Date Done Activity Type Activity Comments   (mouse over for more text) ETA Link
 9/17/1993  Groundwater Monitoring Report    
 4/15/1994  Landfill Inspection (Class 1)   Butera Compliance Inspection  
 6/24/1994  Landfill Inspection (Class 1)    
 7/22/1994  Warning Letter Issued    
 11/16/1994  Landfill Inspection (Class 1)    
 1/11/1995  Short Form Consent Order Issued   In-Kind Settlement Of Penalties  
 2/13/1995  Case Closed By District   Project Completed And Costs Submitted  
 6/28/1995  Groundwater Monitoring Report   Gwm  
 8/24/1995  Landfill Inspection (Class 1)   Morgan  
 10/19/1995  Waste Tire Processing Facility Report Due   Quarterly  
 10/24/1995  Landfill Closure Inspection (Class 1)   Morgan, Nichols  
 1/4/1996  Waste Quantity Report    
 1/4/1996  Waste Tire Processing Facility Report Due   Quarterly  
 1/15/1996  Comprehensive Quality Assurance Plan   Still Not Completed As Of Jan. 2, 1997  
 1/15/1996  Groundwater Monitoring Report   Gwm  
 2/7/1996  Gas Monitoring Report    
 2/7/1996  Leachate Report    
 4/11/1996  Landfill Inspection (Class 1)   Nichols  
 4/15/1996  Gas Monitoring Report    
 8/13/1996  Permit Condition Or Consent Order/Response Due   Proof Of Financial Funding  
 8/13/1996  Financial Assurance Documents   Funding Not Approved  
 8/22/1996  Gas Monitoring Report    
 8/28/1996  Groundwater Monitoring Report   Semi-Annual  
 8/30/1996  Permit Condition Or Consent Order/Response Due   Annual Cost Estimates; Still Not Approved By Jan. 2, 1997  
 9/15/1996  Leachate Report    
 10/17/1996  Landfill Inspection (Class 1)   Morgan, Latorre  
 10/17/1996  Material Recovery/Recycler Inspection.   Morgan, Latorre  
 12/17/1996  Permit Condition Or Consent Order/Response Due   Cost Estimates-Approved 1-27-97  
 12/19/1996  Gas Monitoring Report    
 1/13/1997  Permit Condition Or Consent Order/Response Due   Annual Yard Trash Report  
 1/13/1997  Waste Tire Processing Facility Report Due   Annual Report  
 1/27/1997  Gas Monitoring Report    
 1/29/1997  Groundwater Monitoring Report   Semi-Annual  
 1/29/1997  Comprehensive Quality Assurance Plan    
 1/29/1997  Leachate Report    
 2/19/1997  Material Recovery/Recycler Inspection.   Latorre  
 2/19/1997  Landfill Inspection (Class 1)   Latorre  
 2/19/1997  Construction/Demolition Debris Disposal Site Inspection.   Latorre; Unacceptable Waste And No Spotter At C&D  
 3/11/1997  Permit Condition Or Consent Order/Response Due   Evaluation Of Gwm Plan  
 3/11/1997  Renewal Application Due    
 4/7/1997  Waste Tire Processing Facility Report Due    
 4/30/1997  Permit Condition Or Consent Order/Response Due   Revised Ops Plan-Rec'D As Part Of Lf Op Permit Renewal  
 7/17/1997  Material Recovery/Recycler Inspection.   Pelz-Leachate & Waste On Floor-Floors Need To Be Cleaned  
 7/17/1997  Waste Tire Small Processor Inspection.    
 7/17/1997  Landfill Inspection (Class 1)   Pelz-Some Minor Erosion, Unacceptable Wastes In Scrap Metal Pile  
 7/31/1997  Compliance W/O Formal Enforcement Action   For 7/17/97 Inspection  
 8/20/1997  Gas Monitoring Report    
 8/20/1997  Leachate Report    
 8/20/1997  Gas Monitoring Report    
 8/27/1997  Financial Assurance Documents   Pelz-Ests Rec'D; Rai Via Phone 8-28-97; Approved 10-6-97  
 8/27/1997  Financial Assurance Documents   Pelz-Ests Rec'D; Rai Via Phone 8-28-97; Approved 10-6-97  
 1/5/1998  Gas Monitoring Report    
 1/5/1998  Gas Monitoring Report    
 1/12/1998  Permit Condition Or Consent Order/Response Due   Pelz-Yt Annual Report  
 1/12/1998  Permit Condition Or Consent Order/Response Due   Pelz-Wt Annual Report  
 1/12/1998  Permit Condition Or Consent Order/Response Due   Pelz-Leachate Qty Report- Dec 1997  
 1/12/1998  Waste Tire Processing Facility Report Due   Pelz-Oct, Nov, Dec 1997  
 2/9/1998  Leachate Report    
 2/25/1998  Material Recovery/Recycler Inspection.   Nichols; Not Operating-Equipment Down  
 2/25/1998  Landfill Inspection (Class 1)   Nichols; County Is Experiencing Difficulties In Controlling Leachate, Appears To Be Backed Up Into Lf, Also May Not Be Filling In Accordance With App. Plan  
 2/25/1998  Waste Tire Small Processor Inspection.   Nichols  
 3/11/1998  Waste Tire Processing Facility Report Due    
 3/11/1998  Gas Monitoring Report   Never Received  
 3/16/1998  Compliance Assistance Site Visit   Follow Up To 2/25 Insp., Nichols And Pelz--Talked With J.R. About Seq. Of Fill And Observed Leachate Ditch Which Is Down About A Foot  
 4/10/1998  Waste Tire Processing Facility Report Due   Pelz-Wqr Rec'D  
 5/27/1998  Financial Assurance Documents   Proof Of Funding-Approved  
 5/27/1998  Permit Condition Or Consent Order/Response Due   Funding Approved  
 6/19/1998  Landfill Inspection (Class 1)   Nichols, Morris;  
 6/19/1998  Waste Tire Small Processor Inspection.   Nichols, Morris  
 6/19/1998  Material Recovery/Recycler Inspection.   Nichols, Morris; Checked 2 Drains And Manhole Outside, Did Smell And Lots Of Flies; Also Looked At Hhw  
 6/30/1998  Groundwater Monitoring Report    
 7/9/1998  Gas Monitoring Report   Quarterly Gas Monitoring At Structures  
 7/9/1998  Leachate Report    
 7/29/1998  Waste Tire Processing Facility Report Due   Pelz-4-1-98 To 6-30-98  
 8/31/1998  Waste Tire Small Processor Inspection.   Nichols  
 8/31/1998  Material Recovery/Recycler Inspection.   Nichols; Floor And Odor Are Nasty  
 8/31/1998  Landfill Inspection (Class 1)   Nichols; Leachate Ditch Down Considerably, Random Load Checking Not 3 Per Week  
 10/15/1998  Financial Assurance Documents   Pelz-Infl Adj Ests;Rai Sent 10/19/98;Approved 2-1-99;Funding Ok 5-10-99  
 10/15/1998  Financial Assurance Documents   Pelz-Infl Adj Ests;Rai Sent 10/19/98;Approved 2-1-99;Funding Ok 5-10-99  
 10/15/1998  Financial Assurance Documents   Pelz-Infl Adj Ests;Rai Sent 10/19/98;Approved 2-1-99;Funding Ok 5-10-99  
 10/26/1998  Waste Tire Processing Facility Report Due    
 10/26/1998  Gas Monitoring Report   No Methane Detected In Buildings  
 10/26/1998  Leachate Report   July,Aug,Sept 1998  
 11/20/1998  Permit Condition Or Consent Order/Response Due   Survey & Calculations  
 12/9/1998  Material Recovery/Recycler Inspection.   Nichols; Veg. In Stormwater Pond  
 12/9/1998  Landfill Inspection (Class 1)   Nichols; Not Compacting For A Few Days, Remove Veg. In Stormwater Pond And Around Manholes, Leak In Leachate Pipe  
 12/9/1998  Waste Tire Small Processor Inspection.   Nichols; Basically No Tires Present  
 1/27/1999  Waste Quantity Report   Pelz-Oct, Nov, Dec 1998  
 1/27/1999  Gas Monitoring Report   Pelz  
 1/27/1999  Waste Tire Processing Facility Report Due   Pelz-Oct, Nov, Dec 1998 And Annual Qty Report  
 1/27/1999  Leachate Report   Pelz-Oct,Nov,Dec 1998 Qty  
 1/27/1999  Groundwater Monitoring Report   Also Surface Water (Sjp)  
 1/27/1999  Permit Condition Or Consent Order/Response Due   Pelz-Fire Safety Survey  
 3/1/1999  Permit Condition Or Consent Order/Response Due   Renewal Of Leachate Disposal (Ok-Sjp)  
 3/1/1999  Financial Assurance Documents   Pelz-Ests Submitted With Ci Ests; Approved 2-1-99;See Fax Dated 4-7-99 | Funding Ok 4-27-00  
 4/12/1999  Waste Tire Processing Facility Report Due    
 5/10/1999  Financial Assurance Documents   Proof Of Funding  
 5/10/1999  Financial Assurance Documents   Sjp-Ests Approved 2-1-00 | Funding Ok 4-27-00  
 6/9/1999  Gas Monitoring Report   Pelz-Sample Taken 3/3/99  
 7/21/1999  Material Recovery/Recycler Inspection.    
