Date Done Activity Type Activity Comments   (mouse over for more text) ETA Link
 8/10/1993  Class I Landfill Inspection.    
 1/10/1994  Draft Consent Order Issued   Response To Draft Co By County  
 3/25/1994  Landfill Inspection (Class 1)    
 3/25/1994  Permit Condition Or Consent Order/Response Due   Completion Of In-Kind Work On Rails-To-Trails Project  
 3/25/1994  Consent Order Executed   Executed Consent Order  
 7/7/1994  Landfill Inspection (Class 1)   Kbf  
 10/4/1994  Case Closed By District   Consent Order Conditions Complied With. Case Closed  
 3/6/1995  Permit Condition Or Consent Order/Response Due   Leachate Storage Impoundment To Be Replaced Or Modified  
 4/11/1995  Short Form Consent Order Issued    
 4/14/1995  Groundwater Monitoring Report    
 4/28/1995  Waste Tire Processing Facility Report Due   Quarterly  
 5/5/1995  Case Closed By District    
 7/3/1995  Groundwater Monitoring Report    
 7/3/1995  Permit Condition Or Consent Order/Response Due   Effluent Test Results  
 7/17/1995  Renewal Application Due    
 7/26/1995  Leachate Report   Generation  
 7/31/1995  Waste Tire Processing Facility Report Due   Quarterly  
 8/1/1995  Landfill Inspection (Class 1)   Pelz, Hinson, Watson  
 10/16/1995  Waste Tire Processing Facility Report Due   Quarterly  
 10/23/1995  Permit Condition Or Consent Order/Response Due   Effluent Test Results  
 10/23/1995  Leachate Report   Generation  
 10/24/1995  Permit Condition Or Consent Order/Response Due   Site Improvements Completed  
 1/8/1996  Waste Tire Processing Facility Report Due    
 1/8/1996  Waste Quantity Report    
 1/29/1996  Permit Condition Or Consent Order/Response Due   Effluent Test Results  
 2/12/1996  Leachate Report    
 3/29/1996  Groundwater Monitoring Report    
 4/20/1996  Waste Tire Processing Facility Report Due    
 5/14/1996  Landfill Inspection (Class 1)   Ford, Morgan, Nichols  
 5/14/1996  Waste Tire Processing Facility Inspection.   Morgan, Nichols, Ford  
 5/20/1996  Permit Condition Or Consent Order/Response Due   Construction Complete  
 6/6/1996  Permit Condition Or Consent Order/Response Due   Financial Assurance  
 7/22/1996  Waste Tire Processing Facility Report Due    
 10/9/1996  Waste Tire Processing Facility Inspection.   Ford  
 10/9/1996  Landfill Inspection (Class 1)   Ford  
 10/23/1996  Groundwater Monitoring Report    
 12/19/1996  Gas Monitoring Report    
 1/8/1997  Waste Tire Processing Facility Report Due    
 1/13/1997  Leachate Report   Also Sludge Analyses & Effluent  
 2/6/1997  Waste Tire Processing Facility Inspection.   Nichols  
 2/6/1997  Landfill Inspection (Class 1)   Nichols  
 2/13/1997  Permit Condition Or Consent Order/Response Due   Change Property Record For Extended Zod  
 3/21/1997  Groundwater Monitoring Report   Also Qap Doc. (No Submittal)  
 3/27/1997  Groundwater Monitoring Report    
 4/28/1997  Waste Tire Processing Facility Report Due    
 4/28/1997  Submittal Received By Department   Fire Safety Survey  
 5/2/1997  Gas Survey    
 5/22/1997  Landfill Inspection (Class 1)   Nichols; Ford Looked At Construction (Day Fire On Liner) Need Little More Cover In Some Areas But Not Terrible  
 5/27/1997  Leachate Report   Effluent  
 7/30/1997  Leachate Report   Incl. Appendix Ii Also Effluent.  
 8/11/1997  Waste Tire Processing Facility Report Due    
 8/13/1997  Annual Groundwater Report   (Biannual)  
 10/10/1997  Financial Assurance Documents   Pelz-Rev Ests Rec'D, Rai Sent 10-29-97; Approved 2-2-98  
 10/10/1997  Financial Assurance Documents   Pelz-Rev. Ests Rec'D, Rai Sent 10-29-97;Approved 2-2-98  
 10/17/1997  Leachate Report   Effluent  
 10/17/1997  Groundwater Monitoring Report   Also Qap  
 10/17/1997  Leachate Report   Also Sludge Analyses & Effluent  
 10/21/1997  Landfill Inspection (Class 1)   Nichols(Tour Day W/Talla Staff); Sw Ditches Overgrown  
 10/21/1997  Waste Tire Processing Facility Inspection.   Nichols; Currently Not Even Doing Processing On Site, Acting As A Wtcc  
 10/27/1997  Waste Tire Processing Facility Report Due    
 11/5/1997  Gas Monitoring Report    
 12/10/1997  Landfill Inspection (Class 1)   Nichols; Observed Holes In Cap  
 12/26/1997  Gas Monitoring Report    
 1/15/1998  Waste Tire Processing Facility Report Due    
 1/26/1998  Gas Monitoring Report    
 4/8/1998  Waste Tire Processing Facility Report Due    
 4/13/1998  Leachate Report   Effluent- Jan/Mar 1998  
 4/15/1998  Submittal Received By Department   Fire Safety Survey  
 5/7/1998  Gas Monitoring Report    
 5/7/1998  Gas Monitoring Report   Apr,May,June 1998  
 6/8/1998  Landfill Inspection (Class 1)   Nichols, Morris; A Little Litter On North Side Of Sw Pond, A Small Area Lacking Daily Cover, Thick Layer Of Mulch Up Top (Instead Of Inter. Cover?), Used Oil Area A Little Messy, Observed The Aquatic Weeds, Disposing In 1a  
 6/8/1998  Waste Tire Processing Facility Inspection.   Nichols, Morris  
 6/26/1998  Groundwater Monitoring Report    
 7/10/1998  Waste Tire Processing Facility Report Due    
 7/13/1998  Leachate Report   Incl. Appendix Ii Also Effluent.- Apr/June 1998  
 8/12/1998  Gas Monitoring Report    
 8/31/1998  Financial Assurance Documents   Pelz-Rai Sent 9/16,10/19/98;Approved 12-14-98;Funding Ok 5-6-99  
 8/31/1998  Financial Assurance Documents   Pelz-Rai Sent 9/16, 10/19/98;Approved 12-14-98;Funding Ok 5-6-99  
 9/21/1998  Landfill Inspection (Class 1)   Nichols; Power Supply To Sw Lift Station, Methane Detectors In Leachate And Sw Lift Stations And Flow Meters Not Working Properly  
 9/21/1998  Waste Tire Processing Facility Inspection.   Nichols  
 10/16/1998  Leachate Report   Effluent  
 10/16/1998  Groundwater Monitoring Report   Also Qap  
 11/2/1998  Waste Tire Processing Facility Report Due   Also Rec'D Letter That No Changes In Ops On Oct. 2  
 11/4/1998  Gas Monitoring Report   Jrm-Oct, Nov, Dec 1998  
 1/19/1999  Leachate Report   Also Sludge Analyses & Effluent-Oct,Nov,Dec 1998  
 1/21/1999  Waste Tire Processing Facility Report Due    
 1/25/1999  Landfill Inspection (Class 1)   Nichols; Stress Tear In Liner,  
 2/24/1999  Gas Monitoring Report   Jrm - Jan, Feb, Mar 1999  
 4/12/1999  Waste Tire Processing Facility Report Due    
 4/16/1999  Leachate Report   Jrm- Jan, Feb, Mar 1999; App I For Influent; Quarterly Effluent Parameters  
 5/5/1999  Gas Monitoring Report   Jrm-Apr, May, Jun 1999  
 6/21/1999  Landfill Inspection (Class 1)   Morgan  
 6/21/1999  Waste Tire Processing Facility Inspection.   Morgan  
 7/14/1999  Leachate Report   Jrm- Apr, May, Jun 1999; Quarterly Effluent Data  
 7/14/1999  Groundwater Report   Gw Mon Plan Eval  
 7/19/1999  Waste Tire Processing Facility Report Due    
 8/4/1999  Gas Monitoring Report   Jrm-Jul, Aug, Sep 1999  
 9/1/1999  Financial Assurance Documents   Sjp-Rev Ests;Approved 9-13-99 | Funding: 5/3/00  
 9/1/1999  Financial Assurance Documents   Sjp-Rev. Ests; Approved 9-13-99  
 10/7/1999  Submittal Received By Department   Fire Safety Survey (No Changes To Site From 09-Sep-98 | 01-Oct-99)  
 10/8/1999  Waste Tire Processing Facility Report Due    
 10/25/1999  Leachate Report   Quarterly Effluent Quality Data- Jul-Sep 1999 | Morris- Weekly/Quarterly Effluent Results; Annual Sludge Results  
 11/4/1999  Landfill Inspection (Class 1)   Facility Very Well Operated And Maintained  
 11/4/1999  Waste Tire Processing Facility Inspection.    
 11/8/1999  Gas Monitoring Report    
 12/17/1999  Groundwater Monitoring Report   Morris- Ph And Nitrate Exceedances, Benzene @ Mw-6,Mw-7,Mw-8 | Also 1,3-Dichlorobenzene And Vinyl Chloride @ Mw-8  
 1/4/2000  Landfill Inspection (Class 1)   Msp  
 1/10/2000  Waste Tire Processing Facility Report Due    
 1/18/2000  Leachate Report   Quarterly Leachate Quality Results- Oct-Dec 1999 | Morris- Weekly/Quarterly Leachate Effluent Results  
 1/26/2000  Leachate Report   Sampled 7/99; Sludge Data Transmitted Previously In Oct 1999 Submittal | Morris- Leachate Influent And Treated Effluent Reported For App Ii Parameters  
 2/24/2000  Gas Monitoring Report    
 4/14/2000  Leachate Report   Quarterly Leachate Effluent Results- Jan-Mar 2000 | Morris- Weekly/Quarterly Leachate Effluent Results  
 4/17/2000  Waste Tire Processing Facility Report Due    
 5/8/2000  Gas Monitoring Report   Sampled 5/2/00  
 5/25/2000  Waste Tire Processing Facility Inspection.    
