    62-701.500(2)(j), 62-701.500(8)(b), 62-701.500(8)(h)  Madden_M  3/22/2016  7/4/2016    169758 3/22/2016   Maintaining and cleaning the leachate collection system., The landfill operator is responsible for the operation of the leachate collection and removal system and for maintaining the system as designed for the design period. Leachate shall be collect
AOC    62-713.400(3), 62-701.510(2), 62-701.730(8), 62-701.730(10)  Madden_M  3/22/2016  7/4/2016    169758 3/22/2016   Water quality monitoring plan. A water quality monitoring plan which meets the requirements of Rule 62-701.510 and Chapter 62-522, F.A.C. and is based upon the hydrogeological investigation required in paragraph 62-713.300(3)(c), F.A.C., shall be inc
AOC    62-701.500(10), 62-701.400(9)(b)  Black_Ar  7/9/2019      179794 7/9/2019   Stormwater system management. Stormwater management systems shall be operated and maintained as necessary to meet the requirements of subsection 62-701.400(9), F.A.C., Stormwater or other surface water which comes into contact with the landfilled sol