 7/21/1999  Landfill Inspection (Class 1)    
 7/21/1999  Waste Tire Small Processor Inspection.    
 8/12/1999  Leachate Report   Sjp-Apr, May,June Qty-No Analysis, Manhole Dry  
 8/12/1999  Groundwater Monitoring Report   Also Surface Water-Sjp-No Surface Water-Location Dry  
 8/12/1999  Waste Tire Processing Facility Report Due   Sjp April, May, June 1999  
 8/12/1999  Permit Condition Or Consent Order/Response Due   Revised Ops Plan (Sjp) See 8-3-99 Letter  
 8/12/1999  Gas Monitoring Report   Sjp-Measured On 6-1-99  
 9/24/1999  Gas Monitoring Report   Morris- Received Gas Monitoring Data Conducted 3/12/98 Via Fax | Four Locations Reported @<1ppm  
 10/15/1999  Waste Tire Processing Facility Report Due   Sjp-July, Aug, Sept 1999  
 11/9/1999  Waste Tire Small Processor Inspection.    
 11/9/1999  Material Recovery/Recycler Inspection.   Financial Assurance Documents Not Submitted By 09/01/99 - | Janice Is Working On It.  
 11/9/1999  Landfill Inspection (Class 1)   Loose Fill Area (Eastern Portion) Needs Additional Initial | Cover - Waste Is Exposed And Flagging  
 11/23/1999  Gas Monitoring Report   Sjp-Sampled On 9-10-99 | Morris- 4 Locations Reported @<1ppm  
 11/28/1999  Permit Condition Or Consent Order/Response Due   Survey & Capacity Calculations(Sjp)  
 11/29/1999  Financial Assurance Documents   Sjp-Rai 12-28-99;Approved 2-1-00 | Funding Ok 4-27-00  
 11/29/1999  Financial Assurance Documents   Sjp-Rai 12-28-99;Approved 2-1-00 | Funding Ok 4-27-00  
 11/29/1999  Financial Assurance Documents   Sjp-Rai 12-28-99;Approved 2-1-00 | Funding Ok 4-27-00  
 1/18/2000  Waste Quantity Report   Sjp-Yard Trash Qty, Lf Wqr 1999  
 1/18/2000  Waste Tire Processing Facility Report Due   Sjp-Oct, Nov Dec 1999  
 1/18/2000  Waste Quantity Report   Sjp-Yard Trash, Lf Wqr 1999  
 2/4/2000  Groundwater Monitoring Report   Also Surface Water | Morris- Ph & Iron Exceedances;Mw-8,Mw-9,P-15,P-16 Not Installed  
 2/4/2000  Leachate Report   Morris- App. Ii Parameters Reported  
 2/4/2000  Gas Monitoring Report   Morris- 4 Locations Reported @ <1ppm Methane  
 3/16/2000  Monitoring Data Results Reviewed   Gw - 7/15/99 | Msp Sis  
 3/27/2000  Landfill Inspection (Class 1)   White Goods | Smithee  
 3/27/2000  Material Recovery/Recycler Inspection.   Smithee  
 4/18/2000  Renewal Application Due    
 4/18/2000  Permit Condition Or Consent Order/Response Due   Revised Ops Plan  
 4/19/2000  Waste Tire Processing Facility Report Due    
 5/1/2000  Financial Assurance Documents   Proof Of Funding-Approved  
 6/11/2000  Waste Tire Small Processor Inspection.   Sis  
 6/26/2000  Monitoring Data Results Reviewed   Gw - 1/15/00  
 7/11/2000  Landfill Inspection (Class 1)   2/1 Slope,Intermediate Cover | Sis  
 7/11/2000  Material Recovery/Recycler Inspection.   Sis  
 7/13/2000  Waste Tire Processing Facility Report Due    
 7/26/2000  Gas Monitoring Report   Morris- First Gas Report With New Locations Gp-1 - Gp-9 | All Locations Reported @ <1ppm Methane  
 7/26/2000  Groundwater Monitoring Report   Morris- Exceedances Reported For Ph,Fe  
 8/31/2000  Financial Assurance Documents   Sjp-Infl Adj Ests Approved 9-7-00 | Funding: Approved 4/5/01  
 8/31/2000  Financial Assurance Documents   Sjp-Infl Adj Ests Approved 9-7-00 | Funding: Approved 4/5/01  
 8/31/2000  Financial Assurance Documents   Sjp-Infl Adj Ests Approved 9-7-00 | Funding: Approved 4/5/01  
 9/13/2000  Leachate Report   7/26/00-Leachate Trench Dry On Sampling Date, Re-Sample 7/25/00 | Morris- No Sample To Collect On 6/5/00; Reported App. I Parameters  
 10/5/2000  Waste Tire Processing Facility Report Due    
 10/17/2000  Gas Monitoring Report    
 11/14/2000  Material Recovery/Recycler Inspection.    
 11/14/2000  Landfill Inspection (Class 1)   Slopes,Plastic W/Mulch For Cover,Gas Vents Overgrown,Old Leachate Trench Still Full | Slopes,Gas Vents  
 11/14/2000  Waste Tire Small Processor Inspection.    