 5/25/2000  Landfill Inspection (Class 1)   Petro  
 7/10/2000  Waste Tire Processing Facility Report Due    
 7/12/2000  Leachate Report   Leachate Effluent Quality Data; Apr/Jun 2000 | Morris- Reported Leachate Influent For App I Parameters; Weekly/Quarterly Leachate Effluent Results  
 7/12/2000  Groundwater Monitoring Report   Morris-Exceedanced For Ph,Antimony,Be,Cd,Fe,Pb,Nitrate,Benzene,Vinyl Chloride | But At Downgradient Compliance Well Only Exceeded Fe  
 7/18/2000  Monitoring Data Results Reviewed   Gw - 1/15/00  
 8/17/2000  Gas Monitoring Report   Sampled 8/11/00  
 9/6/2000  Financial Assurance Documents   Ests Approved 9-6-00 | Funding Approved 4/26/01  
 9/11/2000  Financial Assurance Documents   Cost Ests; Approved 9/11/00 | Funding; Approved 4/26/01  
 9/13/2000  Monitoring Data Results Reviewed   Gw - 7/15/00  
 9/19/2000  Waste Tire Processing Facility Inspection.    
 9/19/2000  Landfill Inspection (Class 1)    
 10/6/2000  Renewal Application Due    
 10/10/2000  Waste Tire Processing Facility Report Due    
 10/16/2000  Leachate Report   Leachate Effluent Quality Data; Jul-Sep 2000; 2 Separate Submittals Received This Date | Morris- Leachate Influent And Treated Effluent Reported For App. Ii Parameters; Weekly/Quarterly Leachate Effluent Data; Annual Sludge Analyses Provided  
 11/9/2000  Gas Monitoring Report   Sampled 10/31/00  
 12/8/2000  Financial Assurance Documents    
 12/8/2000  Financial Assurance Documents    
 12/8/2000  Financial Assurance Documents    
 12/8/2000  Renewal Application Due    
 12/8/2000  Financial Assurance Documents    
 12/22/2000  Groundwater Monitoring Report   Also Qap;Sampled 8/29-30/00 | Morris- Exceedances Reported For Ph,Fe,Nitrate,Benzene,Vinyl Chloride  
 1/12/2001  Leachate Report   Leachate Effluent Quality Data; Oct/Dec 2000 | Morris- Weekly/Quarterly Treated Effluent Data  
 1/16/2001  Waste Tire Processing Facility Report Due   Revised 22 Jan 2001  
 1/30/2001  Landfill Inspection (Class 1)    
 1/31/2001  Gas Monitoring Report    
 3/8/2001  Permit Condition Or Consent Order/Response Due   Annual Fire Safety Survey  
 4/18/2001  Waste Tire Processing Facility Report Due    
 5/3/2001  Leachate Report   Jan-Mar Leachate Effluent Weekly/Quarterly Sampling Results | Morris- Provided Semi-Annual Influent Analyses Of App I Parameters  
 5/9/2001  Landfill Inspection (Class 1)    
 5/9/2001  Waste Tire Processing Facility Inspection.    
 5/22/2001  Monitoring Data Results Reviewed   Gw - 1/15/01  
 7/12/2001  Groundwater Monitoring Report   Sampled 3/29-30/01 | Morris- Exceedances Reported For Ph,Fe,Pb,Nitrate,Benzene,Vinyl Choride  
 7/19/2001  Leachate Report   Incl. Appendix Ii Also Effluent  
 7/20/2001  Financial Assurance Documents   Sjp-Rev Ests;Approved 8-17-01  
 7/20/2001  Financial Assurance Documents   Sjp-Rev Ests;Approved 8-17-01,Rev Est Approved 11/21/01 | Funding Ok 04/01/2002  
 7/20/2001  Groundwater Report    
 8/1/2001  Gas Monitoring Report   Sampled 8/1/01  
 8/1/2001  Gas Monitoring Report   Not Conducted!!  
 9/6/2001  Waste Tire Processing Facility Inspection.   Sis,Cwb-Report Not Received  
 9/6/2001  Landfill Inspection (Class 1)   Sis,Cwb-Initial Cover,White Goods Area  
 9/12/2001  Waste Tire Processing Facility Report Due   Cwb-Sent Another Copy With Inspection Response 9-19-01  
 10/15/2001  Leachate Report   Cwb-Sampled 9/26/01  
 10/29/2001  Gas Monitoring Report   Sampled 10/24/01  
 12/3/2001  Monitoring Data Results Reviewed   Gw - 7/15/01  
 1/11/2002  Renewal Application Due   21375-003-So Combined With Ltc, Proj # 65380  
 1/22/2002  Waste Tire Processing Facility Report Due   Cwb-80 Tons On Site  
 1/24/2002  Landfill Inspection (Class 1)   Sis-Did Not Inspect Closed Portion Today  
 1/24/2002  Waste Tire Processing Facility Inspection.   Sis  
 3/8/2002  Leachate Report   Quality Influent And Effluent | Reviewed 10/15/04 - Smc Influent Includes Appendix Ii Parameters  
 3/11/2002  Groundwater Monitoring Report   Sampled 9/11-12/01 | Morris- Exceedances Reported For Ph,Iron,Lead,Nitrate,Benzene,Vinyl Chloride  
 4/5/2002  Gas Monitoring Report   Sampled 3/28/02  
 4/17/2002  Permit Condition Or Consent Order/Response Due   Remaining Capacity Estimate And Annual Topographic Survey  
 4/22/2002  Waste Tire Processing Facility Report Due    
 4/22/2002  Leachate Report   Effluent Quality | Reviewed 10/15/04 - Smc  
 5/10/2002  Landfill Inspection (Class 1)   Llm- Oil Containment Area Has Excess Sitting Water/Oil  
 6/7/2002  Compliance Assistance Site Visit   Kbf- Sideslopes Repaired; Waste Being Placed; Facility To Send Work In Progess Photos  
 7/8/2002  Gas Monitoring Report    
 7/15/2002  Leachate Report   Effluent Quality | Reviewed 10/15/04 - Smc  
 7/15/2002  Waste Tire Processing Facility Report Due    
 7/18/2002  Letter   Impacted Stormwater Discharge  
 7/29/2002  Groundwater Monitoring Report   Sampled 1/22-29/02 And 6/12/02 | Morris- Exceedances Reported For Ph,Iron,Lead,Nitrate,Benzene,Vinyl Chloride  
 9/3/2002  Gas Monitoring Report    
 9/3/2002  Financial Assurance Documents   Sjp- Inf Adj Approved 10/3/02 | Funding Ok 4/8/03  
 9/5/2002  Letter   Conaminated Stormwater  
 9/23/2002  Waste Tire Processing Facility Inspection.    
 9/23/2002  Landfill Inspection (Class 1)   Llm - Cl1, Electronics, Needs Tarp/Cover; Bucket W/ Small Amount Of Tire Sealer In Cl1 Wf; Bicycles In Scrap Metal.  
 9/23/2002  Waste Tire Processing Facility Report Due    
 10/17/2002  Leachate Report   Influent And Effluent Quality | Reviewed 10/15/04 - Smc. Influent Includes Appendix Ii Parameters  
 10/20/2002  Permit Condition Or Consent Order/Response Due   Sludge Analysis  
 10/21/2002  Waste Tire Processing Facility Report Due    
 11/29/2002  Letter   Leachate "Discharge"  
 1/2/2003  Groundwater Monitoring Report   Sampled 8/8/02 | Morris- Exceedances Reported For Ph, Iron, Lead, Benzene, Vinyl Chloride  
 1/15/2003  Gas Monitoring Report    
 1/15/2003  Leachate Report   Effluent Quality | Reviewed 10/15/04 - Smc  
 1/23/2003  Waste Tire Processing Facility Report Due    
 1/28/2003  Waste Tire Processing Facility Inspection.   Llm  
 1/28/2003  Landfill Inspection (Class 1)   Llm - No Waterproof Tarps On-Site For Cl1 Containers;Electronics Stored On Ground  
 2/28/2003  Gas Monitoring Report    
 3/19/2003  Monitoring Data Results Reviewed   Gw - 1/15/02  
 4/11/2003  Leachate Report   Effluent Quality | Reviewed 10/15/04 - Smc  
 4/11/2003  Leachate Report   Quantity  
 4/15/2003  Permit Condition Or Consent Order/Response Due   Remaining Life & Capacity Estimate & Topo | Topo Received 6/18/04  
 4/24/2003  Waste Tire Processing Facility Report Due    
 5/13/2003  Waste Tire Processing Facility Inspection.    