 11/20/2000  Groundwater Report   Morris- Approved County Request For Extension From 7/1 To 10/1; Gw Mon Plan Eval  
 12/13/2000  Permit Condition Or Consent Order/Response Due   Survey & Capacity Calculations | Jrm Granted Extension 5/23/00  
 12/28/2000  Non-Compliance Letter Issued    
 1/22/2001  Monitoring Data Results Reviewed   Gw - 7/15/00  
 2/2/2001  Groundwater Monitoring Report   Also Surface Water | Morris- Sampled 12/6/00; Exceedances Reported For Ph,Fe; Surface Water (Sw-1) Dry  
 2/2/2001  Leachate Report   Morris- Sampled 12/6/00; Reported App. Ii Parameters  
 2/2/2001  Gas Monitoring Report    
 3/27/2001  Landfill Inspection (Class 1)   Sis,Sjp  
 3/27/2001  Material Recovery/Recycler Inspection.   Sis,Sjp-Leachate,Storage | Leachate,Storage  
 3/27/2001  Waste Tire Processing Facility Report Due    
 4/23/2001  Gas Monitoring Report    
 5/20/2001  Permit Condition Or Consent Order/Response Due   Survey & Capacity Calculations  
 7/3/2001  Material Recovery/Recycler Inspection.   Sis  
 7/3/2001  Waste Tire Small Processor Inspection.   Sis  
 7/3/2001  Landfill Inspection (Class 1)   Sis  
 7/12/2001  Monitoring Data Results Reviewed   Gw - 1/15/01  
 7/13/2001  Waste Tire Processing Facility Report Due    
 7/13/2001  Waste Tire Processing Facility Report Due   Minor Confusion As To Who Gets These, Rectified During Site Visit  
 7/30/2001  Gas Monitoring Report    
 7/30/2001  Leachate Report   Sampled 6/5/01 | Morris- 1 Sample Reported For App. I Parameters  
 7/30/2001  Groundwater Monitoring Report   Also Surface Water; Sampled 6/5-6/01 | Morris- Exceedances Reported For Ph,Fe; Surface Water (Sw-1) Dry  
 9/17/2001  Financial Assurance Documents   Sjp-Cost Est Approved 9/26/01 | Funding: Ok 8/1/02  
 9/17/2001  Financial Assurance Documents   Sjp-Cost Est Approved 9/26/01 | Funding: Ok 8/1/02  
 9/26/2001  Financial Assurance Documents   Sjp-Cost Est Approved 9/26/01 | Funding: Ok 8/1/02  
 10/9/2001  Waste Tire Processing Facility Report Due   Cwb-2.14 Tons On Site  
 10/18/2001  Gas Monitoring Report   Sis,Cwb-Sampled 9/11/01  
 11/6/2001  Landfill Inspection (Class 1)   Sis,Cwb- No Berm At Base Of Working Face  
 11/6/2001  Waste Tire Small Processor Inspection.   Sis,Cwb-No Tires On Site  
 11/6/2001  Material Recovery/Recycler Inspection.   Sis,Cwb  
 12/10/2001  Monitoring Data Results Reviewed   Gw - 7/15/01  
 1/7/2002  Waste Tire Processing Facility Report Due    
 2/4/2002  Groundwater Monitoring Report   Also Surface Water; Sw-1 Reported Dry 12/10/01 | Morris- Gw Exceedances Reported For Ph, Iron, Lead  
 2/4/2002  Gas Monitoring Report    
 2/4/2002  Leachate Report   Sampled 12/11/01 | Morris- 1 Sample Reported For App. Ii Parameters  
 3/20/2002  Renewal Application Due    
 4/5/2002  Waste Tire Processing Facility Report Due    
 5/16/2002  Gas Monitoring Report    
 5/24/2002  Waste Tire Processing Facility Report Due    
 5/24/2002  Renewal Application Due   90 Days Before Expiration (05/07/2007)  
 7/11/2002  Waste Tire Processing Facility Report Due    
 7/15/2002  Waste Tire Small Processor Inspection.   Lr, Sm- Looked Good  
 7/15/2002  Landfill Inspection (Class 1)   Lr, Sm- Leachate Pumps Full, White Goods Not Upright, Tarp Tearing, Thin Cover  
 7/15/2002  Material Recovery/Recycler Inspection.   Lr, Sm- Still Waiting On Construction To Be Completed  
 8/21/2002  Permit Condition Or Consent Order/Response Due   Topo And Estimates  
 8/26/2002  Financial Assurance Documents   Sjp- Inf Adj Approved 10/3/02 | Funding Ok - 5/12/03  
 8/26/2002  Financial Assurance Documents   Sjp- Inf Adj Approved 10/3/02 | Funding Ok - 5/12/03  
 8/26/2002  Financial Assurance Documents   Sjp- Inf Adj Approved 10/3/02 | Funding Ok - 5/12/03  
 9/5/2002  Gas Monitoring Report   Fax Copy Received 8/29/02  
 9/5/2002  Leachate Report   Faxcopy Received 8/29/02; Sampled 6/10/02 | Morris- 1 Sample (Manhole 9) Analyzed For App I Parameters  
 9/5/2002  Groundwater Monitoring Report   Also Surface Water; Fax Copy Received 8/29/02; Sw-1 Dry And Not Sampled | Morris- Exceedances Reported For Ph, Iron  
 10/18/2002  Waste Tire Processing Facility Report Due    
 10/31/2002  Monitoring Data Results Reviewed   Gw - 1/15/02  
 11/13/2002  Material Recovery/Recycler Inspection.   Lr- Cleaning Day  
 11/13/2002  Landfill Inspection (Class 1)   Lr- Litter, Scrap Metal Pile, Refrid Not Marked  
 11/13/2002  Waste Tire Small Processor Inspection.   Lr- Ok  
 1/10/2003  Waste Tire Processing Facility Report Due    
 3/6/2003  Gas Monitoring Report    
 3/6/2003  Groundwater Monitoring Report   Sampled 12/16/02 | Morris- Exceedances Reported For Ph And Iron  
 3/6/2003  Leachate Report   Sampled 12/16/02 | Morris- 1 Sample (Manhole 1) Analyzed For App Ii Parameters  
 3/21/2003  Monitoring Data Results Reviewed   Gw - 1/15/03  
 3/24/2003  Letter   Methane Detection At The Leachate Pump Station  
 3/26/2003  Material Recovery/Recycler Inspection.   Lr- Mrf Was Not Operating Due To Equipment Failure The Night Before  
 3/26/2003  Landfill Inspection (Class 1)   Lr- Intermediate Covering Flagging  
 4/7/2003  Waste Tire Processing Facility Report Due    
 4/11/2003  Gas Monitoring Report    
 4/25/2003  Permit Condition Or Consent Order/Response Due   Topo  
 5/19/2003  Renewal Application Due    
 5/19/2003  Groundwater Report   Received As Part Of Renewal  
 6/19/2003  Letter   Gas Explosion At Leachate Box  
 7/7/2003  Waste Tire Processing Facility Report Due    
 7/8/2003  Waste Tire Small Processor Inspection.   Lmr- Tires In Vegetation  
 7/8/2003  Monitoring Data Results Reviewed   Gw - 7/15/02  
 7/8/2003  Material Recovery/Recycler Inspection.   Lmr- Ok  
 7/8/2003  Landfill Inspection (Class 1)   Lmr- No Berms/Swales, Damage Leachate Tank  
 8/21/2003  Groundwater Monitoring Report   Sampled 6/9/03; Includes Sw | Morris- Exceedances Reported For Ph, Iron  
 8/21/2003  Leachate Report    
 8/21/2003  Gas Monitoring Report    
 9/30/2003  Financial Assurance Documents   Sgm- Inflation Adjust Rai Sent 10/21/03; Approved 1/30/04  
 10/17/2003  Waste Tire Processing Facility Report Due    
 10/20/2003  Gas Monitoring Report    
 11/5/2003  Material Recovery/Recycler Inspection.    
 11/5/2003  Waste Tire Processing Facility Inspection.   Ds_Vegetation In Tires  
 11/5/2003  Landfill Inspection (Class 1)   Ds_Oil In Scrap Metal,Flagging In Intermediate, Inadequate Berms, No Road Around Yt  
 1/14/2004  Gas Monitoring Report    
 1/22/2004  Leachate Report   Quality Hardcopy Recieved 1/22/04- Sampled 12/11/03 | Reviewed 7/28/04 Smc  
 1/22/2004  Groundwater Monitoring Report   Sampled On 12/11/03  
 1/28/2004  Financial Assurance Documents   Sgm- Infl Adjust Approved 1/30/04  
 1/28/2004  Financial Assurance Documents   Sgm- Infl Adjust Approved 1/30/04  
 1/29/2004  Groundwater Monitoring Report   Sampled 12/11/03 | Morris- Exceedances Reported For Ph And Iron  
 1/29/2004  Waste Tire Processing Facility Report Due    
 3/2/2004  Landfill Inspection (Class 1)    
 3/2/2004  Material Recovery/Recycler Inspection.    
 3/2/2004  Waste Tire Collection Center Inspection.    