 5/13/2003  Landfill Inspection (Class 1)   Llm - No Waterproof Tarps; Some Flagging @ Cl1; Opening In Berm Surrounding Cl1; Cl1 Waste In Cl3 Area @ Citizen Drop-Off | (C)Cl1-Looked Fine  
 6/25/2003  Gas Monitoring Report    
 6/25/2003  Letter   Break In Berm About 20,000 Gal. Leachate Released Into Storm Water  
 6/27/2003  Leachate Report   Quantitive 7/7/03; Effluent Qual. 7/7/03 | Quality Reviewed 10/15/04 - Smc  
 7/14/2003  Groundwater Monitoring Report   Sampled 1/20-23/03 | Morris- Exceedances Reported For Ph, Iron, Lead, Nitrate, Benzene, Vinyl Chloride  
 7/23/2003  Waste Tire Processing Facility Report Due    
 7/31/2003  Gas Monitoring Report    
 9/8/2003  Financial Assurance Documents   Sgm- Cost Est Approved 9/24/03  
 9/9/2003  Monitoring Data Results Reviewed   Gw - 7/15/02  
 9/19/2003  Letter   Ds-Fire In Roll-Off At Citizen Drop Off Area/Water To Extinguish Fire Discharged To Surrounding Soil  
 9/22/2003  Waste Tire Processing Facility Inspection.   Ds,Lr-Clooecting Tires Only  
 9/22/2003  Landfill Inspection (Class 1)   Ds, Lr-Flagging Intermediate Cover,Wasteoutside Berm,Litter,Whitegoods/Mower Not Upright,  
 10/14/2003  Leachate Report   Quantity  
 10/16/2003  Leachate Report   Ds_Quantity Sampled On 8/6/2003  
 10/16/2003  Permit Condition Or Consent Order/Response Due   Sludge Analysis- Sampled 8/6/03  
 10/16/2003  Leachate Report   Influent Quality Sampled 8/6/03 | Reviewed 10/15/04 - Smc. Includes Appendix Ii Parametes  
 10/20/2003  Leachate Report   Effluent Quality | Reviewed 10/15/04 - Smc  
 10/24/2003  Waste Tire Processing Facility Report Due    
 11/10/2003  Letter   Leachate Treatment Plant Out Of Service Since 10/6 For Maintenance, Leachate Currently Taken To Meadowcrest  
 12/29/2003  Groundwater Report   Groundwater Monitoring Plan Evaluation; Time Extension Request From 12/15/03 Rec'D 12/12/03  
 1/8/2004  Landfill Inspection (Class 1)   Lmr- Flagging, Computer In Scrap Metal, Berms, Oil  
 1/13/2004  Leachate Report   Effluent Quality | Reviewed 10/15/04 - Smc  
 1/15/2004  Groundwater Monitoring Report   Sampled 8/5 To 8/8/03 | Morris- Exceedances Reported For Ph, Iron, Lead, Nitrate, Tds, Benzene, Vinyl Chloride  
 1/15/2004  Gas Monitoring Report    
 1/15/2004  Leachate Report   Quantity  
 1/16/2004  Letter   Leachate Release- Citizen Drop-Off Area Had Fire, H2o Run-Off  
 1/22/2004  Waste Tire Processing Facility Report Due    
 2/6/2004  Leachate Report   Quanity Report  
 3/12/2004  Letter   Ltr Dated 3-13-03, Received 3-17-03; Liner Was Damaged On 3-12-03 Apprx. 100 Ft. North Of The Vehicle Access Rd.  
 4/15/2004  Groundwater Monitoring Report   Sampled 2/3-6/04, 3/22/04 | Morris- Exceedances Reported For Ph, Iron, Nitrate, Benzene, Vinyl Chloride  
 4/15/2004  Leachate Report   Effluent Quality | Reviewed 10/15/04 - Smc  
 4/15/2004  Gas Monitoring Report   Gas Remediation Study 5/5/04  
 4/16/2004  Leachate Report   Quanity  
 4/21/2004  Waste Tire Processing Facility Report Due    
 5/5/2004  Gas Monitoring Report   Additional Report Rec'D 5/24/04 For Same Qtr  
 5/5/2004  Waste Tire Processing Facility Inspection.   Lmr- Ok  
 5/5/2004  Landfill Inspection (Class 1)   Lmr- Flagging; Hole In Roll-Off  
 6/4/2004  Permit Condition Or Consent Order/Response Due   Remaining Life & Capacity And Topo; Recv'D 6/12/04 | Topo Received 6/18/04  
 6/6/2004  Letter   Fire  
 7/15/2004  Leachate Report   Effluent Quality | Reviewed 10/15/04 - Smc  
 7/16/2004  Leachate Report   Quantity  
 7/24/2004  Letter   Leachate Spill  
 7/24/2004  Letter   Leachate Spill At Facility 7/24/04  
 7/26/2004  Waste Tire Processing Facility Report Due    
 7/26/2004  Letter   150,000 Gallon Leachate Spill Form The Leachate Collection, Storage And Treatment System  
 8/4/2004  Letter   7/26/04 Letter Response About Leachate Spill  
 8/12/2004  Letter   Spill Of Small Quantity Of Unknown Leachate, Reason For Incident Cited And Fixed.  
 8/20/2004  Financial Assurance Documents   Inflation-Adjusted Cost Ests Dated 8/8/04 Approved For 2004 On 10/12/04 - Sgm | Funding Ok 1/25/05; Another Talla. Ltr 5/16/05  
 9/4/2004  Letter   Hurricane Frances Caused Site Central Drainage Retention Area To Overflow For 3 Days - Pumped To Dra, Section Of Raincoat Torn And Replaced On West Side, South Slope Washout Exposed Waste And Was Repaired, Oil Containment Area Rood Blew Off And Area  
 9/23/2004  Letter   Seep On North Face Of Fill Slope Adjacent To Phase 2 Construction, To Drain To Construction Area And Be Conveyed To Dra - Diluted W/ Hurrican Frances Rainfall (12 Inches)  
 10/6/2004  Groundwater Monitoring Report   Sampled 7/21 To 7/23/04 | Morris- Exceedances Reported For Ph, Iron, Lead, Nitrate, Tds, Benzene, Vinyl Chloride  
 10/6/2004  Permit Condition Or Consent Order/Response Due   Sludge Analysis  
 10/14/2004  Gas Monitoring Report    
 10/15/2004  Leachate Report   Annual Influent Sample And Annual And Quarterly Effluent Sample Received 10/6/04; Weekly Effluent Sample Received 7/15/04 | Reviewed 12/9/04 - Smc  
 10/20/2004  Waste Tire Processing Facility Report Due    
 11/2/2004  Waste Tire Processing Facility Inspection.   Lmr- Ok  
 11/2/2004  Landfill Inspection (Class 1)   Lmr- Gas Migration; Please See Coorsponding Letters And Emails  
 12/13/2004  Letter   Thick Layer Of Foam Noticed On Top Of First Phase Treatment Tank 12/13; Next Day 50 Gallons Of It Had Flown Out Of Tank And Had To Be Shoveled Back Into Tank. | Thought Result Of Cold Snap, Will Reduce Batch Size, Monitor And Extend Aeration Time As  
 12/17/2004  Gas Monitoring Report   December Report; 4th Qtr Report Rec'D 1/24/05  
 12/17/2004  Gas Monitoring Report   Dec. Event For Analysis  
 1/14/2005  Leachate Report   Weekly Effluent Results And Quarterly (Rec'D 1/13/05) | Leachate Generation And Precipitation Report Rec'D 1/14/05  
 1/18/2005  Landfill Inspection (Class 1)    
 1/20/2005  Waste Tire Processing Facility Report Due    
 2/3/2005  Letter   Construction Failure- Geogrids/Geocomposite; Severed Electricity For Phase1/1a  
 2/14/2005  Monitoring Data Results Reviewed   Gw - 7/15/04 | Lmr  
 2/14/2005  Monitoring Data Results Reviewed   Gw - 7/15/03 | Lmr  
 2/14/2005  Monitoring Data Results Reviewed   Gw - 1/15/05 | Imj  
 2/14/2005  Monitoring Data Results Reviewed   Gw - 1/15/04 | Lmr  
 3/1/2005  Groundwater Report   Groundwater Monitoring Plan Evaluation (Came In With Permit Renewal/Expansion App)  
 3/1/2005  Renewal Application Due   180 Days Prior To Expiration, 8/31/05  
 3/31/2005  Monitoring Data Results Reviewed   Gw - 1/15/03 | Lmr  
 4/4/2005  Gas Monitoring Report    
 4/11/2005  Leachate Report    
 4/15/2005  Permit Condition Or Consent Order/Response Due   Remaining Life & Capacity Estimate & Topo  
 4/15/2005  Groundwater Monitoring Report   Sampled 1/25 To 1/27/05 | Exceedances Reporte For Ph, Iron, Benzene, Vinyl Chloride  
 4/21/2005  Waste Tire Processing Facility Report Due    
 5/5/2005  Waste Tire Processing Facility Inspection.   L. Ross, D. Nichols  
 5/5/2005  Landfill Inspection (Class 1)   L. Ross, D. Nichols | No Spotter, Prohibiting Unacc. Waste?, Wrong Ops Plan  
 5/12/2005  Gas Monitoring Report    
 6/8/2005  Monitoring Data Results Reviewed   Gw - 7/15/05 | Jrm  
 7/7/2005  Meeting    69
 7/14/2005  Draft Consent Order Sent To Ogc    69
 7/15/2005  Leachate Report   Quality  
 7/18/2005  Waste Tire Processing Facility Report Due    
 7/22/2005  Draft Consent Order Issued    69
 7/22/2005  Enforcement Project Initiated   Draft Co Sent To County For Groundwater And Gas Criteria Exceedances  
 8/5/2005  Enforcement Tracking   Project Name: Citrus County Central Class I And Closed Class I Landfill Project Id: 290592 Project Description: Exceedances Of Groundwater And Gas Criteria  69
 8/15/2005  Letter   Fire In Scrap Metal Rolloff Box, Citizen Service Area  
 8/15/2005  Penalty Received   $3,000 Check From Citrus County  69
 8/19/2005  Letter   Notification Of Fire In Cda  
 9/1/2005  Financial Assurance Documents   Cost Estimates  
 9/9/2005  Letter   From Dag To Commissioner Bartell  69
 9/14/2005  Gas Monitoring Report   Sampled 8/24/05  
 9/20/2005  Consent Order    
 9/20/2005  Consent Order Executed    69