 3/19/2004  Gas Monitoring Report    
 4/12/2004  Waste Tire Processing Facility Report Due    
 6/17/2004  Gas Monitoring Report    
 7/12/2004  Waste Tire Processing Facility Report Due    
 7/15/2004  Waste Tire Processing Facility Inspection.   Lmr- Some Vegetation In Waste Tires  
 7/15/2004  Material Recovery/Recycler Inspection.   Lmr- Ok  
 7/15/2004  Landfill Inspection (Class 1)   Lmr- Litter, "Staging" Area, Unacceptables In Scrap, Gwmr/Gmr  
 8/2/2004  Financial Assurance Documents   Sgm- Inflation Adjust Rai; Approved 8/24/04 | Funding Ok Per Chad Ltr 8/23/05  
 8/2/2004  Financial Assurance Documents   Sgm Approved 8/24/04 | Funding Ok Per Chad Ltr 8/23/05  
 8/2/2004  Financial Assurance Documents   Sgm- Inflation Adjust Rai; Approved 8/24/04 | Funding Ok Per Chad Ltr 8/23/05  
 8/4/2004  Leachate Report   Annual Leachate Report Submitted With Semi-Annual Groundwater Monitoring | Leachate Quality Sampled On 5/17/04. No Appendix Ii Parameters. Reviewed 8/20/04 Smc  
 8/4/2004  Groundwater Monitoring Report   Sampled 5/17/04 | Exceedances Reported For Ph And Iron  
 8/5/2004  Groundwater Report   Semi-Annual Report Submitted With Annual Leachate Report  
 9/23/2004  Material Recovery/Recycler Inspection.   Sgm, Smc- Ok  
 9/23/2004  Landfill Inspection (Class 1)   Sgm, Smc- Cover, Scrap Metal Pile  
 9/23/2004  Waste Tire Processing Facility Inspection.   Sgm, Scm - Ok  
 10/8/2004  Waste Tire Processing Facility Report Due    
 10/22/2004  Permit Condition Or Consent Order/Response Due   Capacity/Lifetime Ests - Included 2003, 2004 Wqrs  
 10/29/2004  Monitoring Data Results Reviewed   Gw - 7/15/03 | Hds  
 10/30/2004  Monitoring Data Results Reviewed   Gw - 1/15/04 | Hds  
 11/11/2004  Permit Condition Or Consent Order/Response Due   Semi-Annual Sw  
 11/12/2004  Groundwater Monitoring Report   Sw-1 Sampled On 8/12/04  
 11/12/2004  Leachate Report   Leachate Quantity Reports From Jan-Sept 2004  
 12/16/2004  Groundwater Monitoring Report   Semi-Annual, Groundwater And Surface Water Monitoring Reports  
 12/16/2004  Leachate Report   Quality  
 12/16/2004  Groundwater Report   Water Quality Monitoring Evaluation Report  
 12/16/2004  Groundwater Monitoring Report   Semi-Annual, Groundwater And Surface Water Monitoring Reports  
 1/18/2005  Gas Monitoring Report   4th Qtr  
 2/7/2005  Groundwater Monitoring Report   Sampled 12/13/04 | Exceedances Reported For Ph, Iron  
 2/7/2005  Leachate Report   Mh-1 Sampled 12/13/04 | Appendix Ii Parameters Reported  
 3/30/2005  Gas Monitoring Report    
 4/11/2005  Waste Tire Processing Facility Report Due    
 4/11/2005  Permit Condition Or Consent Order/Response Due   Operational Plan  
 6/9/2005  Material Recovery/Recycler Inspection.   Lmr, Dpn- Material Outside Building; Vectors; Building Full; Litter; Training  
 6/9/2005  Landfill Inspection (Class 1)   Lmr, Dpn- 5 Working Faces; Berms W/Ditch Cleanings; Flagging; Erosion  
 6/9/2005  Waste Tire Processing Facility Inspection.   Lmr, Dpn- Ok  
 6/22/2005  Gas Monitoring Report   Bad Units, Also Missing Lab Sheet  
 7/11/2005  Waste Tire Processing Facility Report Due    
 7/18/2005  Leachate Report   Analytical Results Reported For "Leachate" Sample Collected 5/23/05 | Appendix I Parameters Reported  
 7/18/2005  Groundwater Monitoring Report   Semi-Annual Groundwater Monitoring Report (Surface Water Not Included Dn) | Exceedances Reported For Ph, Iron  
 7/20/2005  Monitoring Data Results Reviewed   Gw - 7/15/04 | Imj  
 7/26/2005  Waste Tire Small Processor Inspection.   Lr, Bg- Exceed Limits For Storage  
 7/26/2005  Landfill Inspection (Class 1)   Lr, Bg- Ponding, Flagging; Scrap Metal Pile  
 7/26/2005  Material Recovery/Recycler Inspection.   Lr, Bg- Vectors  
 8/1/2005  Financial Assurance Documents    
 8/1/2005  Financial Assurance Documents    
 8/1/2005  Financial Assurance Documents    
 9/21/2005  Permit Condition Or Consent Order/Response Due   Capacity Report  
 10/14/2005  Waste Tire Processing Facility Report Due   Btg  
 10/21/2005  Gas Monitoring Report   Sampled 9/6/05 -Btg  
 1/9/2006  Waste Tire Processing Facility Report Due    
 1/13/2006  Gas Monitoring Report    
 1/20/2006  Landfill Inspection (Class 1)   No Fire Lanes, Litter  
 1/20/2006  Material Recovery/Recycler Inspection.    
 1/20/2006  Waste Tire Collection Center Inspection.    
 1/23/2006  Groundwater Monitoring Report   Semi-Annual Gw Reports (Gw Sampled 11/28/05) Btg; Surface Water Received 1/17/06- Sampled 10/25/05 | Exceedances Reported For Ph, Iron  
 2/3/2006  Leachate Report   Quality, Missing App. Ii Parameters Due To Lab Error | Mh-1 Sample Collected 11/28/05, Reported App. I Parameters  
 2/15/2006  P2 Progress Report    
 4/10/2006  Waste Tire Processing Facility Report Due   1st Qtr  
 4/10/2006  Waste Tire Processing Facility Report Due    
 4/24/2006  Gas Monitoring Report   Quality Second Quarter  
 4/24/2006  Gas Monitoring Report   Sampled 3-10-06  
 7/13/2006  Waste Tire Processing Facility Report Due   2nd Quarter 2006 (Ltr 7-11-06)  
 7/19/2006  Groundwater Report   Water Quality Monitoring Evaluation Report  
 7/24/2006  Leachate Report    
 7/24/2006  Leachate Report   Quality Report Received On 7/24/06 But Not Yet Due.  
 7/24/2006  Groundwater Monitoring Report   Sampled 6/5/06 | Exceedances Reported For Ph, Iron  
 8/15/2006  P2 Progress Report    
 8/16/2006  P2 Progress Report    
 8/16/2006  P2 Progress Report    
 8/16/2006  Renewal Application Due    
 8/16/2006  P2 Progress Report    
 8/16/2006  P2 Progress Report    
 8/16/2006  P2 Progress Report    
 8/16/2006  P2 Progress Report    
 8/16/2006  P2 Progress Report    
 8/16/2006  P2 Progress Report    
 8/16/2006  P2 Progress Report    
 8/17/2006  P2 Progress Report    
 8/17/2006  P2 Progress Report    
 8/17/2006  Financial Assurance Documents    
 8/17/2006  P2 Progress Report    
 8/17/2006  P2 Progress Report    
 8/17/2006  P2 Progress Report    
 8/17/2006  Financial Assurance Documents    
 8/17/2006  P2 Progress Report    
 8/17/2006  Financial Assurance Documents    
 8/17/2006  P2 Progress Report    
 8/17/2006  P2 Progress Report    
 8/17/2006  P2 Progress Report    
 8/17/2006  Financial Assurance Documents   Sgm Inf.Adj. 08/17/06  
 8/17/2006  P2 Progress Report    
 8/17/2006  Financial Assurance Documents    
 9/1/2006  Permit Condition Or Consent Order/Response Due   Capacity Calculations  
 9/22/2006  Gas Monitoring Report    
 10/5/2006  Waste Tire Processing Facility Report Due    
 1/5/2007  Groundwater Report    
 1/6/2007  Gas Monitoring Report    
 1/6/2007  Gas Monitoring Report    
 1/6/2007  Gas Monitoring Report    
 1/6/2007  Permit Condition Or Consent Order/Response Due   Capacity Calculations  
 1/6/2007  Permit Condition Or Consent Order/Response Due   Semi-Annual Grnd/Surface Water Rprt  
 1/6/2007  Gas Monitoring Report    
 1/6/2007  Gas Monitoring Report    
 1/6/2007  Leachate Report   Generation  
 1/6/2007  Leachate Report   Generation  
 1/6/2007  Permit Condition Or Consent Order/Response Due   Capacity Calculations  
 1/6/2007  Permit Condition Or Consent Order/Response Due   Topo Survey, Certification  
 1/6/2007  Permit Condition Or Consent Order/Response Due   Semi-Annual Grnd/Surface Water Montrng Rprt  
 1/6/2007  Gas Monitoring Report    
 1/6/2007  Permit Condition Or Consent Order/Response Due   Semi-Annual Grnd/Surface Water Montrng Rprt  
 1/6/2007  Permit Condition Or Consent Order/Response Due   Semi-Annual Ground/Surface Water Montrng Report  
 1/6/2007  Leachate Report   Generation  
 1/6/2007  Gas Monitoring Report    
 1/6/2007  Permit Condition Or Consent Order/Response Due   Semi-Annual Grnd/Surface Water Montrng Rprt  
 1/8/2007  Gas Monitoring Report   Recv'D Report On Day Of Insp | Sampled 6-5-06  
 1/8/2007  Waste Tire Processing Facility Report Due    
 1/8/2007  Leachate Report   Generation/Recv'D Report On Day Of Insp  
 1/8/2007  Landfill Inspection (Class 1)    
 1/8/2007  Material Recovery/Recycler Inspection.    