 9/21/2005  Department Comments Sent   Copy Of Executed Co Sent To County  69
 10/11/2005  Leachate Report   Quality And Quantity  
 10/13/2005  Submittal Received By Department   County Requests Extension Per Paragraph 16 Of Co  69
 10/14/2005  Groundwater Monitoring Report   Sampled Aug. 2-5 2005-Btg | Exceedances Reported For Ph, Iron, Lead, Chloride, Nitrate, Tds, Benzene, Vinyl Chloride  
 10/19/2005  Waste Tire Processing Facility Report Due   Btg  
 10/27/2005  Letter   New 90-Deadlines In Co  69
 11/3/2005  Groundwater Monitoring Report    
 11/3/2005  Groundwater Monitoring Report    
 11/3/2005  Leachate Report   Generation  
 11/3/2005  Permit Condition Or Consent Order/Response Due   Lcs Inspection Report  
 11/3/2005  Gas Monitoring Report    
 11/3/2005  Gas Monitoring Report    
 11/3/2005  Leachate Report   Generation  
 11/3/2005  Renewal Application Due    
 11/3/2005  Groundwater Monitoring Report    
 11/3/2005  Financial Assurance Documents   Cost Estimates  
 11/3/2005  Permit Condition Or Consent Order/Response Due   Leachate Influent, Effluent, And Sludge Analysis  
 11/3/2005  Leachate Report   Generation  
 11/3/2005  Gas Monitoring Report    
 11/3/2005  Groundwater Monitoring Report    
 11/3/2005  Gas Monitoring Report    
 11/3/2005  Gas Monitoring Report    
 11/3/2005  Groundwater Monitoring Report    
 11/3/2005  Permit Condition Or Consent Order/Response Due   Install Mw-16  
 11/3/2005  Gas Monitoring Report    
 11/3/2005  Groundwater Report    
 11/3/2005  Gas Monitoring Report    
 11/3/2005  Financial Assurance Documents   Cost Estimates  
 11/3/2005  Gas Monitoring Report    
 11/3/2005  Leachate Report   Generation  
 11/3/2005  Leachate Report   Generation  
 11/3/2005  Financial Assurance Documents   Cost Estimates  
 11/3/2005  Leachate Report   Generation  
 11/3/2005  Groundwater Monitoring Report    
 11/3/2005  Leachate Report   Generation  
 11/3/2005  Leachate Report   Generation  
 11/3/2005  Leachate Report   Generation  
 11/3/2005  Gas Monitoring Report    
 11/3/2005  Leachate Report   Generation  
 11/3/2005  Leachate Report   Generation  
 11/3/2005  Financial Assurance Documents   Cost Estimates  
 11/8/2005  Letter   Corrected Date. New Co Deadlines Are 1/4/06.  69
 11/23/2005  Groundwater Monitoring Report   Resample Of Second Half Of 2005, Exceeded In Tds And Chloride | Btg  
 11/23/2005  Groundwater Monitoring Report   Resampling Event Conducted 10/26/05 @ Mw-1r  
 11/25/2005  Letter   Fire Burnt Caterpillar Compactor, Leachate Tanks Reached Capacity  
 12/5/2005  Submittal Received By Department   Request To Extend Deadline In Paragraph 10  69
 12/16/2005  Status Report    69
 12/21/2005  Letter   Dep Grants Extension Until 2/3/06 To Comply With Paragraph 10  69
 1/3/2006  Submittal Received By Department   Landfill Gas Monitoring Probes Installation Construction Certification Report (4 Copies)  69
 1/3/2006  Submittal Received By Department   Landfill Gas Monitoring Probes Installation Construction Certification Report Submitted  69
 1/4/2006  Submittal Received By Department   Groundwater Investigation Report Submitted  69
 1/5/2006  Submittal Received By Department   County Request For Extension Per Paragraph 16 Of Ca  69
 1/13/2006  Permit Condition Or Consent Order/Response Due   Permit Mod For Seq. Of Fill, Stormwater Mgmt System  
 1/13/2006  Leachate Report   Quantity And Quality, Revised Year To Date Sent In 1/26/06  
 1/19/2006  Gas Monitoring Report   Sampled 11/16/05  
 1/19/2006  Waste Tire Processing Facility Report Due    
 1/23/2006  Financial Assurance Documents   Financial Assurance  
 1/23/2006  Financial Assurance Documents   Financial Assurance  
 1/23/2006  Financial Assurance Documents   Financial Assurance  
 1/23/2006  Renewal Application Due    
 1/23/2006  Financial Assurance Documents   Financial Assurance  
 1/23/2006  Financial Assurance Documents   Financial Assurance  
 1/23/2006  Financial Assurance Documents   Financial Assurance  
 2/2/2006  Letter   Dep Approval Of Extension To Comply W/ Paragraphs 10,11,12 By April 4, 2006.  69
 2/3/2006  Landfill Inspection (Class 1)   Stain Was Present Down Liner  
 2/3/2006  Waste Tire Processing Facility Inspection.    
 2/6/2006  Groundwater Monitoring Report   Assessment Wells Sampled 11/16 & 11/17/05 | Exceedances Reported For Ph, Iron, Vinyl Chloride  69
 2/16/2006  Submittal Received By Department   Lab Data For Groundwater Investigation Report Resampling  69
 2/16/2006  Groundwater Monitoring Report   Resampling At Well Mw-15 Conducted 1/5/06 & 1/27/06 | Exceedances Reported For Ph  69
 3/1/2006  Status Report    69
 3/22/2006  Gas Monitoring Report   Sampled On 2/24/06  
 4/4/2006  Letter   Approval Of Request For Extension Of 04/04/06 Deadline; New Deadline Is 09/01/06.  69
 4/6/2006  Status Report    69
 4/13/2006  Leachate Report   Leachate Effluent -Sampled For Quarterly & Semiannual Parameters | Sampling Performed On 1-26-06  
 4/13/2006  Leachate Report   Leachate Generation & Daily Precipitation Report; Leachate Monitoring Report | Letter Dated 4-11-06; Letter Dated 4-12-06  
 4/14/2006  Waste Tire Processing Facility Report Due   Letter Dated 4-12-06  
 4/25/2006  Status Report    69
 4/28/2006  Permit Condition Or Consent Order/Response Due   Fire In Rolloff Box; < 300-Gals Used To Extinguish Fire; No External Assistance Required  
 5/8/2006  Monitoring Data Results Reviewed   Gw - 2/6/06 | Jrm  69
 5/8/2006  Monitoring Data Results Reviewed   Gw - 2/16/06 | Jrm  69
 5/11/2006  Waste Tire Processing Facility Inspection.    
 5/11/2006  Landfill Inspection (Class 1)    
 5/24/2006  Letter   Response To Department Comments Regarding Groundwater Investigation Report Due.  69
 6/9/2006  Letter   Email From Citrus Re: Status Update On Lease Agreement  69
 6/13/2006  Status Report    69
 6/14/2006  Submittal Received By Department   Letter From County Regarding Status Of Sublease Amendment From State Lands  69
 6/23/2006  Leachate Report   Leachate Effluent -Sampled For Quarterly Parameters | Sampled On 4-13-06  
 7/7/2006  Gas Monitoring Report   Methane Dectd In Concentrations That Violate Standards In Probe Gs 2e. Sampled 6/21/06.  
 7/7/2006  Leachate Report   Generation & Daily Precipitation Report | Letter Dated 7-5-06 -Plant Shut Down 5/23-6/30; Action Leakage Rate Exceeded On 6/30  
 7/12/2006  Status Report    69
 7/14/2006  Groundwater Monitoring Report   Sampled 1/25 To 1/31/06 | Exceedances Reported For Ph, Iron, Nitrate, Tds, Benzene, Vinyl Chloride  
 7/17/2006  Waste Quantity Report   Please Refer To Fac 67-711.530 Par (5) For Reporting Requirements (2nd Quarter 2006)  
 7/19/2006  Waste Tire Processing Facility Report Due    
 8/7/2006  Letter   Cap Repair Completed  
 8/7/2006  Letter   Cap Repair Completed  
 8/12/2006  Status Report    69
 8/23/2006  Permit Condition Or Consent Order/Response Due   Annual Update/ No Changes To Emergency Response Manual  
 8/31/2006  Financial Assurance Documents   Cost Estimates/Sgm-08/31/06/Inf. Adj  
 9/6/2006  Submittal Received By Department   #2 Leachate Collection Pump Inop. Scs Field Services Will Be Working On System-09/09/06  
 9/12/2006  Status Report    69
 9/15/2006  Submittal Received By Department   Revisions To Groundwater Investigation Report (Requested In Dep'S 5/24/06 Letter)  69
 9/15/2006  Groundwater Monitoring Report   Sampled 7/17 & 7/18/06; Mw-10 Resampled 8/31/06 | Exceedances Reported For Ph, Antimony, Iron, Benzene, Vinyl Chloride  69
 9/18/2006  Submittal Received By Department   Electronic Copy Of Sublease Agreeement.  69
 9/22/2006  Submittal Received By Department   Hard Copy Of Lease Expansion Agreement  69
 9/26/2006  Monitoring Data Results Reviewed   Gw - 11/23/05 | Jrm  
 9/26/2006  Monitoring Data Results Reviewed   Gw - 7/15/06 | Jrm  
 9/26/2006  Monitoring Data Results Reviewed   Gw - 1/15/06 | Jrm  
 9/26/2006  Monitoring Data Results Reviewed   Gw - 9/15/06 | Jrm  69
 9/27/2006  Submittal Received By Department   Sjp-Email Notification Of Leachate Treatment Plant Upset; No Leachate Discharge  
 9/29/2006  Gas Monitoring Report   3rd Qtr; Sampled 9/7/06. | No Hits At Assessment Wells Gp-1 Through Gp-18.  