 1/11/2007  Groundwater Monitoring Report   Semi-Annual, Groundwater Sampled 11/15/06 | Exceedances Repoted For Ph, Arsenic, Iron  
 1/16/2007  Landfill Inspection (Class 1)    
 1/18/2007  Groundwater Monitoring Report   Semi-Annual, Groundwater And Surface Water Monitoring Reports | No Surface Water, Mam  
 1/24/2007  Gas Monitoring Report   Mam  
 2/16/2007  Waste Tire Processing Facility Report Due    
 4/13/2007  Waste Tire Processing Facility Report Due    
 4/18/2007  Gas Monitoring Report   Sjp-No Exceedances  
 6/5/2007  Groundwater Monitoring Report   Initial Sampling Event At Mw-10, Mw-11 And Mw-12 Conducted 4/5/07 | Exceedances Reported For Ph  
 6/5/2007  As Built Drawings   Sjp-Certification Of Phase Ii, Section I Rec'D; Rai Sent 7/3/07  
 6/25/2007  Waste Tire Small Processor Inspection.   Ng, Sp - Excess Vegetation, Not Enough Buffer, Mosquito Control  
 6/25/2007  Material Recovery/Recycler Inspection.   Ng, Sp - Small Leachate Ponding, Floor Indentation  
 6/25/2007  Landfill Inspection (Class 1)   Ng, Sp - Cover,Compaction, Leachate Tank Maintenance, Size Of Working Face,Hhw Management,  
 6/29/2007  Gas Monitoring Report   Samples From 6-8-07  
 7/2/2007  Leachate Report   Generation  
 7/2/2007  Leachate Report   Leachate Generation  
 7/2/2007  Leachate Report   Generation  
 7/3/2007  Monitoring Data Results Reviewed   Gw - 6/5/07 | Jrm  
 7/3/2007  Financial Assurance Documents   Apprvd 07032007  
 7/13/2007  Waste Quantity Report   Wt Wqr, Mam  
 7/19/2007  Groundwater Monitoring Report   Surface Water Montrng Rprt Semi Annual | Submitted With Gw  
 7/19/2007  Leachate Report   Quality | Sampled 6/22/07 - Ng  
 7/19/2007  Groundwater Monitoring Report   Semi-Annual, Groundwater Sampled 6/21 & 6/22/07 | Exceedances Reported For Ph, Iron, Lead  
 7/24/2007  Financial Assurance Documents   Cost Estimates & Proof Of Funding  
 7/24/2007  Waste Tire Processing Facility Report Due    
 7/24/2007  Waste Tire Processing Facility Report Due   Quantity  
 7/24/2007  Waste Tire Processing Facility Report Due   Quantity  
 7/24/2007  Waste Tire Processing Facility Report Due   Quantity  
 7/24/2007  Waste Tire Processing Facility Report Due   Quantity  
 7/24/2007  Financial Assurance Documents   Cost Est & Proof Of Funding  
 7/24/2007  Waste Tire Processing Facility Report Due   Quantity  
 7/24/2007  Waste Tire Processing Facility Report Due   Quantity  
 7/24/2007  Waste Tire Processing Facility Report Due   Quantity  
 7/24/2007  Waste Tire Processing Facility Report Due   Quantity  
 7/24/2007  Waste Tire Processing Facility Report Due   Quantity  
 7/24/2007  Waste Tire Processing Facility Report Due   Quantity  
 7/24/2007  Waste Tire Processing Facility Report Due   Quantity  
 7/24/2007  Waste Tire Processing Facility Report Due   Quantity  
 7/24/2007  Waste Tire Processing Facility Report Due   Quantity  
 7/24/2007  Financial Assurance Documents   Cost Est & Proof Of Funding  
 7/24/2007  Waste Tire Processing Facility Report Due   Quantity  
 7/24/2007  Financial Assurance Documents   Cost Est & Proof Of Funding  
 7/24/2007  Waste Tire Processing Facility Report Due   Quantity  
 7/24/2007  Waste Tire Processing Facility Report Due   Quantity  
 7/24/2007  Financial Assurance Documents   Cost Est & Proof Of Funding  
 7/24/2007  Financial Assurance Documents   Cost Est & Proof Of Funding  
 7/24/2007  Waste Tire Processing Facility Report Due   Quantity  
 7/26/2007  Waste Tire Small Processor Inspection.   Minor Ponded Water  
 7/26/2007  Landfill Inspection (Class 1)   Cover Issues | Response And Pictures Sent - Ncl Issued Ng  
 7/26/2007  Material Recovery/Recycler Inspection.    
 7/26/2007  Material Recovery/Recycler Inspection.   Not Running During Inspection, Bypassing To Landfill  
 7/27/2007  Leachate Report   Quality  
 8/16/2007  Non-Compliance Letter Issued   Letter Addressing Issues And Requesting A Meeting -Ng  
 8/30/2007  Gas Monitoring Report   Mam, No Exceedences  
 8/31/2007  Permit Condition Or Consent Order/Response Due   Topo Survey, Certification | Sjp  
 8/31/2007  Permit Condition Or Consent Order/Response Due   Capacity Calculations  
 9/7/2007  Financial Assurance Documents   Cost Est Apprvd. No Proof Of Funding | Infl Adj Apprvd Sgm 07032007  
 10/1/2007  Groundwater Monitoring Report   Supplemental Initial Sampling At Mw-10/-11/-12 (Omitted Parameters), Sampled 7/30 & 8/2/07 | Exceedance Reported For Iron  
 10/15/2007  Waste Tire Processing Facility Report Due   Mam  
 10/29/2007  Monitoring Data Results Reviewed   Gw - 1/15/05 | Jrm  
 10/29/2007  Monitoring Data Results Reviewed   Gw - 1/15/06 | Jrm  
 10/29/2007  Monitoring Data Results Reviewed   Gw - 7/15/05 | Jrm  
 10/30/2007  Monitoring Data Results Reviewed   Gw - 7/15/06 | Jrm  
 10/30/2007  Monitoring Data Results Reviewed   Gw - 1/15/07 | Jrm  
 10/30/2007  Monitoring Data Results Reviewed   Gw - 7/15/07 | Jrm  
 10/30/2007  Monitoring Data Results Reviewed   Gw - 10/1/07 | Jrm  
 11/28/2007  Landfill Inspection (Class 1)   Exposed Waste From Improper Filling & Erosion- Ng Report Issued 1-9-08  
 11/28/2007  Material Recovery/Recycler Inspection.   Sump Pump In Loading Ramp Malfunctioning - Ng  
 11/28/2007  Waste Tire Small Processor Inspection.    
 12/3/2007  Leachate Report   Leachate Generation  
 1/11/2008  Waste Tire Processing Facility Report Due   Mam  
 1/15/2008  Leachate Report   Quantity  
 1/15/2008  Leachate Report   Quarterly Quantity | Submitted - 4/16/08  
 3/26/2008  Gas Monitoring Report   Sampling Event 3/6/08  
 4/11/2008  Waste Tire Small Processor Inspection.    
 4/11/2008  Material Recovery/Recycler Inspection.    
 4/11/2008  Landfill Inspection (Class 1)   Inadequate Cover, Waste In Water- Ng  
 4/16/2008  Leachate Report   Generation | 1st Quarter  
 4/16/2008  Waste Tire Processing Facility Report Due   Quantity  
 7/31/2008  Site Inspection   Waste Processing Facility - During This Inspection The Mrf Was Not Operating. When Operating, The Mrf Is Bailing Cardboard Only.  
 11/7/2008  Site Inspection   Overall The Facility Has Much Improved. Phase I Has Sufficient Cover And Grading. Phase Ii Is Being Filled In Sequence, And The Working Face Kept A Manageable Size. The Leachate Collection System Is Being Properly Operated And The Metering Equipme  
 12/15/2008  Leachate Report    
 12/15/2008  Gas Monitoring Report    
 12/15/2008  Waste Quantity Report    
 12/15/2008  Gas Monitoring Report    
 12/15/2008  Waste Quantity Report    
 12/15/2008  Monitoring Data Results    
 1/7/2009  Financial Assurance Documents    
 3/11/2009  Monitoring Data Results    
 3/11/2009  Waste Quantity Report    
 3/11/2009  Gas Monitoring Report    
 3/11/2009  Gas Monitoring Report    
 3/11/2009  Groundwater Monitoring Report    
 3/12/2009  Site Inspection    
 3/16/2009  Leachate Report    
 8/4/2009  Submittal Received By Department    
 8/4/2009  Waste Quantity Report    
 8/4/2009  Waste Quantity Report    
 8/4/2009  Groundwater Report    
 8/4/2009  Groundwater Monitoring Report    
 8/6/2009  Site Inspection   1.10 - Please Be Advised That The Permit Required, Inflation Adjusted Cost Estimates For Financial Assuarance For 2009 Must Be Submitted By September 1, 2009. | 1.2 - At The Time Of Inspection, The Required Quarterly Leachate Generation Reports Could  
 12/15/2009  Site Inspection    
 12/22/2009  Gas Monitoring Report    
 12/22/2009  Waste Quantity Report    
 4/13/2010  Leachate Report    
 4/13/2010  Submittal Received By Department    
 4/13/2010  Leachate Report    
 4/13/2010  Groundwater Monitoring Report    
 4/15/2010  Site Inspection    
 6/17/2010  Gas Monitoring Report    
 6/17/2010  Gas Monitoring Report    
 6/17/2010  Gas Monitoring Report    
 6/17/2010  Submittal Received By Department    
 9/2/2010  Site Inspection   Item 1.4 - Water Quality Determinations Have Not Been Made At This Time. Ng  
 9/14/2010  Gas Monitoring Report    
 9/14/2010  Leachate Report    
 11/22/2010  Gas Monitoring Report    
 1/3/2011  Site Inspection    
 2/18/2011  Financial Assurance Documents    
 3/24/2011  Site Inspection    
 4/25/2011  Gas Monitoring Report    
 7/18/2011  Financial Assurance Documents    
 7/29/2011  Site Inspection   Item 1.7 - Groundwater Sampling Data Is Under Review  
 11/28/2011  Site Inspection   1.7 - Ground Water Data For The Facility Is Under On-Going Review.  
 1/4/2012  Gas Monitoring Report    
 1/4/2012  Gas Monitoring Report    
 3/30/2012  Site Inspection   Item 1.7 - Groundwater Monitoring Data Is Under Review.  
 7/25/2012  Gas Monitoring Report    
 7/27/2012  Site Inspection   Item 1.7 - Groundwater Monitoring Data Are Under An On-Going Review  
 9/11/2012  Groundwater Monitoring Report    
 9/14/2012  Leachate Report    
 9/14/2012  Leachate Report    
 9/17/2012  Groundwater Monitoring Report    
 9/17/2012  Leachate Report    
 9/17/2012  Groundwater Monitoring Report    
 9/17/2012  Groundwater Monitoring Report    
 9/17/2012  Groundwater Monitoring Report    
 12/27/2012  Site Inspection   1.7 - Water Quality Data Is Under On-Going Review.  
 7/11/2013  Site Inspection   Item 1.6 - Groundwater Monitoring Data Is Under On-Going Review. | 7/11/2013 -During This Inspection The Working Face Observed Was Larger Than Is Typical During Normal Facility Operations. According To Facility Staff, Facility Operations Had Been In  
 7/12/2013  Groundwater Monitoring Report    
 7/12/2013  Groundwater Monitoring Report    
 7/12/2013  Leachate Report    
 7/12/2013  Groundwater Monitoring Report    
 7/12/2013  Groundwater Monitoring Report    
 7/12/2013  Groundwater Monitoring Report    
 7/12/2013  Groundwater Monitoring Report    
 7/12/2013  Groundwater Monitoring Report    
 7/12/2013  Groundwater Monitoring Report    
 7/12/2013  Groundwater Monitoring Report    
 7/12/2013  Groundwater Monitoring Report    
 11/24/2013  Site Inspection   Item 1.6 - Groundwater Monitoring Data Is Under On-Going Review. | Based On The Activities Observed During The Inspection, Your Facility May Be Required To Obtain Coverage Under The Multi-Sector Generic Permit For Stormwater Discharge Associated Wit  
 1/13/2015  Site Inspection   On December 30, 2014, The Department Received A Complaint Stating That Trash At The Landfill Was Not Being Covered On The Weekends. A Level Of Service Inspection Of The Facility Was Performed On January 13, 2015. Based On Discussion With A Landfill  
 5/5/2015  Gas Monitoring Report    
 5/14/2015  Gas Monitoring Report    
 5/14/2015  Gas Monitoring Report    
 5/14/2015  Gas Monitoring Report    
 5/14/2015  Gas Monitoring Report    
 5/14/2015  Gas Monitoring Report    
 5/14/2015  Gas Monitoring Report    
 5/14/2015  Gas Monitoring Report    
 8/5/2015  Groundwater Monitoring Report    
 8/5/2015  Groundwater Monitoring Report    
 8/5/2015  Groundwater Monitoring Report    
 8/5/2015  Gas Monitoring Report    
 8/10/2015  Groundwater Monitoring Report    
 10/8/2015  Gas Monitoring Report    
 1/10/2016  Cost Estimates    
 1/19/2016  Gas Monitoring Report    
 2/27/2016  Site Inspection   The Department Received A Complaint From Mr. Henry Kuhlman On February 22, 2016, That The Hardee County Landfill Was Uncovered On February 21, 2016. The Department Office Of Emergency Response Went To The Facility On Saturday, February 27, 2016 At 3  
 4/4/2016  Gas Monitoring Report    
 5/10/2016  Groundwater Monitoring Report    
 6/17/2016  Gas Monitoring Report    
 6/24/2016  Site Inspection   The Department Conducted An Inspection Of The Facility On December 15, 2015. At This Time The Facility Was Noted As Being In Compliance; However, Prior To The Inspection Report Being Sent Out The Department Received A Complaint From Mr. Henry Kuhlma  
 8/16/2016  Gas Monitoring Report    
 10/27/2016  Groundwater Monitoring Report    
 1/22/2017  Gas Monitoring Report    
 1/25/2017  Site Inspection   1.6 - Groundwater Monitoring Data Was Reviewed For Groundwater Standard Exceedances, Completeness, And Quality Assurance/Quality Control (Qa/Qc); However, A Review Of Historical Data Trending Was Not Performed. 2.20 – No Off-Site Litter Was Observed  
 2/15/2017  Groundwater Monitoring Report    
 3/27/2017  Gas Monitoring Report    
 7/27/2017  Gas Monitoring Report    
 9/21/2017  Gas Monitoring Report    
 12/18/2017  Gas Monitoring Report    
 1/5/2018  Site Inspection   The Department'S "Draft" Animal Carcass Disposal Guidance Document Was Discussed With The Facility Operator During The Inspection. Two Items Of Unacceptable Waste Were Observed On The Working Face At The Time Of The Inspection. The Department Recei  
 1/24/2018  Groundwater Monitoring Report    
 1/24/2018  Groundwater Monitoring Report    
 2/2/2018  Site Inspection   Facility Was Inspected For Ddms Closure On 2/2/18. Facility Did Not Have Any Disaster Debris Left On-Site And Appeared Clean And In-Compliance. Ddms Closure Confirmation Email Sent On 2/6/18 Following The Inspection.  