 10/10/2006  Waste Tire Processing Facility Report Due   Iii Quarter Waste Tire Report  
 10/10/2006  Permit Condition Or Consent Order/Response Due   Leachate Influent, Effluent And Sludge Analysis, Iii Quarter  
 10/10/2006  Leachate Report   Generation  
 10/17/2006  Status Report    69
 10/26/2006  Letter   Clarification Of Deadlines In Ca And Status Of Compliance W/ Ca  69
 10/27/2006  Waste Tire Processing Facility Inspection.   No Response Due  
 10/27/2006  Landfill Inspection (Class 1)   No Response Due  
 10/30/2006  Gas Monitoring Report   4th Qtr; Sampled 10/4/06 | No Exceedances At Gp-1 Through Gp-18  
 11/6/2006  Submittal Received By Department   Leachate Pump Failure, #2 Primary In Phase 1/1a Sump  
 11/13/2006  Submittal Received By Department   Letter Indicating What Activities Will Be Performed To Comply With 62-780.  69
 11/16/2006  Status Report    69
 12/7/2006  Permit Condition Or Consent Order/Response Due   Annual Topo And Capacity  
 12/7/2006  Permit Condition Or Consent Order/Response Due   Topo Remaining Capacity  
 12/15/2006  Permit Condition Or Consent Order/Response Due   Remaining Life Calculations  
 12/15/2006  Telephone Conversation   Sw Discuss Site Assessement W/ Susie Metcalfe/John Locklear; John Will Revise The 11/9/06 Letter And Submit To Dep.  69
 12/19/2006  Status Report    69
 1/2/2007  Submittal Received By Department   Revised Site Assmnt Activities Ltr From Jea Dated 12/28/06 Submitted In Resp To 12/15/06 Telecom  69
 1/10/2007  Groundwater Monitoring Report   Sampled 7/19 To 7/20/06; Includes Compliance Wells At Prop Bndy & Assessment Wells | Exceedances Reported For Ph, Iron, Nitrate, Tds, Benzene, Vinyl Chloride, Methylene Chloride  
 1/16/2007  Leachate Report   Generation, Mam  
 1/16/2007  Waste Tire Processing Facility Report Due    
 2/12/2007  Status Report    69
 3/21/2007  Status Report    69
 4/13/2007  Leachate Report   Generation, Quan, Mam  
 4/15/2007  Leachate Report   Effluent Quality  
 4/15/2007  Leachate Report   Effluent Quality  
 4/16/2007  Gas Monitoring Report   Sjp-No Exceedances At New Property Boundary  
 4/16/2007  Waste Tire Processing Facility Report Due    
 4/17/2007  Letter   Sjp-Email Notification Of Wind Damage To Rain Cell Covers  
 4/30/2007  Letter   Sjp-Liner Damage In Phase Ii  
 5/11/2007  Status Report    69
 5/25/2007  Landfill Inspection (Class 1)    
 5/25/2007  Waste Tire Processing Facility Inspection.    
 6/1/2007  Groundwater Monitoring Report   Includes Wells At Existing Prop Bndy And Assessment Wells In Easement Exp Area, Sampled 1/22 To 1/24/07 | Exceedances Reported For Ph, Iron, Benzene, Vinyl Chloride  
 6/12/2007  Status Report    69
 7/9/2007  Gas Monitoring Report   06/20/2007 | No Exceedences, Mam  
 7/9/2007  Leachate Report   Generation, Mam  
 7/11/2007  Leachate Report   Effluent Quality | 2nd Quarter Effluent Quality, Weekly Effluent Quality-  
 7/11/2007  Letter   Lightning Strike, Damage To Leachate System, Explosion, Mam  
 7/12/2007  Waste Tire Processing Facility Report Due   Mam  
 7/13/2007  Status Report    69
 8/14/2007  Status Report    69
 8/30/2007  Gas Monitoring Report   Mam, No Detect  
 9/17/2007  Groundwater Report   Mam  
 9/19/2007  Status Report    69
 10/5/2007  Leachate Report   Effluent Quality | 3rd Quarter - Sampled 7/07, Monthly Effluent Data,  
 10/8/2007  Letter   Leachate Discharge, Mam  
 10/9/2007  Leachate Report   2008 Influent/Sludge Analysis & Annual Effluent Parameters, 1st Quarter 2009 Effluent Quality  
 10/9/2007  Leachate Report   Effluent Generation  
 10/9/2007  Leachate Report   2009 Influent/Sludge Analysis & Annual Effluent Parameters, 1st Quarter 2010 Effluent Quality  
 10/9/2007  Leachate Report   Effluent Quality  
 10/9/2007  Leachate Report   Effluent Quality  
 10/9/2007  Leachate Report   Effluent Quality  
 10/9/2007  Leachate Report   Effluent Quality  
 10/9/2007  Leachate Report   Effluent Quality  
 10/9/2007  Leachate Report   Effluent Quality  
 10/15/2007  Leachate Report   Generation, Mam  
 10/15/2007  Waste Tire Processing Facility Report Due   Mam  
 10/22/2007  Waste Tire Processing Facility Inspection.    
 10/22/2007  Landfill Inspection (Class 1)   Initial And Intermediate Cover, Scrap Metal, Hhwcc Sorting/Storage Issues | Response Received Addressing Issues - Ng  
 10/22/2007  Contamination Assessment Report   Sar  69
 10/31/2007  Status Report    69
 11/1/2007  Groundwater Monitoring Report   Sampled 7/17 To 7/20/07, Includes New Compliance Wells In Easement Expansion Area | Exceedances Reported For Ph, Iron, Benzene, Vinyl Chloride  
 12/13/2007  Gas Monitoring Report   Mam - No Detect At All 18 Points  
 12/20/2007  Letter   Leachate Discharge, Mam  
 1/7/2008  Leachate Report   2007 Influent/Sludge Analysis & Annual Effluent Parameters, 1st Quarter 2008 Effluent Quality | Sludge, Influent Sampled 7-07 And Annual Effluent Parameters Sampled 7-07 Submitted 10/5/07  
 1/11/2008  Telephone Conversation   Sw & Jrm Teleconference W/ Susie Metcalfe -She Requested A Status Update Letter For Co  69
 1/14/2008  Leachate Report   Generation  
 1/14/2008  Waste Tire Processing Facility Report Due   Mam  
 1/16/2008  Status Report    69
 1/24/2008  Monitoring Data Results Reviewed   Gw - 1/15/07 | Jrm  
 1/28/2008  Monitoring Data Results Reviewed   Gw - 7/15/07 | Jrm  
 1/28/2008  Monitoring Data Results Reviewed   Gw - 1/15/08 | Jrm  
 1/29/2008  Waste Tire Processing Facility Inspection.    
 1/29/2008  Landfill Inspection (Class 1)   Insufficient Inital Cover, Maintenance Of Final Cover - Ng | Cover, Ponded Water Repaired, Mam  
 2/1/2008  Status Report    69
 2/5/2008  Letter   Status Of Compliance Letter Sent To County (Only Dep Review Of Sar Pending)  69
 3/14/2008  Gas Monitoring Report   Mam, No Exceedences  
 5/8/2008  Leachate Report    
 5/8/2008  Leachate Report    
 5/8/2008  Waste Quantity Report    
 5/9/2008  Site Inspection    
 7/9/2008  Submittal Received By Department    
 7/16/2008  Gas Monitoring Report    
 7/16/2008  Groundwater Monitoring Report    
 9/10/2008  Site Inspection   Financial Assurance Cost Estimates Received By The Department, Not Yet Approved. | Could Not Locate All Wells, Gas Probes Due To Weather.  