 3/8/2018  Gas Monitoring Report    
 8/2/2018  Gas Monitoring Report    
 8/2/2018  Groundwater Monitoring Report    
 9/13/2018  Gas Survey    
 2/22/2019  Site Inspection   Item 1.5: The Field Sampling Log Data For Samples Collected At Monitoring Wells Mw-1, Mw-10r And Mw-11 Indicates That The Last Three Consecutive Readings For These Samples Did Not Meet The Stabilization Criteria Per The Department'S Guidelines For Gr  
 3/26/2019  Written Compliance Assitance Offer   Cao Letter Mailed To Facility On March 21, 2019.  

Violation History

Vio# Area Regulation Opened
By
Date
Determined
Completed ETA Act Act Date Regulation Text Excerpt   (mouse over for more text)
AOC    62-701.320(15)(a), 62-701.500(2), 62-701.500(3), 62-701.500(4), 62-701.500(6)(a), 62-701.500(8)(f), 62-701.500(8)(g)  Gaskin_N  8/1/2008  11/13/2008    1577 8/1/2008   Owners and operators of facilities shall ensure that operators employed at the facility are properly trained to operate the facility, and that spotters are properly trained to identify and properly manage any hazardous or prohibited materials which a
   62-701.500(2)(f)  Gaskin_N  8/1/2008  11/13/2008    1577 8/1/2008   Method and sequence of filling waste;
AOC    62-701.500(9), 62-701.530(2)  Gaskin_N  8/1/2008  11/6/2008    1577 8/1/2008   Gas monitoring. All landfills that have received degradable wastes shall implement a gas management system to meet the requirements of Rule 62-701.530, F.A.C., Monitoring requirements. Owners or operators of solid waste disposal units at landfills th
AOC    62-701.530(2)  Gaskin_N  8/1/2008  11/6/2008    1577 8/1/2008   Monitoring requirements. Owners or operators of solid waste disposal units at landfills that have received degradable waste shall implement a routine gas monitoring program to ensure that the design requirements of subparagraphs (1)(a)1. and 3. of th
AOC    62-701.500(2)(f)  Gaskin_N  8/8/2008  11/13/2008    1577 8/8/2008   Method and sequence of filling waste;
AOC    62-701.500(7)(d)  Gaskin_N  8/8/2008  11/13/2008    1577 8/8/2008   The working face shall be only wide enough to accommodate vehicles discharging waste, and to minimize the exposed area and unnecessary use of cover material.
AOC    62-701.500(7)(f)  Gaskin_N  8/8/2008  11/13/2008    1577 8/8/2008   An intermediate cover in addition to the six-inch initial cover shall be applied and maintained within seven days of cell completion if additional solid waste will not be deposited within 180 days of cell completion. The landfill operator may remove
   62-701.500(7)(f)  Gaskin_N  8/8/2008  11/13/2008    1577 8/8/2008   An intermediate cover in addition to the six-inch initial cover shall be applied and maintained within seven days of cell completion if additional solid waste will not be deposited within 180 days of cell completion. The landfill operator may remove
AOC    62-701.320(1)  Gaskin_N  8/12/2008  11/13/2008    1577 8/12/2008   Permit requirements. Except as otherwise provided in this chapter, no solid waste management facility shall be constructed, operated, maintained, modified, or closed without a permit issued by the Department, or by an approved local program acting un
   62-701.400(9)(c), 62-701.500(10)  Gaskin_N  8/12/2008  11/13/2008    1577 8/12/2008   Stormwater management systems shall be designed to avoid mixing of stormwater with leachate. Stormwater or other surface water which comes into contact with the landfilled solid waste or mixes with leachate shall be considered leachate and is subject
AOC    62-701.500(10)  Gaskin_N  8/12/2008  11/13/2008    1577 8/12/2008   Stormwater system management. Stormwater management systems shall be operated and maintained as necessary to meet the requirements of subsection 62-701.400(9), F.A.C.
AOC    62-701.500(2)  Gaskin_N  8/12/2008  11/13/2008    1577 8/12/2008   Operation plan. Each landfill owner or operator shall have an operational plan that provides written, detailed instructions for the daily operation of the landfill. The operation plan shall be kept at or near the landfill facility and shall be access
   62-701.500(2)(j), 62-701.500(8)(b), 62-701.500(8)(h)  Gaskin_N  8/12/2008  11/13/2008    1577 8/12/2008   Maintaining and cleaning the leachate collection system., The landfill operator is responsible for the operation of the leachate collection and removal system and for maintaining the system as designed for the design period. Leachate shall be collect
   62-701.500(7)(j)  Gaskin_N  8/12/2008  11/13/2008    1577 8/12/2008   Erosion control measures shall be employed to correct any erosion which exposes waste or causes malfunction of the storm water management system. Such measures shall be implemented within three days of occurrence. If the erosion cannot be corrected w
AOC    62-701.510(2)(b), 62-701.620(9)  Gaskin_N  8/12/2008  5/5/2009    1577 8/12/2008   The water quality monitoring system shall be installed and consist of: a sufficient number of ground water wells installed at appropriate locations and depths to yield ground water samples from the uppermost aquifer, as well as other aquifers reasona
AOC    62-701.710(3)(b)  Gaskin_N  8/12/2008  11/13/2008    1577 8/12/2008   The facility shall be designed with a leachate control system to prevent discharge of leachate and mixing of leachate with stormwater, and to minimize the presence of standing water.
AOC    62-701.500(2)(f)  Gaskin_N  5/5/2009  8/28/2009    4161 5/5/2009   Method and sequence of filling waste;
AOC    62-701.300(4), 62-701.300(5), 62-701.300(6), 62-701.300(8)(a), 62-701.300(8)(c), 62-701.300(8)(d), 62-701.300(8)(e), 62-701.300(9), 62-701.300(10), 62-701.300(11)(a), 62-701.300(11)(b)  Gaskin_N  8/28/2009  12/30/2009    5801 8/28/2009   Hazardous waste. No hazardous waste shall be disposed of in a solid waste management facility unless such facility is permitted pursuant to Chapter 62-730, F.A.C., PCBs. Disposal of liquids containing a polychlorinated biphenyl (PCB), or non-liquid P
AOC    62-701.500(2)  Gaskin_N  8/28/2009  12/30/2009    5801 8/28/2009   Operation plan. Each landfill owner or operator shall have an operational plan that provides written, detailed instructions for the daily operation of the landfill. The operation plan shall be kept at or near the landfill facility and shall be access
AOC    62-701.500(7)(f)  Gaskin_N  8/28/2009  12/30/2009    5801 8/28/2009   An intermediate cover in addition to the six-inch initial cover shall be applied and maintained within seven days of cell completion if additional solid waste will not be deposited within 180 days of cell completion. The landfill operator may remove
AOC    62-701.530(2)  Gaskin_N  12/22/2009  6/17/2010    7145 12/22/2009   Monitoring requirements. Owners or operators of solid waste disposal units at landfills that have received degradable waste shall implement a routine gas monitoring program to ensure that the design requirements of subparagraphs (1)(a)1. and 3. of th
AOC    62-701.500(2)(j), 62-701.500(8)(b), 62-701.500(8)(h)  Gaskin_N  12/30/2009  6/17/2010    7145 12/30/2009   Maintaining and cleaning the leachate collection system., The landfill operator is responsible for the operation of the leachate collection and removal system and for maintaining the system as designed for the design period. Leachate shall be collect
AOC    62-701.500(2)(f)  Gaskin_N  6/17/2010  4/25/2011    8434 6/17/2010   Method and sequence of filling waste;
AOC    62-701.500(2)(f), 62-701.730(7)(a)  Gaskin_N  9/14/2010  4/20/2011    10293 9/14/2010   Method and sequence of filling waste;, An operation plan describing the facility operations and maintenance, emergency and contingency plans, and types of equipment that will be used shall be kept at the facility at all times and made available for i
AOC    62-701.500(8)(a), 62-701.510(6)(c)  Gaskin_N  9/14/2010  10/5/2011    10293 9/14/2010   The landfill operator is responsible for leachate level monitoring, sampling, analysis of the landfill leachate, and for providing copies of the leachate analysis to the Department., Routine leachate sampling.
AOC    62-701.500(9), 62-701.530(2)  Gaskin_N  9/14/2010  4/20/2011    10293 9/14/2010   Gas monitoring. All landfills that have received degradable wastes shall implement a gas management system to meet the requirements of Rule 62-701.530, F.A.C., Monitoring requirements. Owners or operators of solid waste disposal units at landfills th
AOC    62-701.530(2)(c)  Gaskin_N  9/14/2010  4/20/2011    10293 9/14/2010   All ambient monitoring points and soil monitoring probes shall be sampled quarterly for concentrations of combustible gases, and the results reported to the Department no later than 15 days after the end of the quarter in which the monitoring occurre
AOC    62-701.500(2)  Gaskin_N  1/5/2011  4/20/2011    11840 1/5/2011   Operation plan. Each landfill owner or operator shall have an operational plan that provides written, detailed instructions for the daily operation of the landfill. The operation plan shall be kept at or near the landfill facility and shall be access
AOC    62-701.500(2)(f)  Gaskin_N  1/5/2011  4/20/2011    11840 1/5/2011   Method and sequence of filling waste;
AOC    62-713.400(3), 62-701.510(2), 62-701.730(8), 62-701.730(10)  Gaskin_N  1/5/2011  4/26/2011    11840 1/5/2011   Water quality monitoring plan. A water quality monitoring plan which meets the requirements of Rule 62-701.510 and Chapter 62-522, F.A.C. and is based upon the hydrogeological investigation required in paragraph 62-713.300(3)(c), F.A.C., shall be inc
AOC    62-701.500(4), 62-701.500(13)(c)  Gaskin_N  4/20/2011  9/21/2011    150721 4/20/2011   Waste records., Maintain an annual estimate of the remaining life and capacity in cubic yards of the existing, constructed landfill and remaining capacity and site life of other permitted areas not yet constructed. The annual estimate shall be based
   62-701.320(1), 403.161  Gaskin_N  4/22/2011  9/21/2011    150721 4/22/2011   Permit requirements. Except as otherwise provided in this chapter, no solid waste management facility shall be constructed, operated, maintained, modified, or closed without a permit issued by the Department, or by an approved local program acting un
AOC    62-713.400(3), 62-701.510(2), 62-701.730(8), 62-701.730(10)  Gaskin_N  1/4/2012  1/8/2013    154409 1/4/2012   Water quality monitoring plan. A water quality monitoring plan which meets the requirements of Rule 62-701.510 and Chapter 62-522, F.A.C. and is based upon the hydrogeological investigation required in paragraph 62-713.300(3)(c), F.A.C., shall be inc
AOC    62-701.530(2)(c)  Gaskin_N  8/6/2012  7/23/2013    157564 8/6/2012   All ambient monitoring points and soil monitoring probes shall be sampled quarterly for concentrations of combustible gases, and the results reported to the Department no later than 15 days after the end of the quarter in which the monitoring occurre
   62-701.500(2)  Tafuni_S  2/28/2016  7/2/2016    169857 2/28/2016   Operation plan. Each landfill owner or operator shall have an operational plan that provides written, detailed instructions for the daily operation of the landfill. The operation plan shall be kept at or near the landfill facility and shall be access
   62-701.500(7)(e)  Tafuni_S  2/28/2016  7/2/2016    169857 2/28/2016   Initial cover shall be applied and maintained at landfills in order to minimize any adverse environmental, safety, or health effects such as those resulting from birds, unauthorized wastes, blowing litter, odors, vectors, or fires. The minimum freque
   62-701.300(4), 62-701.300(5), 62-701.300(6), 62-701.300(8)(a), 62-701.300(8)(c), 62-701.300(8)(d), 62-701.300(8)(e), 62-701.300(10), 62-701.300(11)(a), 62-701.300(11)(b), 62-701.300(14), 62-701.520(3), 62-701.520(5)(a), 62-701.520(5)(b), 62-701.730(19), 62-701.520(5)(c)  Black_Ar  3/8/2019  6/6/2019    178698 3/8/2019   Hazardous waste. No hazardous waste shall be disposed of in a solid waste management facility unless such facility is permitted pursuant to Chapter 62-730, F.A.C., PCBs. Disposal of liquids containing a polychlorinated biphenyl (PCB), or non-liquid P
AOC    62-701.320(1), 403.161  Black_Ar  3/8/2019  9/6/2019    178698 3/8/2019   Permit requirements. Except as otherwise provided in this chapter, no solid waste management facility shall be constructed, operated, maintained, modified, or closed without a permit issued by the Department, or by an approved local program acting un
AOC    62-701.500(10), 62-701.400(9)(b)  Black_Ar  3/8/2019  9/12/2019    178698 3/8/2019   Stormwater system management. Stormwater management systems shall be operated and maintained as necessary to meet the requirements of subsection 62-701.400(9), F.A.C., Stormwater or other surface water which comes into contact with the landfilled sol
   62-701.500(2)  Black_Ar  3/8/2019  9/6/2019    178698 3/8/2019   Operation plan. Each landfill owner or operator shall have an operational plan that provides written, detailed instructions for the daily operation of the landfill. The operation plan shall be kept at or near the landfill facility and shall be access
AOC    62-701.500(2)(j), 62-701.500(8)(b), 62-701.500(8)(h)  Black_Ar  3/8/2019  9/6/2019    178698 3/8/2019   Maintaining and cleaning the leachate collection system., The landfill operator is responsible for the operation of the leachate collection and removal system and for maintaining the system as designed for the design period. Leachate shall be collect
AOC    62-701.500(4), 62-701.500(13)(c)  Black_Ar  3/8/2019  5/24/2019    178698 3/8/2019   Waste records., Maintain an annual estimate of the remaining life and capacity in cubic yards of the existing, constructed landfill and remaining capacity and site life of other permitted areas not yet constructed. The annual estimate shall be based
AOC    62-701.500(7)(e)  Black_Ar  3/8/2019  6/6/2019    178698 3/8/2019   Initial cover shall be applied and maintained at landfills in order to minimize any adverse environmental, safety, or health effects such as those resulting from birds, unauthorized wastes, blowing litter, odors, vectors, or fires. The minimum freque
AOC    62-701.500(7)(f)  Black_Ar  3/8/2019  6/6/2019    178698 3/8/2019   An intermediate cover in addition to the six-inch initial cover shall be applied and maintained within seven days of cell completion if additional solid waste will not be deposited within 180 days of cell completion. The landfill operator may remove
AOC    62-711.500(3), 62-713.600(6)(b), 62-713.600(6)(c), 62-701.630(4), 62-701.730(11)(a), 62-701.710(7)(a), 62-701.710(1)(d)1.  Black_Ar  3/12/2019  9/6/2019    178698 3/12/2019   Owners or operators of waste tire sites shall provide closing cost estimates for the quantity of waste tires on their site or the quantity of waste tires that they are permitted to have on their site, whichever is greater. The cost estimate shall be
AOC    62-713.400(3), 62-701.510(2), 62-701.730(8), 62-701.730(10)  Black_Ar  3/13/2019  9/6/2019    178698 3/13/2019   Water quality monitoring plan. A water quality monitoring plan which meets the requirements of Rule 62-701.510 and Chapter 62-522, F.A.C. and is based upon the hydrogeological investigation required in paragraph 62-713.300(3)(c), F.A.C., shall be inc