 11/24/2008  Financial Assurance Documents    
 12/16/2008  Site Inspection    
 1/8/2009  Letter    
 2/18/2009  Contamination Assessment Report    
 5/6/2009  Site Inspection   Item 1. The Facility Was Conducting Maintenance On The Main Leachate Pumps In Phase 1a. While Removing The Pump, It Became Lodged In The Pipe. Further Investigations Concluded The Pipe Was Malformed In An Area About 5-6 Feet From The Bottom, And The  
 5/7/2009  Gas Monitoring Report    
 5/7/2009  Leachate Report    
 5/7/2009  Leachate Report    
 5/7/2009  Gas Monitoring Report    
 5/7/2009  Leachate Report    
 5/7/2009  Gas Monitoring Report    
 5/7/2009  Gas Monitoring Report    
 5/7/2009  Leachate Report    
 5/18/2009  Waste Quantity Report    
 5/18/2009  Leachate Report    
 5/18/2009  Waste Quantity Report    
 5/18/2009  Groundwater Monitoring Report    
 5/18/2009  Leachate Report    
 5/18/2009  Leachate Report    
 5/18/2009  Leachate Report    
 5/18/2009  Leachate Report    
 5/18/2009  Leachate Report    
 5/18/2009  Leachate Report    
 5/18/2009  Leachate Report    
 5/18/2009  Waste Quantity Report    
 5/18/2009  Waste Quantity Report    
 5/22/2009  Gas Monitoring Report    
 6/4/2009  Submittal Received By Department    
 6/4/2009  Letter    
 7/13/2009  Enforcement Tracking    5571
 7/13/2009  Enforcement Referral   Closed  
 7/23/2009  Warning Letter    5571
 8/11/2009  Submittal Received By Department    
 8/11/2009  Financial Assurance Documents    
 9/29/2009  Site Inspection   Minor Ponding Observed In The Yt Area. The Grinder Contractor Will Be At The Site On October 5 And The Pad Will Be Re-Graded At That Time. | Department Staff Observed Bulbs In The Citizen Service Area In The Open Pvc Tubes. Operator Indicated That Ar  
 10/16/2009  Consent Order    5571
 11/1/2009  Groundwater Monitoring Report    
 11/3/2009  Penalty    5571
 12/28/2009  Submittal Received By Department    
 12/28/2009  Gas Monitoring Report    
 12/28/2009  Waste Quantity Report    
 12/28/2009  Leachate Report    
 12/28/2009  Leachate Report    
 12/28/2009  Leachate Report    
 2/24/2010  Groundwater Monitoring Report    
 4/19/2010  Site Inspection   Facility Is Currently Filling Phase 2/2a At Elevation 160 (Approx) Toward The West. | Department Staff Observed Gas System Construction Near Completion. Facility Expects A Test Start Of The Flare On 04-21-10. | Six New Gas Vents Were Observed Adjacen  
 5/3/2010  Leachate Report    
 5/3/2010  Leachate Report    
 5/3/2010  Gas Monitoring Report    
 5/3/2010  Gas Monitoring Report    
 5/3/2010  Leachate Report    
 5/3/2010  Waste Tire Collector Registration - Incoming    
 5/4/2010  Leachate Report    
 5/4/2010  Leachate Report    
 5/4/2010  Submittal Received By Department    
 5/4/2010  Leachate Report    
 5/4/2010  Leachate Report    
 5/4/2010  Waste Tire Collector Registration - Incoming    
 5/4/2010  Gas Monitoring Report    
 5/4/2010  Leachate Report    
 5/20/2010  Groundwater Monitoring Report    
 7/26/2010  Submittal Received By Department    
 9/23/2010  Site Inspection   Item 2.11, 2.16 - A Berm Adjacent To The Traffic Area Appeared To Have Been Made From Peeled Up Cover And Contained Exposed Waste. The Loader Operator Was Placing Additional Cover On The Berm During The Inspection. The Berm Also Appeared Steeper Than  
 2/8/2011  Site Inspection   Comments: 1. According To The Facility'S Rain Log, The Following Amount Of Rain Was Received For The Three Days Preceding The Inspection: February 5: 0.3 Inches; February 6: 1 Inch; And February 7: 0.59 Inches. As A Result Of This Amount Of Rain  
 4/22/2011  Submittal Received By Department    
 4/22/2011  Gas Monitoring Report    
 4/22/2011  Leachate Report    
 4/22/2011  Gas Monitoring Report    
 4/22/2011  Gas Monitoring Report    
 5/9/2011  Groundwater Monitoring Report    
 5/9/2011  Groundwater Monitoring Report    
 5/19/2011  Site Inspection   Items 1.7 - Gw Review Pending Item 2.37, 3.12 & 3.13 - Did Not Observe All Well Locations Item 2.28 - See Items 2.19 & 2.21 Item 2.29 - A Large Quantity Of Sw Was Observed On Top Of The Phase Iii Rain Cell Cover Which Appears To Have Been Th  
 6/6/2011  Gas Monitoring Report    
 7/25/2011  Gas Monitoring Report    
 9/14/2011  Gas Monitoring Report    
 9/15/2011  Site Inspection   Item 1.7 - Monitoring Results Pending Dept. Review Item 2.27 - Ew-5 (Gas Well) Appeared To Be Leaking At Boot. It Appeared That The Boot Had Been Temporarily Repaired (W/ Duct Tape) But The Repair Had Also Failed. Department Staff Received Documen  
 10/27/2011  Financial Assurance Documents    
 1/25/2012  Site Inspection   Item 1.7 - Monitoring Results Pending Dept Review | Item #2.22 - The Leachate Cleanout On East Side Of Phase 2 Is No Longer Straight Down The Interior Slope Of Phase 2. According The Landfill Manager, The Cleanout Has Been Realligned By Settlement An  
 5/17/2012  Site Inspection   Item 1.7 - Gw Results Not Reviewed As Part Of This Inspection Item 1.9 - Financial Assurance Funding Mechanism Reviewed By Tallahassee Item 2.13, 2.28, 2.29 - During The Inspection, The Facility Was Filling Near The Middle Of Phase Iii. The Wes  
 5/22/2012  Gas Monitoring Report    
 5/22/2012  Gas Monitoring Report    
 6/27/2012  Site Inspection   The Purpose Of This Inspection Was To Observe Site Conditions After Tropical Storms (Ts) Beryl And Debby (May 28-29 & June 23-26, 2012 Respectively). The Department Received Notification Beginning June 1, 2012 From Mr. Casey Stephens, Solid Waste Dir  
 7/6/2012  Groundwater Monitoring Report    
 7/9/2012  Groundwater Monitoring Report    
 7/9/2012  Groundwater Monitoring Report    
 9/11/2012  Gas Monitoring Report    
 9/11/2012  Gas Monitoring Report    
 9/12/2012  Site Inspection   Item 1.7 - Gw Results Not Evaluated As Part Of This Inspection. Items 1.9, 1.10 - Annual Face Estimates Pending Review. Funding Is Evaluated Post-District Face Review. Item 2.13 - During The Inspection, The Wf Was Located Within The First "Thi  
 9/26/2012  Cost Estimates    
 3/12/2013  Site Inspection   The Purpose Of This Site Visit Was For Department Staff To Observe Conditions After A Reported Fire Within The Class I, Phase Iii Footprint. The Department Received Notification Of The Fire On Sunday, March 10, 2013 Via Telephone Message, Followed By  
 6/21/2013  Site Inspection   Item 1.6 - Gw Results Not Reviewed As Part Of This Inspection. Item 1.8, 1.9 - Did Not Review As Part Of This Inspection. Item 2.13 - During The Inspection, Facility Was Filling In Phase Ii Due To Phase Iii Fire Damage. Item 2.22 - Citrus C  
 10/22/2013  Gas Monitoring Report    
 10/22/2013  Gas Monitoring Report    
 10/22/2013  Gas Monitoring Report    
 10/22/2013  Gas Monitoring Report    
 12/10/2013  Site Inspection   Item 1.6 - Gw Results Not Reviewed As Part Of This Inspection. Item 2.37, 3.12, 3.13, 3.17 - Did Not Check All Locations During The Inspection.  
 2/11/2014  Gas Monitoring Report    
 2/25/2014  Site Inspection   Item 1.6 - Gw Results Not Reviewed As Part Of This Inspection Item 2.22 - During The Inspection, The Pressure Relief Valve On Leachate Forcemain Piping Appeared To Be Leaking. Facility Staff To Repair Following Inspection. No Additional Informatio  
 12/4/2014  Gas Monitoring Report    
 12/11/2014  Cost Estimates    
 1/15/2015  Gas Monitoring Report    
 7/15/2015  Gas Monitoring Report    
 7/16/2015  Gas Monitoring Report    
 7/27/2015  Site Inspection   Item 1.9 -- The Annual Inflation-Adjusted Financial Assurance Cost Estimate Due By Sept. 1, 2015 (See Spec. Cond. #D.4.A., Of Permit #21375-018-So/01) Does Not Need To Be Submitted Provided That The Revised Financial Assurance Cost Estimates Required  
 9/22/2015  Gas Monitoring Report    
 10/12/2015  Leachate Report    
 6/27/2016  Site Inspection   Item 3.6: Please Continue To Monitor And Maintain The Portions Of The Landfill That Have Been Closed, This Includes But Is Not Limited To Preventing Ponding Water, Damage To The Barrier Layer, Repairing Any Differential Settlement. Item 9.17: Ple  
 8/18/2016  Written Compliance Assitance Offer    
 2/22/2017  Site Inspection   1.2 - It Appears That A Landfill Survey Was Conducted In September 2016 But An Annual Estimate Of Remaining Life Was Not Received. Please Provide. 1.8 - Please Be Reminded That The Wording In The Next Audit Note Submitted Should Be Revised Per The Re  
 5/16/2017  Gas Monitoring Report    
 6/16/2017  Groundwater Monitoring Report    
 4/23/2018  Leachate Report    
 5/18/2018  Groundwater Monitoring Report    
 7/19/2018  Site Inspection   During The Inspection, The Leachate Treatment Plant Was Being Demolished And The Leachate Tanks Were Being Emptied For Inspection/Repair.  
 7/20/2018  Gas Monitoring Report    
 7/20/2018  Gas Monitoring Report    
 7/20/2018  Groundwater Monitoring Report    
 7/20/2018  Leachate Report    
 8/9/2018  Cost Estimates   Next Due 9/1/2019  
 8/27/2018  Technical Review    
 9/5/2018  Gas Monitoring Report    
 9/5/2018  Gas Monitoring Report    
 10/22/2018  Leachate Report    
 12/6/2018  Gas Monitoring Report    
 1/29/2019  Leachate Report    
 5/14/2019  Groundwater Monitoring Report    
 6/5/2019  Site Inspection   1.6 - Groundwater Monitoring Data Was Reviewed For Groundwater Standard Exceedances, Completeness, And Quality Assurance/Quality Control (Qa/Qc); However, A Review Of Historical Data Trending Was Not Performed 2.17 & 2.19- The Working Face Appeared  
 6/19/2019  Leachate Report    
 6/19/2019  Gas Monitoring Report    
 7/19/2019  Leachate Report    
 9/16/2019  Cost Estimates    
 10/3/2019  Site Inspection   Item 1.6: Groundwater Monitoring Data Was Reviewed For Groundwater Standard Exceedances, Completeness, And Quality Assurance/Quality Control (Qa/Qc); However, A Review Of Historical Data Trending Was Not Performed Item 9.10: The Annual Fire Inspecti  
 10/18/2019  Gas Monitoring Report    
 10/18/2019  Gas Monitoring Report    
 10/18/2019  Leachate Report    

Violation History

Vio# Area Regulation Opened
By
Date
Determined
Completed ETA Act Act Date Regulation Text Excerpt   (mouse over for more text)
AOC    62-701.300(4), 62-701.300(5), 62-701.300(6), 62-701.300(8)(a), 62-701.300(8)(c), 62-701.300(8)(d), 62-701.300(8)(e), 62-701.300(9), 62-701.300(10), 62-701.300(11)(a), 62-701.300(11)(b)  Gaskin_N  5/9/2008  9/12/2008    426 5/9/2008   Hazardous waste. No hazardous waste shall be disposed of in a solid waste management facility unless such facility is permitted pursuant to Chapter 62-730, F.A.C., PCBs. Disposal of liquids containing a polychlorinated biphenyl (PCB), or non-liquid P
AOC    62-701.300(4), 62-701.300(5), 62-701.300(6), 62-701.300(8)(a), 62-701.300(8)(c), 62-701.300(8)(d), 62-701.300(8)(e), 62-701.300(9), 62-701.300(10), 62-701.300(11)(a), 62-701.300(11)(b)  Gaskin_N  5/9/2008  9/12/2008    426 5/9/2008   Hazardous waste. No hazardous waste shall be disposed of in a solid waste management facility unless such facility is permitted pursuant to Chapter 62-730, F.A.C., PCBs. Disposal of liquids containing a polychlorinated biphenyl (PCB), or non-liquid P
AOC    62-701.300(4), 62-701.300(5), 62-701.300(6), 62-701.300(8)(a), 62-701.300(8)(c), 62-701.300(8)(d), 62-701.300(8)(e), 62-701.300(9), 62-701.300(10), 62-701.300(11)(a), 62-701.300(11)(b)  Gaskin_N  5/9/2008  9/12/2008    426 5/9/2008   Hazardous waste. No hazardous waste shall be disposed of in a solid waste management facility unless such facility is permitted pursuant to Chapter 62-730, F.A.C., PCBs. Disposal of liquids containing a polychlorinated biphenyl (PCB), or non-liquid P
AOC    62-701.320(1)  Gaskin_N  5/9/2008  9/12/2008    426 5/9/2008   Permit requirements. Except as otherwise provided in this chapter, no solid waste management facility shall be constructed, operated, maintained, modified, or closed without a permit issued by the Department, or by an approved local program acting un
AOC    62-701.500(2)  Gaskin_N  5/9/2008  9/12/2008    426 5/9/2008   Operation plan. Each landfill owner or operator shall have an operational plan that provides written, detailed instructions for the daily operation of the landfill. The operation plan shall be kept at or near the landfill facility and shall be access
   62-701.500(7)(e)  Gaskin_N  5/9/2008  12/17/2008    426 5/9/2008   Initial cover shall be applied and maintained at landfills in order to minimize any adverse environmental, safety, or health effects such as those resulting from birds, unauthorized wastes, blowing litter, odors, disease vectors, or fires. The minimu
AOC    62-701.500(7)(i), 62-701.500(11)(f)  Gaskin_N  5/9/2008  9/10/2008    426 5/9/2008   A litter policing operation shall be employed to keep litter from leaving the working area of the landfill. Litter outside the working area shall be picked up within 24 hours. Some litter may be exposed through the initial cover if it is in traffic a
AOC    62-701.320(1)  Gaskin_N  5/15/2008  9/12/2008    426 5/15/2008   Permit requirements. Except as otherwise provided in this chapter, no solid waste management facility shall be constructed, operated, maintained, modified, or closed without a permit issued by the Department, or by an approved local program acting un
   62-701.500(7)(e)  Madden_M  9/10/2008  12/17/2008    1898 9/10/2008   Initial cover shall be applied and maintained at landfills in order to minimize any adverse environmental, safety, or health effects such as those resulting from birds, unauthorized wastes, blowing litter, odors, disease vectors, or fires. The minimu
   62-701.500(7)(f)  Madden_M  9/10/2008  12/17/2008    1898 9/10/2008   An intermediate cover in addition to the six-inch initial cover shall be applied and maintained within seven days of cell completion if additional solid waste will not be deposited within 180 days of cell completion. The landfill operator may remove
AOC    62-701.320(1)  Madden_M  9/12/2008  12/17/2008    1898 9/12/2008   Permit requirements. Except as otherwise provided in this chapter, no solid waste management facility shall be constructed, operated, maintained, modified, or closed without a permit issued by the Department, or by an approved local program acting un
AOC    62-701.500(2)  Madden_M  9/12/2008  12/17/2008    1898 9/12/2008   Operation plan. Each landfill owner or operator shall have an operational plan that provides written, detailed instructions for the daily operation of the landfill. The operation plan shall be kept at or near the landfill facility and shall be access
   62-701.510(3), 62-701.510(4)  Madden_M  9/16/2008  6/1/2009    1898 9/16/2008   Ground water monitoring., Surface water monitoring.
AOC    62-701.320(1)  Gaskin_N  12/17/2008  5/6/2009    3321 12/17/2008   Permit requirements. Except as otherwise provided in this chapter, no solid waste management facility shall be constructed, operated, maintained, modified, or closed without a permit issued by the Department, or by an approved local program acting un
AOC    62-701.500(2)  Gaskin_N  12/17/2008  5/6/2009    3321 12/17/2008   Operation plan. Each landfill owner or operator shall have an operational plan that provides written, detailed instructions for the daily operation of the landfill. The operation plan shall be kept at or near the landfill facility and shall be access
AOC    62-701.500(7)(e)  Gaskin_N  12/17/2008  5/6/2009    3321 12/17/2008   Initial cover shall be applied and maintained at landfills in order to minimize any adverse environmental, safety, or health effects such as those resulting from birds, unauthorized wastes, blowing litter, odors, disease vectors, or fires. The minimu
   62-701.500(7)(f)  Gaskin_N  12/17/2008  5/6/2009    3321 12/17/2008   An intermediate cover in addition to the six-inch initial cover shall be applied and maintained within seven days of cell completion if additional solid waste will not be deposited within 180 days of cell completion. The landfill operator may remove
AOC    62-701.320(1)  Frazier_D  5/6/2009  8/11/2009    120000000000011 5/6/2009   Permit requirements. Except as otherwise provided in this chapter, no solid waste management facility shall be constructed, operated, maintained, modified, or closed without a permit issued by the Department, or by an approved local program acting un
AOC    62-701.400(9)(c), 62-701.500(10)  Frazier_D  5/6/2009  8/11/2009    120000000000011 5/6/2009   Stormwater management systems shall be designed to avoid mixing of stormwater with leachate. Stormwater or other surface water which comes into contact with the landfilled solid waste or mixes with leachate shall be considered leachate and is subject
AOC    62-701.500(2)  Frazier_D  5/6/2009  8/11/2009    120000000000011 5/6/2009   Operation plan. Each landfill owner or operator shall have an operational plan that provides written, detailed instructions for the daily operation of the landfill. The operation plan shall be kept at or near the landfill facility and shall be access
   62-701.500(7)(e)  Frazier_D  5/6/2009  8/11/2009    120000000000011 5/6/2009   Initial cover shall be applied and maintained at landfills in order to minimize any adverse environmental, safety, or health effects such as those resulting from birds, unauthorized wastes, blowing litter, odors, disease vectors, or fires. The minimu
AOC    62-701.500(7)(f)  Frazier_D  5/6/2009  8/11/2009    120000000000011 5/6/2009   An intermediate cover in addition to the six-inch initial cover shall be applied and maintained within seven days of cell completion if additional solid waste will not be deposited within 180 days of cell completion. The landfill operator may remove
AOC    62-701.320(1)  Madden_M  9/29/2009  4/19/2010    8000000000032 9/29/2009   Permit requirements. Except as otherwise provided in this chapter, no solid waste management facility shall be constructed, operated, maintained, modified, or closed without a permit issued by the Department, or by an approved local program acting un
AOC    62-701.400(9)(c), 62-701.500(10)  Madden_M  9/29/2009  4/19/2010    8000000000032 9/29/2009   Stormwater management systems shall be designed to avoid mixing of stormwater with leachate. Stormwater or other surface water which comes into contact with the landfilled solid waste or mixes with leachate shall be considered leachate and is subject
AOC    62-701.500(2)  Madden_M  9/29/2009  4/19/2010    8000000000032 9/29/2009   Operation plan. Each landfill owner or operator shall have an operational plan that provides written, detailed instructions for the daily operation of the landfill. The operation plan shall be kept at or near the landfill facility and shall be access
AOC    62-701.500(7)(j)  Madden_M  9/29/2009  4/19/2010    8000000000032 9/29/2009   Erosion control measures shall be employed to correct any erosion which exposes waste or causes malfunction of the storm water management system. Such measures shall be implemented within three days of occurrence. If the erosion cannot be corrected w
AOC    62-701.400(9)(c), 62-701.500(10)  Madden_M  4/19/2010  9/23/2010    120000000000038 4/19/2010   Stormwater management systems shall be designed to avoid mixing of stormwater with leachate. Stormwater or other surface water which comes into contact with the landfilled solid waste or mixes with leachate shall be considered leachate and is subject
AOC    62-701.500(7)(j)  Madden_M  4/19/2010  9/23/2010    120000000000038 4/19/2010   Erosion control measures shall be employed to correct any erosion which exposes waste or causes malfunction of the storm water management system. Such measures shall be implemented within three days of occurrence. If the erosion cannot be corrected w
AOC    62-701.620(2), 403.161  Madden_M  4/19/2010  9/23/2010    120000000000038 4/19/2010   Permit for long-term care. Long-term care shall be conducted in accordance with a closure permit. Closure permits involving only long-term care shall be issued with a duration of ten years unless the owner or operator specifically requests a shorter
AOC    62-709.320(4)(a)3.a.  Madden_M  4/19/2010  9/23/2010    120000000000038 4/19/2010   There shall be an all-weather access road, at least 20 feet wide, all around the perimeter of the site;
AOC    62-709.320(4)(a)3.b.  Madden_M  4/19/2010  9/23/2010    120000000000038 4/19/2010   There shall be interior lanes at least 15 feet wide; and
AOC    62-701.500(11)(d)  Madden_M  9/23/2010  4/25/2011    8000000000055 9/23/2010   Dust control methods;
AOC    62-701.500(7)(e)  Madden_M  9/23/2010  4/26/2011    8000000000055 9/23/2010   Initial cover shall be applied and maintained at landfills in order to minimize any adverse environmental, safety, or health effects such as those resulting from birds, unauthorized wastes, blowing litter, odors, vectors, or fires. The minimum freque
AOC    62-701.620(1)  Madden_M  9/23/2010  4/25/2011    8000000000055 9/23/2010   Long-term care period. The owner or operator of any landfill which receives wastes after January 6, 1993, shall continue to monitor and maintain the integrity and effectiveness of the final cover as well as other appurtenances of the facility, contro
AOC    62-701.500(7)(e)  Frazier_D  4/25/2011  5/19/2011    12290 4/25/2011   Initial cover shall be applied and maintained at landfills in order to minimize any adverse environmental, safety, or health effects such as those resulting from birds, unauthorized wastes, blowing litter, odors, vectors, or fires. The minimum freque
AOC    62-701.620(1)  Frazier_D  4/26/2011  6/29/2011    12290 4/26/2011   Long-term care period. The owner or operator of any landfill which receives wastes after January 6, 1993, shall continue to monitor and maintain the integrity and effectiveness of the final cover as well as other appurtenances of the facility, contro
AOC    62-701.500(7)(f)  Madden_M  5/19/2011  9/14/2011    8000000000062 5/19/2011   An intermediate cover in addition to the six-inch initial cover shall be applied and maintained within seven days of cell completion if additional solid waste will not be deposited within 180 days of cell completion. The landfill operator may remove
AOC    62-701.500(7)(j)  Madden_M  5/19/2011  9/14/2011    8000000000062 5/19/2011   Erosion control measures shall be employed to correct any erosion which exposes waste or causes malfunction of the storm water management system. Such measures shall be implemented within three days of occurrence. If the erosion cannot be corrected w
AOC    62-701.500(2)(j), 62-701.500(8)(b), 62-701.500(8)(h)  Madden_M  5/22/2012  7/10/2012    156603 5/22/2012   Maintaining and cleaning the leachate collection system., The landfill operator is responsible for the operation of the leachate collection and removal system and for maintaining the system as designed for the design period. Leachate shall be collect
AOC    62-701.500(7)(f)  Madden_M  10/17/2013  2/11/2014    161478 10/17/2013   An intermediate cover in addition to the six-inch initial cover shall be applied and maintained within seven days of cell completion if additional solid waste will not be deposited within 180 days of cell completion. The landfill operator may remove
AOC    62-701.500(10), 62-701.400(9)(b)  Madden_M  10/18/2013  2/11/2014    161478 10/18/2013   Stormwater system management. Stormwater management systems shall be operated and maintained as necessary to meet the requirements of subsection 62-701.400(9), F.A.C., Stormwater or other surface water which comes into contact with the landfilled sol
AOC    62-701.500(10), 62-701.400(9)(b)  Madden_M  10/18/2013  2/11/2014    161478 10/18/2013   Stormwater system management. Stormwater management systems shall be operated and maintained as necessary to meet the requirements of subsection 62-701.400(9), F.A.C., Stormwater or other surface water which comes into contact with the landfilled sol
AOC    62-701.500(7)(e)  Madden_M  2/11/2014  7/29/2014    162374 2/11/2014   Initial cover shall be applied and maintained at landfills in order to minimize any adverse environmental, safety, or health effects such as those resulting from birds, unauthorized wastes, blowing litter, odors, vectors, or fires. The minimum freque
AOC    62-701.500(7)(e)  Madden_M  7/29/2014  8/14/2015    163878 7/29/2014   Initial cover shall be applied and maintained at landfills in order to minimize any adverse environmental, safety, or health effects such as those resulting from birds, unauthorized wastes, blowing litter, odors, vectors, or fires. The minimum freque
AOC    62-701.500(10), 62-701.400(9)(b)  Roff_N  8/14/2015  7/13/2016    168219 8/14/2015   Stormwater system management. Stormwater management systems shall be operated and maintained as necessary to meet the requirements of subsection 62-701.400(9), F.A.C., Stormwater or other surface water which comes into contact with the landfilled sol
AOC    62-701.500(2)(j), 62-701.500(8)(b), 62-701.500(8)(h)  Roff_N  8/14/2015  7/13/2016    168219 8/14/2015   Maintaining and cleaning the leachate collection system., The landfill operator is responsible for the operation of the leachate collection and removal system and for maintaining the system as designed for the design period. Leachate shall be collect
AOC    62-701.500(7)(e)  Roff_N  8/14/2015  7/8/2016    168219 8/14/2015   Initial cover shall be applied and maintained at landfills in order to minimize any adverse environmental, safety, or health effects such as those resulting from birds, unauthorized wastes, blowing litter, odors, vectors, or fires. The minimum freque
AOC    62-701.500(7)(f)  Roff_N  8/14/2015  7/8/2016    168219 8/14/2015   An intermediate cover in addition to the six-inch initial cover shall be applied and maintained within seven days of cell completion if additional solid waste will not be deposited within 180 days of cell completion. The landfill operator may remove
AOC    62-701.600(3)(f)3.  Roff_N  8/14/2015  7/14/2016    168219 8/14/2015   Top gradients of final cover on landfill areas shall be graded to maximize runoff and minimize erosion, considering total fill height and expected subsidence caused by decomposing waste, and shall be designed to prevent ponding or low spots.
AOC    62-701.600(3)(f)4.  Roff_N  8/14/2015  7/14/2016    168219 8/14/2015   The closure design plan shall describe provisions for cover material for the long-term care erosion control, filling areas of subsidence or other depressions, maintaining berms, and general maintenance of the facility, and specify the anticipated sou
AOC    62-701.620(1)  Roff_N  8/14/2015  7/14/2016    168219 8/14/2015   Long-term care period. The owner or operator of any landfill which receives wastes after January 6, 1993, shall continue to monitor and maintain the integrity and effectiveness of the final cover as well as other appurtenances of the facility, contro
AOC    62-713.400(3), 62-701.510(3), 62-701.510(4), 62-701.730(8)(f), 62-701.730(10)  Roff_N  8/14/2015  8/18/2016    168219 8/14/2015   Water quality monitoring plan. A water quality monitoring plan which meets the requirements of Rule 62-701.510 and Chapter 62-522, F.A.C. and is based upon the hydrogeological investigation required in paragraph 62-713.300(3)(c), F.A.C., shall be inc
AOC    62-701.500(10), 62-701.400(9)(b)  Roff_N  7/13/2016  2/22/2017    170807 7/13/2016   Stormwater system management. Stormwater management systems shall be operated and maintained as necessary to meet the requirements of subsection 62-701.400(9), F.A.C., Stormwater or other surface water which comes into contact with the landfilled sol
AOC    62-701.500(9), 62-701.530(1)(a)3.  Roff_N  7/13/2016  6/20/2017    170807 7/13/2016   Gas monitoring. All landfills that have received degradable wastes shall implement a gas management system to meet the requirements of Rule 62-701.530, F.A.C., Be designed to reduce gas pressure in the interior of the landfill by collecting the gases
AOC    62-709.320(2)(a)3.a.  Roff_N  7/13/2016  8/15/2017    170807 7/13/2016   There shall be an all-weather access road, at least 20 feet wide, all around the perimeter of the site;
   62-713.400(3), 62-701.510(3), 62-701.510(4), 62-701.730(8)(f), 62-701.730(10)  Roff_N  7/13/2016  7/31/2017    170807 7/13/2016   Water quality monitoring plan. A water quality monitoring plan which meets the requirements of Rule 62-701.510 and Chapter 62-522, F.A.C. and is based upon the hydrogeological investigation required in paragraph 62-713.300(3)(c), F.A.C., shall be inc
AOC    62-701.500(7)(d)  Tift_R  6/26/2017  8/27/2018    173484 6/26/2017   The working face shall be only wide enough to accommodate vehicles discharging waste, and to minimize the exposed area and unnecessary use of cover material.
   62-713.400(3), 62-701.510(3), 62-701.510(4), 62-701.730(8)(f), 62-701.730(10)  Tift_R  6/26/2017  10/7/2019    173484 6/26/2017   Water quality monitoring plan. A water quality monitoring plan which meets the requirements of Rule 62-701.510 and Chapter 62-522, F.A.C. and is based upon the hydrogeological investigation required in paragraph 62-713.300(3)(c), F.A.C., shall be inc
AOC    62-701.500(7)(e)  Tift_R  6/28/2017  8/27/2018    173484 6/28/2017   Initial cover shall be applied and maintained at landfills in order to minimize any adverse environmental, safety, or health effects such as those resulting from birds, unauthorized wastes, blowing litter, odors, vectors, or fires. The minimum freque
AOC    62-701.500(7)(f)  Tift_R  6/28/2017  8/27/2018    173484 6/28/2017   An intermediate cover in addition to the six-inch initial cover shall be applied and maintained within seven days of cell completion if additional solid waste will not be deposited within 180 days of cell completion. The landfill operator may remove